Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-00024
StatusFinaled
Name BRIGHTON STUDIO INC
Site Address 3346 E EXACTA LN
Project NamePP-04-5102 F1
Customer NumberBLD18-00023 EPLAN
ePlanReview 
Description
(3 PERMITS FILED UNDER BLD18-00023 IN EPLANREVIEW) Approved LOMR on file for Floodplain. Permit for the construction of a new 1740 sq. ft., 3 story (first story 380 sq. ft., second story 940 sq. ft., third story 420 sq. ft.) Townhouse with 3 bedrooms, 3 bathrooms, approximately 42 sq. ft. of covered patio/porch, 65 sq. ft. covered balcony, and a 500 sq. ft. attached garage per the approved plans and any notations. SP-02 zoning and setbacks per planning. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/8/201810/9/201810/9/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Braxton Hansen
DOC - Permit Finaled10/9/201810/9/201810/9/2018PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results10/9/201810/9/201810/9/2018ADONE
DetailsBrandon Shaw
ACH50- 6
BLD-Energy code compliance6/28/20186/28/20186/28/2018PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Braxton Hansen
BLD-Framing/Rough-in6/26/20186/27/20186/27/2018APASS
DetailsBrandon Shaw
OK to insulate
BLD-Wall Bracing6/7/20186/8/20186/8/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Wall Bracing6/7/20186/7/20186/7/2018PCANC
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Braxton Hansen
BLD-Foundation3/2/20183/5/20183/5/2018APASS
DetailsBrandon Shaw
Work in progress

Frost protection required
BLD-Footing3/1/20183/1/20183/1/2018PPASS
DetailsBrandon Shaw
Work in progress

Frost protection required
Issue PAID IN FULL permit  2/16/2018 DONE
Inspection Record Card- Bld  2/16/2018 DONE
OVERRIDE  2/2/2018  
Plan assigned to (BJM)1/16/20181/16/20182/2/2018 DONE
DetailsBrian McGowan
2-2 townhome L2 Eplan
Routing - PLAN CHECK1/16/2018 2/2/2018 PASS
DetailsBrian McGowan
1st review completed  2/2/2018 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  2/2/2018 DONE
DetailsBrian McGowan
Permit Ready to Issue  2/2/2018 DONE
met
Routing PW Flood Plain1/16/2018 2/1/2018 PASS
DetailsJason C. Taylor
Approved LOMR on File. No floodplain review required. JCT
Routing - MECHANICAL1/16/2018 1/31/2018 PASS
DetailsTroy James
Manual j uploaded to bld18-00023
Route to Impact Fee Review1/16/20181/19/20181/17/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PLANNING1/16/2018 1/17/2018 PASS
DetailsKatelyn Menuge
DRH17-00173
Routing - Addressing1/16/2018 1/16/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS  1/16/2018 PASS
Plans ACCEPTED BY PLAN TECH  1/16/2018 DONE
Intake Approval  1/16/2018 PASS
Recd Pcfee & Taken To Pln CK  1/16/2018 DONE
Intake Approval  1/10/2018 FAIL
need 2012 IRC/IBC review request because engineeering is 2012
Intake Approval  1/5/2018 FAIL
need letter to request 2012 IRC review and upload approved letter to elpan or update codes to 2015.


Application received 1/4/2018   
Application received 1/4/2018