Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD18-00087
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 9931 W EMERALD ST
Project NameEaton
Customer Number 
ePlanReviewYes
Description
(EATON) This building is fully fire sprinklered for area increase. Permit to create a 2,648 sq. ft. office/warehouse in an existing shell tenant space within a 18,886 sq. ft. building. Approval is contingent upon adhering to the approved plans on file and the attached engineering. Work to include: construction of select interior nonbearing walls to create open office areas, a conference room, an entry area, a break room, a copy area, an IT room, a warehouse area and (2) accessible restrooms, new door/door frames, new suspended acoustic and gypsum ceilings, new light fixtures, structural modification to select existing roof joist for new rooftop air unit, electrical work, plumbing work, mechanical work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. Note: Structural engineering and modifications to the existing truss system are attached. Special inspection is required see form #310 attached. This building is fully fire sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 6/21/20186/15/2018 DONE
This permit finaled on the web by Brian McCoy
First Notice 6/2/20186/11/2018 DONE
mailed 6-12
BLD-Final5/22/20185/23/20185/23/2018APASS
DetailsMike Jordan
call when on way // Tom Phone #: ###-####. OK for perm occ.
Permanent Occupancy  5/23/2018 DONE
FIRE-Final Inspection4/30/20184/30/20184/30/2018PPASS
DetailsTroy Cobbley
Life safety passed

Tom Phone #: ###-####
BLD-Ceiling Grid Inspection4/11/20184/12/20184/12/2018PPASS
DetailsMike Jordan
Tom Phone #: ###-####
BLD-Framing/Rough-in3/9/20183/12/20183/12/2018APASS
DetailsMike Jordan
Tom Phone #: ###-####. Interior steel stud framed walls and hardlids only ok.
(F) Reprint permit  2/9/2018 DONE
Issue PAID IN FULL permit  2/6/2018 DONE
Print Occupancy Form  2/6/2018 DONE
Plan assigned to (JG)1/13/20181/13/20182/2/2018 PASS
DetailsJavier Guzman
1st rev comp, 1/26 L2 Eaton Office TI ePlan
Routing - PLAN CHECK2/2/2018 2/2/2018 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  2/2/2018 DONE
Permit Ready to Issue  2/2/2018 DONE
DetailsChristina Prado
NEED
GC - met
Rev Cert of Val - met
Route to Impact Fee Review1/25/20181/28/20181/29/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  1/25/2018 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK1/13/2018 1/25/2018 FAIL
DetailsJavier Guzman
Routing - FIRE1/13/20181/13/20181/18/2018 PASS
DetailsScott Arellano
Attached comments to case
Routing - MECHANICAL1/13/2018 1/18/2018 PASS
DetailsTroy James
Routing - PLUMBING1/13/2018 1/16/2018 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - Addressing1/13/2018 1/16/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/13/2018 1/16/2018 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment1/13/2018 1/16/2018 PASS
DetailsMichael Zawacki
Minor TI. No ESCP needed.
Routing PW Environmental1/16/2018 1/16/2018 PASS
DetailsRick Christenson
HAZARDOUS MATERIAL IN SEPERATE PERMIT.
Intake Approval  1/13/2018 PASS
DetailsJavier Guzman
Application received  1/9/2018 DONE
Application submitted via PDS Online on Jan 9 2018 1:36PM