Permit NumberBLD18-00157
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameC30616 B37 Office Building
Customer Number 
ePlanReviewYes
Description
(MICRON B37 OFFICE BUILDING) ""PLAN MODIFICATION FOR UNDERGOUND PLUNBING AND STRUCTURAL MODIFICATIONS"" SCOPE:UNDERGROUND POWER SERVICE, UNDERSLAB PLUMBING, FOOTINGS, FOUNDATIONS, STEEL SUPERSTRUCTURE AND ELEVATED SLABS FOR B37 OFFICE BUILDING. Special inspections are required per the attached form 310. Grading under GRD17-00087. New Administrative Office Building, 3 - story's of approximately 53,500sf. each, this permit is to include the following. No occupancy under this permit.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled1/9/20191/9/20191/9/2019APASS
DetailsJim Storey
BLD-Ceiling Grid Inspection12/21/201812/21/201812/21/2018PCANC
DetailsJim Storey
1st floor Area A Phone #: ###-#### Inspection requested via web by Robert Snow
BLD-Final12/10/201812/14/201812/14/2018ACANC
DetailsMike Jordan
Dave Phone #: ###-####. Moved to pm.
BLD-Final12/12/201812/13/201812/13/2018ANR
DetailsMike Jordan
Dave Phone #: ###-####. Needs fire/life/safety TCO first. Needs exiting completed.
BLD-Framing/Rough-in8/17/20188/17/20188/17/2018PPASS
DetailsJim Storey
c/n 6/22 all idems made ok
BLD-Framing/Rough-in7/25/20187/26/20187/26/2018ANR
DetailsJim Storey
exterior walls and interrior // Dave Phone #: ###-####
Fees Due Hold6/8/2018 6/18/2018 DONE
DetailsChristina Prado
BLD-Other6/6/20186/7/20186/7/2018PPASS
DetailsJim Storey
slab on grad // dave Phone #: ###-#### barrior in place rebar ok//
Fees Due Hold6/7/2018 6/7/2018 DONE
DetailsRita DeYoung
Fees Due Hold5/30/2018 6/6/2018 DONE
DetailsBrittany Hill
BLD-Framing/Rough-in5/31/20186/1/20186/1/2018APART
DetailsJim Storey
Dave Phone #: ###-#### work in progress/ need iecc at foundation r 10 and exterior insulation was propose due to lack of submitals on permit set.
CHANGE STATUS TO (ISS)  5/29/2018  
DetailsChristina Prado
Plan Mod 2 approved, fees to be paid by Micron
BLD-Footing5/22/20185/24/20185/24/2018PPASS
DetailsJim Storey
Rebar/slab - Dave Phone #: ###-#### placed with si
Plan assigned to (CDM)5/7/20185/7/20185/24/2018 PASS
DetailsCarl D Madsen
Plan Mod #2 -
CCD002
Revisions to structure to accommodate additional 3rd floor training
CCD005
Revisions to Bid Package 01 documents associated with the response to RFI 0018, changing the BOD elevators from two Schindler Elevator 5500 MRL to two Thyssenkrupp Elevator Endura 35 A machine-room-less hydraulic elevators and revisions associated with adding the covered bike storage area to the building
CCD006
Civil electrical and duct bank, Revisions to Bid Package 01 documents for Civil Electrical modifications, including those required for responses to RFI 0016, RFI 0024, and RFI 0028, and other electrical duct bank routing and generator pad information, Bid Package 02 document "For Reference" in providing additional required information.
PLANS/APPL TAKEN TO FRONT DESK  5/24/2018 DONE
Permit Ready to Issue  5/24/2018 DONE
Plan Mod Approved
DO NOT REISSUE
Need Cert of value for plan mod
Routing - PLAN CHECK5/9/2018 5/24/2018 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL5/9/2018 5/24/2018 PASS
DetailsCarl D Madsen
Fees Due Hold5/3/2018 5/15/2018 DONE
DetailsTisha Gallop
BLD-Foundation5/9/20185/10/20185/10/2018PPASS
DetailsJim Storey
Kevin Phone #: ###-####sog ok
Routing - Design Review5/9/2018 5/10/2018 PASS
DetailsSarah Schafer
Approved per the DRH.
BLD-Concrete5/7/20185/8/20185/8/2018PFAIL
DetailsJim Storey
Dave Phone #: ###-#### k bracing lower bolt/nut needs tourqe test before concrete placment 4 locations// doug fir backing must be fire treated for this type of const.
BLD-Foundation5/7/20185/7/20185/7/2018PPASS
DetailsJim Storey
Dave-concrete reinforcement 2nd floor area C Phone #: ###-#### level 3 pass
Plan Modification Accepted  5/7/2018 DONE
DetailsChristina Prado
plan mod - CCD002
Revisions to structure to accommodate additional 3rd floor training
CCD005
Revisions to Bid Package 01 documents associated with the response to RFI 0018, changing the BOD elevators from two Schindler Elevator 5500 MRL to two Thyssenkrupp Elevator Endura 35 A machine-room-less hydraulic elevators and revisions associated with adding the covered bike storage area to the building
CCD006
Civil electrical and duct bank, Revisions to Bid Package 01 documents for Civil Electrical modifications, including those required for responses to RFI 0016, RFI 0024, and RFI 0028, and other electrical duct bank routing and generator pad information, Bid Package 02 document "For Reference" in providing additional required information.
