Permit Information
Permit NumberBLD18-00133
StatusIssued
Name WALLACE RENOVATIONS
Site Address 3000 N LAKEHARBOR LN
Project NameTrace Job Skills Training Ctr
Customer Number 
ePlanReviewNo
Description
(TRACE, INC. – JOB SKILLS TRAINING CENTER – 1ST AND 2ND STORIES – TENANT IMPROVEMENT) (12-3-19 PLAN MODIFICATION TO CHANGE THE FORMERLY APPROVED SINGLE-USER MEN’S TOILET ROOM AND THE SINGLE-USER WOMEN’S TOILET ROOM LOCATED ON THE 1ST STORY TO MULTI-USER TOILET ROOMS. THE WOMEN’S TOILET ROOM WILL HAVE TWO TOILETS AND THE MEN’S TOILET ROOM WILL HAVE ONE TOILET AND ONE URINAL. EACH TOILET ROOM AND ONE TOILET STALL IN EACH TOILET ROOM IS REQUIRED TO BE ACCESSIBLE TO THE DISABLED. THE APPROVAL WAS BASED ON THE EXPECTATION THAT A PERSON IN A WHEELCHAIR WILL FIRST INVESTIGATE AND EVALUATE THE BEST WAY TO USE THE TOILET STALL AND WILL EITHER MANEUVER TO BACK INTO THE TOILET STALL FOR A SIDE TRANSFER TO THE TOILET OR WILL MANEUVER TO PULL FORWARD INTO THE TOILET STALL FOR A FRONT TRANSFER. THE ACCESSIBLE MANEUVERING CLEARANCES BASED ON THE APPROACH TO EACH DOOR IS REQUIRED.) This building does not have a fire sprinkler system. To remodel an existing 9,549 square foot two story building (6,219 square feet 1st story and 3,330 square feet 2nd story) for a new office tenant. The 1st story of this building was formerly used as a restaurant. Work is to include a new roof covering, interior nonbearing walls, upgrading two toilet rooms on the 1st story to be accessible to the disabled, a “high” and a “low” drinking fountain on the 1st story, a new interior door with safety glass sidelight, suspended acoustical ceilings, floor coverings, and finishes. A compliant path of egress is required on the East side of this building to provide a compliant means of egress to the public way from the patios and docks located on the South side of the building. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection7/8/20207/8/20207/9/2020 PEND
DetailsTony Young
BLD-Aging Inspection7/7/20207/7/20207/9/2020 PASS
DetailsTony Young
Plan Reviewer's activity  4/13/2020 DONE
Drawings taken to Records
BLD-Final2/24/20202/24/20202/24/2020PPASS
DetailsTony Young
MANNY Phone #: ###-####
FIRE-Final Inspection2/24/20202/24/20202/24/2020APASS
DetailsJim Page
Previously noted items have been corrected, final life fire safety inspection is complete, signature card not available at time of inspection. Kitchen hood is to not be used for any reason, a permit will be required for modifications to the hood fire suppression system to accomidate new appliances, no appliances are under the type 1 hood as of this inspection.
FIRE-Conference2/21/20202/24/20202/24/2020ACANC
DetailsJim Page
Request was for a final inspection, not a conference, this request is cancelled.

Call ahead // Manny Phone #: ###-####
FIRE-Final Inspection1/22/20201/23/20201/23/2020AFAIL
DetailsJim Page
Provided a double-keyed deadbolt for main entry, door currently has thumbturn deadbolt. Provide signage on main entry door that reads "Door to remain unlocked while building is occupied". Provide exit emergency lighting for exit discharge to public way as discussed. Level 1 has a type 1 hood with a suppression system, no appliances are under hood, when appliances are added a seperate permit will be required for suppression system modifications, hood CANNOT be used until permitted, inspected and passed.

