Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD18-00118
StatusFinaled
Name AURIC SOLAR
Site Address 2620 W STATE ST
Project NameSaint Marys School
Customer Number 
ePlanReviewYes
Description
(SAINT MARY’S SCHOOL - AWNING SOLAR PANELS) Permit is to add 12 grid tied solar panels type Silfab 310 each being 39 inches by 65 inches on a listed solar panel Sunshield Sunmodo awning racking system attached to the exiting exterior wall. Approval contingent upon adhering to the approved plans on file, structural engineering, and manufactures installation instructions. Work to include: installation of solar panels and associated electrical work. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 8/17/20188/15/2018 DONE
This permit finaled on the web by Rob Maes
First Notice7/19/20187/19/20188/7/2018 DONE
DetailsDave Hannah
Mailed 8-10-18
BLD-Final7/18/20187/19/20187/19/2018APASS
DetailsDave Hannah
Pls contact Greg (Project Mgr) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes
DOC - Permit Finaled7/19/20187/19/20187/19/2018PPASS
DetailsDave Hannah
BLD-Framing/Rough-in6/1/20186/4/20186/4/2018PNR
DetailsDave Hannah
Pls contact Brad (Foreman) @ ###-#### or Preston (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes
Issue PAID IN FULL permit  3/27/2018 DONE
Inspection Record Card- Bld  3/27/2018 DONE
Plan assigned to (JG)2/14/20182/14/20183/26/2018 PASS
DetailsJavier Guzman
1st rev comp, 3/06 L3 St. Mary's solar panel Building/Electrical ePlan, pend eng
Routing Off Site - STRUCTURAL3/8/2018 3/26/2018 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  3/26/2018 DONE
Permit Ready to Issue  3/26/2018 DONE
Need
GC Form - met
Revised Cert of Value - met
Routing - PLAN CHECK3/8/2018 3/12/2018 PASS
DetailsJavier Guzman
Route to Impact Fee Review2/28/20183/3/20183/1/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  2/28/2018 FAIL
DetailsJavier Guzman
Routing - ELECTRICAL2/14/2018 2/28/2018 PASS
DetailsJavier Guzman
Routing Off Site - STRUCTURAL2/14/2018 2/28/2018 FAIL
DetailsJavier Guzman
Failed in ePlan by Stapley Engineering Jan Welch
Routing - PLAN CHECK2/14/2018 2/28/2018 FAIL
DetailsJavier Guzman
Routing - FIRE2/14/20182/14/20182/23/2018 PASS
DetailsErika Akin
No comments attached
Routing PW Drainage2/14/2018 2/15/2018 PASS
DetailsBrian Murphy
Intake Approval  2/14/2018 PASS
DetailsAdele J Schaffeld-Griffin
Pre screen accepted by Javier
Routing - Addressing2/14/2018 2/14/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS2/14/2018 2/14/2018 PASS
DetailsRachael Beierle
Intake Approval  2/13/2018 FAIL
DetailsJavier Guzman
Previous request not addressed. Drawing sheet #6 is required to be stamped and signed by Idaho licensed engineer, please have your Idaho licensed engineer stamp, sign, date the drawing sheet #6 for the detail that shows the awning attached to the existing structure and also please transfer engineer’s marks from his detail to this drawing #6 detail.
Intake Approval  1/30/2018 FAIL
DetailsJavier Guzman
Per the checklist any structural plans shall be stamped and signed by Idaho licensed engineer, please have your Idaho licensed engineer stamp, sign, date the drawing sheet #6 for the detail that shows the awning attached to the existing structure and also please transfer engineer’s marks to this drawing detail
Intake Approval  1/26/2018 FAIL
DetailsJavier Guzman
Per the checklist any structural plans shall be stamped and signed by Idaho licensed engineer, please have your Idaho licensed engineer stamp, sign, date the drawing sheet #6 for the detail that shows the awning attached to the existing structure and also please transfer engineer’s marks to this drawing detail
Intake Approval  1/17/2018 FAIL
DetailsJavier Guzman
Previous request below not uploaded
Please provide the following and upload:
• Please provide a completed 520 PV Checklist found at our website at https://pds.cityofboise.org/media/466093/520-commercial-pv-solar-thermal-systems-submittal-checklist-final_9-25-17.pdf
• Please note the checklist is not complete unless all information is filled out, all appropriate boxes are checked and all plan page numbers are listed, Incomplete submittals will not be accepted.
Intake Approval  1/13/2018 FAIL
DetailsJavier Guzman
Please provide the following and upload:
• Please provide a completed 520 PV Checklist found at our website at https://pds.cityofboise.org/media/466093/520-commercial-pv-solar-thermal-systems-submittal-checklist-final_9-25-17.pdf
• Please note the checklist is not complete unless all information is filled out, all appropriate boxes are checked and all plan page numbers are listed, Incomplete submittals will not be accepted.
• Any exterior work requires zoning approval please contact Sarah Schaffer with DR at ###-#### and Cody riddle with P&Z at ###-####
Application received  1/10/2018 DONE
Application submitted via PDS Online on Jan 10 2018 4:32PM