BLD-Final | 9/6/2018 | 9/6/2018 | 9/6/2018 | A | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 9/6/2018 | 9/6/2018 | 9/6/2018 | | DEFR |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 7/31/2018 | 7/31/2018 | 7/31/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 7/26/2018 | 7/27/2018 | 7/27/2018 | A | NR |
Brandon Shaw
|
|
|
Final OK, need PW approval
|
BLD-Energy code compliance | 5/2/2018 | 5/2/2018 | 5/2/2018 | P | PEND |
Brandon Shaw
|
|
|
Pending shear corrections
OK to cover areas not marked on plans
|
BLD-Other | 4/25/2018 | 4/25/2018 | 4/25/2018 | P | PASS |
Brandon Shaw
|
|
|
Rollo-soffit Phone #: ###-####
|
BLD-Energy code compliance | 4/24/2018 | 4/25/2018 | 4/25/2018 | A | FAIL |
Brandon Shaw
|
|
|
insulation- OK Framing corrections need to be completed- Straps and hold downs to be installed as per plans
|
BLD-Framing/Rough-in | 4/23/2018 | 4/23/2018 | 4/23/2018 | P | PART |
Jim Sly
|
|
|
Rolo Phone #: ###-#### Complete Corrections that are marked......OK to insulate.
|
BLD-Framing/Rough-in | 4/19/2018 | 4/20/2018 | 4/20/2018 | A | FAIL |
Jim Storey
|
|
|
Rollo Phone #: ###-####c/n posted
|
BLD-Wall Bracing | 3/28/2018 | 3/29/2018 | 3/29/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Brad McJunkin
|
BLD-Foundation | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
BLD-Foundation | 2/28/2018 | 2/28/2018 | 2/28/2018 | A | CANC |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Inspection cancelled via mobile web on Wednesday, February 28, 2018.
|
BLD-Footing | 2/20/2018 | 2/20/2018 | 2/20/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
BLD-Conference | 2/20/2018 | 2/20/2018 | 2/20/2018 | A | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 2/8/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/8/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 1/23/2018 | | |
|
|
|
|
Plan assigned to (M_H) | 1/17/2018 | | 1/23/2018 | | DONE |
Michael Hanson
|
|
|
02/05 sfd L2 ePlan - 1st review completed. RTA - structural deficiencies. MDH
|
Routing - PLAN CHECK | 1/23/2018 | | 1/23/2018 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/23/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 1/23/2018 | | DONE |
|
|
|
Met
|
Routing PW Grading-Hillside | 1/17/2018 | | 1/22/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
1st review completed | | | 1/19/2018 | | FAIL |
Michael Hanson
|
|
|
RTA - upper floor framing for game room and second story patio missing. MDH
|
Routing - PLAN CHECK | 1/17/2018 | | 1/19/2018 | | FAIL |
Michael Hanson
|
|
|
RTA - upper floor framing for game room and second story patio missing. MDH
|
Routing - MECHANICAL | 1/17/2018 | | 1/19/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 1/17/2018 | 1/20/2018 | 1/18/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 1/17/2018 | 1/17/2018 | 1/17/2018 | | PASS |
Scott Arellano
|
|
|
No comments attached. Plans approved as shown.
|
Routing - Erosion and Sediment | 1/17/2018 | | 1/17/2018 | | PASS |
Michael Zawacki
|
|
|
Harris Ranch North. Site inspection required before start of construction.
|
Routing - PLANNING | 1/17/2018 | | 1/17/2018 | | PASS |
Jeff Lowe
|
|
|
|
Routing - Addressing | 1/17/2018 | | 1/17/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/17/2018 | | 1/17/2018 | | PASS |
Morgan Webb
|
|
|
|
Telephone call | | | 1/17/2018 | | |
|
|
|
emailed Chelsea that we still need the letter to review under 2012 IRC
|
Plans ACCEPTED BY PLAN TECH | | | 1/17/2018 | | DONE |
|
|
|
|
Intake Approval | | | 1/17/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/17/2018 | | DONE |
|
|
|
|
Intake Approval | | | 1/12/2018 | | FAIL |
|
|
|
Need a email a letter to Carl M for 2012 IRC and upload a copy or change the IRC on plans to 2015 IRC
Permit for the construction of a new 3,355 sq. ft., two story (first story 1,721 sq. ft., second story 1,634 sq. ft.) single family dwelling with 4 bedrooms, 2 and a half bathrooms, approximately 346 sq. ft. of covered patio/porch and an 817-sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning.
|
Application received | | | 1/11/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 11 2018 3:51PM
|