BLD-Final | 6/13/2018 | 6/13/2018 | 6/13/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 6/13/2018 | 6/13/2018 | 6/13/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 6/12/2018 | 6/12/2018 | 6/12/2018 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Final | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled from web by: Kyle Seick
|
BLD-Energy code compliance | 4/17/2018 | 4/18/2018 | 4/18/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Energy code compliance | 4/17/2018 | 4/19/2018 | 4/18/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Wall Bracing | 4/17/2018 | 4/18/2018 | 4/17/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled from web by: Kyle Seick
|
BLD-Framing/Rough-in | 4/16/2018 | 4/16/2018 | 4/16/2018 | P | PEND |
Brandon Shaw
|
|
|
Need to install floor to floor straps as per plans/engineering details, or Engineering approval for as built
OK to insulate
|
BLD-Wall Bracing | 3/28/2018 | 3/29/2018 | 3/29/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Foundation | 2/16/2018 | 2/16/2018 | 2/16/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
BLD-Foundation | 2/15/2018 | 2/15/2018 | 2/15/2018 | P | CANC |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Inspection cancelled via mobile web on Thursday, February 15, 2018.
|
BLD-Footing | 2/14/2018 | 2/14/2018 | 2/14/2018 | P | PASS |
Dave Hannah
|
|
|
Dion-please do as late as possible Phone #: ###-####
|
BLD-Footing | 2/14/2018 | 2/14/2018 | 2/14/2018 | A | CANC |
Dave Hannah
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
|
Issue PAID IN FULL permit | | | 1/30/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/30/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 1/29/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 1/18/2018 | 1/18/2018 | 1/29/2018 | | DONE |
Rob Patrick
|
|
|
1/31 sfd L1 ePlan
|
Routing - PLAN CHECK | 1/18/2018 | | 1/29/2018 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 1/29/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 1/29/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/18/2018 | 1/21/2018 | 1/19/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 1/18/2018 | | 1/19/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 1/18/2018 | | 1/19/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 1/18/2018 | | 1/19/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/18/2018 | | 1/19/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/18/2018 | | DONE |
|
|
|
|
Intake Approval | | | 1/18/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/18/2018 | | DONE |
|
|
|
|
Intake Approval | | | 1/16/2018 | | FAIL |
|
|
|
Wrong model floor plan was uploaded when updated code year. Need 2012 IBC review request letter for engineering.
|
Application received | | | 1/12/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 12 2018 8:11AM
|
Intake Approval | | | 1/12/2018 | | FAIL |
|
|
|
need letter for using the 2012 IRC-description:
Permit for the construction of a new 1927 sq. ft., two story (first story 695 sq. ft., second story 1225 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 7 sq. ft. of covered patio/porch and a 510 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning.
|