Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD18-00055
StatusFinaled
Name TS4 LLC
Site Address 10603 W JAVA DR
Project Name 
Customer Number 
ePlanReviewNo
Description
(1976 MH being moved from Oregon to this location) Application for inspection for installation of a manufactured home at above location. Inspector will verify that setbacks meet the City's recommendation and that tie downs meet manufacturer's requirements. Documents pertaining to tie down requirements must be at the job site at the time of inspection. This inspection is required prior to occupancy. A separate electrical, plumbing, and/or mechanical permit may be required.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Other1/11/20191/11/20191/11/2019PDONE
DetailsJim Sly
Check ground clearance from coach
C/N....not allowed to park on un- improved surface located at setback along Five Mile Rd. Provide off street parking. Provide Min. 6" clearance from Mfg. walls, to finished grade per State Statute code sect. 44-2201 (2).
BLD-Final10/26/201810/26/201810/26/2018PPASS
DetailsBrandon Shaw
call 20 mins heads up-Tim Phone #: ###-####
DOC - Permit Finaled10/26/201810/26/201810/26/2018PPASS
DetailsBrandon Shaw
BLD-Final10/24/201810/25/201810/25/2018AFAIL
DetailsJim Sly
Tim Phone #: ###-####
Need smoke Det. in each Bedroom. Need 36 x36 hard surface landing at front door. all other provisions have been met. can final when above items are complete.
Plan Reviewer's activity  8/8/2018 DONE
DetailsJason Blais
State Mobile Home Compliance Rehabilitation Certificate received and attached to this case.
BLD-Other7/25/20187/26/20187/26/2018ADONE
DetailsJim Sly
Contacted Terra with State, no certification applications received. Post property Do Not Occupy
BLD-Conference3/19/20183/19/20183/19/2018PDONE
DetailsJim Sly
C/N Tag shows coach built in Jan, 76. Provide Idaho state certification to all mfg homes built prior to June 15 1976.
BLD-Conference3/17/20183/19/20183/19/2018ACANC
DetailsJim Sly
BLD-Other2/5/20182/5/20182/5/2018PPASS
DetailsJim Sly
Block and Tie // Tim Phone #: ###-####
Route to Impact Fee Review1/8/20181/11/20181/9/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing Walk-In (Zoning)1/8/20181/8/20181/8/2018ADONE
DetailsTisha Gallop
O.K. as corrected
Permit Ready to Issue  1/8/2018 DONE
Issue PAID IN FULL permit  1/8/2018 DONE
Application received 1/8/2018