Second Notice | | 8/17/2018 | 8/15/2018 | | DONE |
|
|
|
This permit finaled on the web by Rob Maes
|
First Notice | 7/19/2018 | 7/19/2018 | 8/7/2018 | | DONE |
Dave Hannah
|
|
|
Mailed 8-10-18
|
BLD-Final | 7/18/2018 | 7/19/2018 | 7/19/2018 | A | PASS |
Dave Hannah
|
|
|
Pls contact Greg (Project Mgr) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes
|
DOC - Permit Finaled | 7/19/2018 | 7/19/2018 | 7/19/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 6/1/2018 | 6/4/2018 | 6/4/2018 | P | NR |
Dave Hannah
|
|
|
Pls contact Brad (Foreman) @ ###-#### or Preston (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes
|
Issue PAID IN FULL permit | | | 3/27/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/27/2018 | | DONE |
|
|
|
|
Plan assigned to (JG) | 2/14/2018 | 2/14/2018 | 3/26/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 3/06 L3 St. Mary's solar panel Building/Electrical ePlan, pend eng
|
Routing Off Site - STRUCTURAL | 3/8/2018 | | 3/26/2018 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/26/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/26/2018 | | DONE |
|
|
|
Need
GC Form - met
Revised Cert of Value - met
|
Routing - PLAN CHECK | 3/8/2018 | | 3/12/2018 | | PASS |
Javier Guzman
|
|
|
|
Route to Impact Fee Review | 2/28/2018 | 3/3/2018 | 3/1/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 2/28/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - ELECTRICAL | 2/14/2018 | | 2/28/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 2/14/2018 | | 2/28/2018 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by Stapley Engineering Jan Welch
|
Routing - PLAN CHECK | 2/14/2018 | | 2/28/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 2/14/2018 | 2/14/2018 | 2/23/2018 | | PASS |
Erika Akin
|
|
|
No comments attached
|
Routing PW Drainage | 2/14/2018 | | 2/15/2018 | | PASS |
Brian Murphy
|
|
|
|
Intake Approval | | | 2/14/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Pre screen accepted by Javier
|
Routing - Addressing | 2/14/2018 | | 2/14/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/14/2018 | | 2/14/2018 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 2/13/2018 | | FAIL |
Javier Guzman
|
|
|
Previous request not addressed. Drawing sheet #6 is required to be stamped and signed by Idaho licensed engineer, please have your Idaho licensed engineer stamp, sign, date the drawing sheet #6 for the detail that shows the awning attached to the existing structure and also please transfer engineer’s marks from his detail to this drawing #6 detail.
|
Intake Approval | | | 1/30/2018 | | FAIL |
Javier Guzman
|
|
|
Per the checklist any structural plans shall be stamped and signed by Idaho licensed engineer, please have your Idaho licensed engineer stamp, sign, date the drawing sheet #6 for the detail that shows the awning attached to the existing structure and also please transfer engineer’s marks to this drawing detail
|
Intake Approval | | | 1/26/2018 | | FAIL |
Javier Guzman
|
|
|
Per the checklist any structural plans shall be stamped and signed by Idaho licensed engineer, please have your Idaho licensed engineer stamp, sign, date the drawing sheet #6 for the detail that shows the awning attached to the existing structure and also please transfer engineer’s marks to this drawing detail
|
Intake Approval | | | 1/17/2018 | | FAIL |
Javier Guzman
|
|
|
Previous request below not uploaded
Please provide the following and upload:
• Please provide a completed 520 PV Checklist found at our website at https://pds.cityofboise.org/media/466093/520-commercial-pv-solar-thermal-systems-submittal-checklist-final_9-25-17.pdf
• Please note the checklist is not complete unless all information is filled out, all appropriate boxes are checked and all plan page numbers are listed, Incomplete submittals will not be accepted.
|
Intake Approval | | | 1/13/2018 | | FAIL |
Javier Guzman
|
|
|
Please provide the following and upload:
• Please provide a completed 520 PV Checklist found at our website at https://pds.cityofboise.org/media/466093/520-commercial-pv-solar-thermal-systems-submittal-checklist-final_9-25-17.pdf
• Please note the checklist is not complete unless all information is filled out, all appropriate boxes are checked and all plan page numbers are listed, Incomplete submittals will not be accepted.
• Any exterior work requires zoning approval please contact Sarah Schaffer with DR at ###-#### and Cody riddle with P&Z at ###-####
|
Application received | | | 1/10/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 10 2018 4:32PM
|