BLD-Final | 9/20/2018 | 9/21/2018 | 9/21/2018 | P | PASS |
Tony Young
|
|
|
Kevin ; Phone #: ###-####
|
DOC - Permit Finaled | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Conference | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
Tony Young
|
|
|
Kevin ; Phone #: ###-####,, final
|
BLD-Footing | 6/21/2018 | 6/22/2018 | 6/22/2018 | A | PART |
Tony Young
|
|
|
Kevin Phone #: ###-####,, ok to pour when ready
|
BLD-Footing | 6/20/2018 | 6/21/2018 | 6/21/2018 | P | PART |
Tony Young
|
|
|
Kevin Phone #: ###-####, work in progress
|
PubWorks Subgrade Approval | 6/20/2018 | 6/20/2018 | 6/20/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Routing Walk-In (Zoning) | 3/22/2018 | 3/22/2018 | 3/22/2018 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 3/22/2018 | 3/22/2018 | 3/22/2018 | P | DONE |
Brian McGowan
|
|
|
|
Routing Walk-In (Zoning) | 3/21/2018 | 3/21/2018 | 3/22/2018 | P | DONE |
Brittany Hill
|
|
|
applicant needs to show setback measurements from rear property line. Or decks need to be shown to be 1-foot high or less from finish grade
|
1st review completed | | | 3/22/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 3/22/2018 | | 3/22/2018 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 3/22/2018 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 3/22/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/22/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 3/22/2018 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/22/2018 | | DONE |
Christina Prado
|
|
|
|
Routing Walk-In (Zoning) | 3/21/2018 | 3/21/2018 | 3/21/2018 | P | DONE |
Jason C. Taylor
|
|
|
wanting to do a plan mod to add decks to this permit
|
Routing Walk-In (PW Hillside) | 3/21/2018 | 3/21/2018 | 3/21/2018 | P | PASS |
Jason C. Taylor
|
|
|
***DECK***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
|
BLD-Energy code compliance | 3/13/2018 | 3/13/2018 | 3/13/2018 | P | PASS |
Brandon Shaw
|
|
|
Hamish
|
BLD-Energy code compliance | 3/9/2018 | 3/9/2018 | 3/9/2018 | P | PART |
Tony Young
|
|
|
call before to meet // Hamish Phone #: ###-####,, needs more foam in some areas
|
BLD-Energy code compliance | 3/8/2018 | 3/9/2018 | 3/9/2018 | A | NR |
Tony Young
|
|
|
call before to meet // Hamish Phone #: ###-####
|
BLD-Framing/Rough-in | 3/5/2018 | 3/6/2018 | 3/7/2018 | P | PASS |
Tony Young
|
|
|
call when on way // Hamish Phone #: ###-####,, ok to insulate
|
PubWorks Subgrade Approval | 3/7/2018 | 3/7/2018 | 3/7/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Framing/Rough-in | 2/13/2018 | 2/14/2018 | 2/14/2018 | A | NR |
Tony Young
|
|
|
call when on way // Hamish Phone #: ###-####,, walk through only,, needs trades 1st
|
BLD-Footing | 1/18/2018 | 1/19/2018 | 1/19/2018 | A | PEND |
Tony Young
|
|
|
Jake Phone #: ###-####
|
BLD-Footing | 1/16/2018 | 1/18/2018 | 1/18/2018 | A | PEND |
Tony Young
|
|
|
Jake Phone #: ###-####
|
Case Summary (BLD) | | | 1/18/2018 | | DONE |
|
|
|
|
BLD-Footing | 1/16/2018 | 1/16/2018 | 1/17/2018 | P | PEND |
Tony Young
|
|
|
Jake Phone #: ###-####,, pending soils report,, all footings under existing home
|
Routing Walk-In (BLD) | 1/12/2018 | 1/12/2018 | 1/12/2018 | A | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 1/12/2018 | | DONE |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 1/12/2018 | | 1/12/2018 | | PASS |
Michael Hanson
|
|
|
|
Inspection Record Card- Bld | | | 1/12/2018 | | DONE |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 1/12/2018 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/12/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 1/12/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/12/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/11/2018 | | 1/12/2018 | | PASS |
Michael Hanson
|
|
|
|
Plan assigned to (M_H) | 1/11/2018 | | 1/12/2018 | | DONE |
Michael Hanson
|
|
|
01/25 sfd L2 Remodel
|
Routing Walk-In (BLD) | 1/11/2018 | 1/11/2018 | 1/11/2018 | A | PASS |
Michael Hanson
|
|
|
Intake as a L2. MDH
|
Routing PW Grading-Hillside | 1/11/2018 | | 1/11/2018 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
|
Intake Approval | | | 1/11/2018 | | PASS |
Michael Hanson
|
|
|
|
Application received | | 1/11/2018 | | | |
|
|
|
|