First Notice | | 7/23/2018 | 8/8/2018 | | DONE |
|
|
|
mailed 8-10-18
|
Permanent Occupancy | | | 7/13/2018 | | DONE |
|
|
|
|
BLD-Final | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | PASS |
Jim Storey
|
|
|
HVAC final pending airbalance in AM, all other finals complete Phone #: ###-#### Inspection requested via web by Ryan Wilhelm final ok pending mech
|
BLD-Final | 6/25/2018 | 6/26/2018 | 6/25/2018 | A | CANC |
Jim Storey
|
|
|
Request first/early inspect before 10am if possible. HVAC final to happen first thing AM, all others passed. Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm Inspection cancelled from web by: Ryan Wilhelm
|
BLD-Final | 6/24/2018 | 6/25/2018 | 6/25/2018 | P | CANC |
Jim Storey
|
|
|
Finishing Fire/HVAC in AM, Elec/Plumbing finaled. Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm Inspection cancelled from web by: Ryan Wilhelm
|
FIRE-Final Inspection | 6/24/2018 | 6/25/2018 | 6/25/2018 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguisher is in place with a current inspection tag, thumbturn deadbolts on south exit doors to be replaced with blanks before final BLD inspection, addressing will be installed when cracked front window is replaced. Final life fire safety inspection complete.
To coincide with alarm and sprinkler finals, as per their permit inspections. Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
|
BLD-Ceiling Grid Inspection | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PASS |
Jim Storey
|
|
|
Ceiling cover for grid; trades should be done in AM Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
|
BLD-Framing/Rough-in | 4/30/2018 | 5/1/2018 | 5/1/2018 | A | PASS |
Jim Storey
|
|
|
Framing inspections. All trade rough-ins passed for cover. Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
|
Issue PAID IN FULL permit | | | 4/10/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/10/2018 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 2/22/2018 | 2/22/2018 | 4/9/2018 | | DONE |
Julie Romig
|
|
|
1st Rev Comp - L3 Amore Nail Studio TI
|
Routing - PLUMBING | 4/6/2018 | | 4/9/2018 | | PASS |
Daryl Spivey
|
|
|
per plans and ISPC
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/9/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/9/2018 | | DONE |
|
|
|
Need (when this permit issued, close out early start BLD18-000984 and move over sub permits attached to early start)
Revised Cert of Value - Met
|
Routing - PLAN CHECK | 4/6/2018 | | 4/6/2018 | | PASS |
Julie Romig
|
|
|
|
Route to Impact Fee Review | 3/21/2018 | 3/24/2018 | 3/21/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLUMBING | 3/19/2018 | | 3/21/2018 | | PASS |
Daryl Spivey
|
|
|
2nd Review. Vacuum breaker required if filler is a hand held faucett.
|
1st review completed | | | 3/21/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 2/22/2018 | | 3/21/2018 | | FAIL |
Julie Romig
|
|
|
Drinking Fountain required
|
Routing - MECHANICAL | 3/19/2018 | | 3/19/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Routing Off Site - STRUCTURAL | 2/22/2018 | | 3/7/2018 | | PASS |
Julie Romig
|
|
|
Passed per ePlanReview
|
Routing - FIRE | 2/22/2018 | 2/22/2018 | 2/27/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - MECHANICAL | 2/22/2018 | | 2/27/2018 | | FAIL |
Chad Schwendiman
|
|
|
Please verify fan controls for EF 3, & 4. It appears as though it should be key note 5
|
Routing - PUBLIC WORKS | 2/22/2018 | | 2/23/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 2/22/2018 | | 2/23/2018 | | PASS |
Andy J. Long
|
|
|
No ESC permit required
|
Intake Approval | | | 2/22/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Julie accepted pre screen
|
Routing - PLUMBING | 2/22/2018 | | 2/22/2018 | | FAIL |
Daryl Spivey
|
|
|
Provide information on pedicure chairs for waste and water connections.
|
Routing - Addressing | 2/22/2018 | | 2/22/2018 | | PASS |
Doug Chausow
|
|
|
|
Application received | | | 1/4/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 4 2018 11:18AM
|