call prior - manny Phone #: ###-####
BLD-Conference12/23/201912/24/201912/24/2019APART
DetailsTony Young
Many Phone #: ###-####.. general ?s on the final
BLD-Final12/20/201912/20/201912/20/2019PCANC
DetailsTell Riley
Manny Phone #: ###-####//need fire life safety//will reschedule//
CHANGE STATUS TO (ISS)  12/5/2019 DONE
Permit Ready to Issue  12/4/2019 DONE
DO NOT ISSUE- plan mod approved
Telephone call  12/4/2019 DONE
Called Jeff at Wallace to let him know the plan mod is ready for pickup and what fees are due.
Plan assigned to (CJW)11/25/201911/25/201912/3/2019 PASS
DetailsCarl Westfall
plan mod - Job skills - paper - routed to staff
Plan Reviewer's activity  12/3/2019 PASS
Plan modification approved
Routing PW Sewer Rating11/27/2019 12/2/2019 PASS
DetailsCandy A. Nichols
PLAN MOD URINAL REMOVED AND REFUND IS DUE.
Routing - PLAN CHECK11/25/2019 11/27/2019 PASS
DetailsCarl Westfall
Plan Modification Accepted  11/25/2019 DONE
plan mod- 3 copies of large plans for new ADA first floor bathroom details for both mens and womens
BLD-Aging Inspection11/15/201911/15/201911/20/2019 PEND
DetailsTony Young
BLD-Aging Inspection11/14/201911/14/201911/20/2019 PEND
DetailsTony Young
BLD-Other10/25/201910/25/201910/25/2019PPASS
DetailsTell Riley
Manny- drop celing inspection Phone #: ###-####//1st floor grid ok to cover//
BLD-Conference10/9/201910/9/201910/9/2019PPEND
DetailsTony Young
Manny Phone #: ###-####,, rest room ?s,, need to make per the plan
BLD-Other9/19/20199/19/20199/20/2019PDONE
DetailsTony Young
Many- inspection for T-bar celiing upstairs Phone #: ###-####
BLD-Ceiling Grid Inspection9/19/20199/20/20199/20/2019APASS
DetailsTony Young
Many- inspection for T-bar celiing upstairs Phone #: ###-####
BLD-Energy code compliance7/2/20197/3/20197/3/2019APASS
DetailsTony Young
Manny Phone #: ###-####
BLD-Framing/Rough-in6/14/20196/14/20196/14/2019PPASS
DetailsTony Young
Manny Phone #: ###-####,, ok to insulate
BLD-Conference5/16/20195/16/20195/16/2019PPART
DetailsTony Young
Call ahead // Manny Phone #: ###-####.. insulation ?s,, existing can stay just made it as good as possible
Issue PAID IN FULL permit  2/7/2019 DONE
Plan assigned to (CJW)1/12/20181/12/20189/20/2018 PASS
DetailsCarl Westfall
(1st done) 01/31/18 (L3 - 15 days) (paper - 25 sheets) - Job Skills Training Center
Routing - PLAN CHECK8/27/2018 9/20/2018 PASS
DetailsCarl Westfall
Waiting for letter from the tenant. Received on 9-19-18.
PLANS/APPL TAKEN TO FRONT DESK  9/20/2018 DONE
Permit Ready to Issue  9/20/2018 DONE
Need
Revised Cert of Value

MET
GC FORM
Print Occupancy Form  9/20/2018 DONE
Telephone call  9/20/2018 DONE
called Robin to let know permit is ready and that we need the 302 & 306 forms-left message on her phone
Plan resubmittals received  9/19/2018 DONE
Letter received from tenant
Route to Impact Fee Review8/27/20188/30/20188/27/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan resubmittals requested  8/27/2018 DONE
Plan resubmittals received  8/24/2018 DONE
Two sheet of A2.0 and A2.1 taken to Carl W. Waiting for letter from tenant describing the use of the building, decks, and docks.
Plan resubmittals received  8/15/2018 DONE
received two copies of arch. response, occ load letter, and plan sheets A1.0, A2.0, A2.1, E2.0L, E2.0P, E2.1LMP; taken to Carl Westfall
Routing - FIRE3/10/20183/12/20183/12/2018 PASS
DetailsErika Akin
Attached comments to case and plans
1st review completed  3/12/2018 DONE
Plan resubmittals requested  3/10/2018 DONE
Sent an Email to the Architect with attached plan review report
Routing - PLAN CHECK2/1/2018 3/10/2018 FAIL
DetailsCarl Westfall
Revised drawings required
Routing - MECHANICAL1/12/2018 2/1/2018 PASS
DetailsTroy James
Routing - Erosion and Sediment1/31/2018 1/31/2018 CANC
DetailsAndy J. Long
No ESC permit required. No exterior earth work, existing landscape to remain.
Routing - Design Review1/12/2018 1/30/2018 PASS
DetailsSarah Schafer
Project required Zoning Certificate - has now been submitted and approved.
Routing - Addressing1/12/2018 1/12/2018 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS1/12/2018 1/12/2018 PASS
DetailsMorgan Webb
Pending Assignment by AJS1/11/2018 1/12/2018 DONE
DetailsAdele J Schaffeld-Griffin
Plan Reviewer's activity  1/12/2018 DONE
DetailsAdele J Schaffeld-Griffin
Job skill center (office) is lesser use on ACHD impace fee schedule than existing occupancy of restaurant/lounge/bar.
Plans ACCEPTED BY PLAN TECH  1/11/2018 DONE
Intake Approval  1/11/2018 PASS
Recd Pcfee & Taken To Pln CK  1/11/2018 DONE
Application received 1/11/2018