BLD-Final | 6/13/2018 | 6/13/2018 | 6/13/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 6/13/2018 | 6/13/2018 | 6/13/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 6/12/2018 | 6/12/2018 | 6/12/2018 | P | NR |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Final | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled from web by: Kyle Seick
|
BLD-Final | 5/17/2018 | 5/18/2018 | 5/18/2018 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner
|
BLD-Energy code compliance | 4/18/2018 | 4/18/2018 | 4/18/2018 | A | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 4/16/2018 | 4/16/2018 | 4/16/2018 | P | FAIL |
Brandon Shaw
|
|
|
1) Studs needed to bear point load at garage 2) Shear panel edges to be blocked, as per plans 3)Provide Engineering approval for cut truss 4) Provide a copy of truss engineering
OK to insulate
|
BLD-Wall Bracing | 3/28/2018 | 3/29/2018 | 3/29/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Footing | 2/14/2018 | 2/14/2018 | 2/14/2018 | P | PASS |
Dave Hannah
|
|
|
Dion-please do as late as possible Phone #: ###-####
|
BLD-Footing | 2/14/2018 | 2/14/2018 | 2/14/2018 | A | CANC |
Dave Hannah
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion-
|
Issue PAID IN FULL permit | | | 1/30/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/30/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 1/22/2018 | | |
|
|
|
|
1st review completed | | | 1/22/2018 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/22/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 1/22/2018 | | DONE |
|
|
|
Met
|
Plan assigned to (M_H) | 1/17/2018 | | 1/22/2018 | | DONE |
Michael Hanson
|
|
|
01/30 sfd L1 - PC completed. Mech=open 1/18 MDH
|
Routing - PLAN CHECK | 1/17/2018 | | 1/22/2018 | | PASS |
Michael Hanson
|
|
|
|
Routing - MECHANICAL | 1/17/2018 | | 1/19/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 1/17/2018 | 1/20/2018 | 1/18/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plan Reviewer's activity | | | 1/18/2018 | | DONE |
Michael Hanson
|
|
|
|
Routing - PLANNING | 1/17/2018 | | 1/17/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 1/17/2018 | | 1/17/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/17/2018 | | 1/17/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/17/2018 | | DONE |
|
|
|
|
Intake Approval | | | 1/17/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/17/2018 | | DONE |
|
|
|
|
Intake Approval | | | 1/16/2018 | | FAIL |
|
|
|
wrong model floor plan was uploaded with updated code year. Sent separate email through eplan, still need 2012 review request letter for engineering calcs.
|
Application received | | | 1/12/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 12 2018 8:06AM
|
Intake Approval | | | 1/12/2018 | | FAIL |
|
|
|
Need a letter to Carl M to request 2012 IRC and upload a copy or change plans to 2015 IRC
Permit for the construction of a new 2,387 sq. ft., two story (first story 1,355 sq. ft., second story 482 sq. ft.) single family dwelling with 4 bedrooms, 2 and a half bathrooms, approximately 9 sq. ft. of covered patio/porch and a 482 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning.
|