BLD-Concrete5/2/20185/3/20185/3/2018PPASS
DetailsJim Storey
Dave Phone #: ###-####sog vappor barrior ok
BLD-Concrete5/2/20185/2/20185/2/2018PPASS
DetailsJim Storey
Dave Phone #: ###-#### slab on grade area 1 vappor barrior in place rebar spacing ok
CHANGE STATUS TO (ISS)  5/2/2018 DONE
DetailsChristina Prado
Plan Mod approved, Micron to pay fees
Plan assigned to (CDM)4/18/20184/18/20185/1/2018 PASS
DetailsCarl D Madsen
ePlanReview Plan Mod - underslab revisions CCD001, CCD003 & CCD004
Routing - PLAN CHECK5/1/2018 5/1/2018 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL5/1/2018 5/1/2018 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  5/1/2018 DONE
Permit Ready to Issue  5/1/2018 DONE
PLAN MOD
Telephone call  5/1/2018 DONE
Dave with ESI called to schedule an inspection but the inspection was for the plan mod tht was turned in. Since ESI was on the permit instead of Micron i let him know that he needs to pay for the plan mod so we can change status to ISS and then we can approve stamped drawings-spoke to Rita about it
Routing - PLUMBING4/25/2018 4/25/2018 PASS
DetailsBill VanDegrift
Per plans and ISPC
BLD-Other4/18/20184/19/20184/19/2018PPASS
DetailsJim Storey
Area B level 2 slab on deck reinforcement // Kevin Honeycutt Phone #: ###-#### si to pick up missing deck welds se opening/east side.
BLD-Foundation4/17/20184/18/20184/18/2018PPASS
DetailsJim Storey
rebar for 3rd floor // Dave Phone #: ###-####
Plan Modification Accepted  4/18/2018 DONE
DetailsChristina Prado
Plan Mod - underslab revisions CCD001, CCD003 & CCD004
BLD-Concrete4/11/20184/11/20184/11/2018PPART
DetailsJim Storey
Area A level 2 SOMD reinforcing. Special inspector onsite. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt si pick up west stair weld stuns missing/ clean up deck.
BLD-Concrete4/9/20184/10/20184/10/2018APASS
DetailsJim Storey
Level 3 SOMD reinforcement. Special Inspector to be onsite. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt west end
BLD-Footing3/21/20183/22/20183/22/2018APASS
DetailsJim Storey
Elevator pits footings. Concrete at 10AM Geotek onsite Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
Fees Due Hold3/8/2018 3/8/2018 DONE
DetailsBrittany Hill
Fees Due Hold3/7/2018 3/7/2018 DONE
DetailsBrittany Hill
Fees Due Hold3/6/2018 3/6/2018 DONE
DetailsBrittany Hill
Fees Due Hold3/1/2018 3/5/2018 DONE
DetailsBrittany Hill
BLD-Foundation2/28/20183/1/20183/1/2018APASS
DetailsJim Storey
GL-A,5 stem walls. GL-2 continuous footings. Concrete at 1PM, special inspector onsite. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
BLD-Footing2/27/20182/28/20182/28/2018PCANC
DetailsJim Storey
Continuous footing GL-2. Stem walls GL-A,5. Concrete at 2PM special inspector onsite Phone #: ###-#### >> Inspection requested via web by Kevin Honeycutt
Fees Due Hold2/28/2018 2/28/2018 DONE
DetailsBrittany Hill
BLD-Footing2/26/20182/27/20182/27/2018APASS
DetailsJim Storey
Continuous footing GL-5,A,2. Special inspector onsite, Concrete is at 2PM ready for City inspection at 1PM. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
Fees Due Hold2/27/2018 2/27/2018 DONE
DetailsBrittany Hill
BLD-Footing2/26/20182/27/20182/26/2018PCANC
DetailsJim Storey
Continuous footing GL - A,5,2 Phone #: ###-#### >> Inspection requested via web by Kevin Honeycutt Inspection cancelled from web by: Kevin Honeycutt
Fees Due Hold2/24/2018 2/26/2018 DONE
DetailsBrittany Hill
Fees Due Hold2/23/2018 2/23/2018 DONE
DetailsBrittany Hill
BLD-Footing2/21/20182/21/20182/22/2018PPEND
DetailsDave Hannah
Spread footings GL- B;C/ GL-3;4. Special Inspector onsite Phone #: ###-#### Inspection requested via web by Kevin Honeycutt ok after spec sign offs
Fees Due Hold2/22/2018 2/22/2018 DONE
DetailsBrittany Hill
Fees Due Hold2/21/2018 2/21/2018 DONE
DetailsBrittany Hill
BLD-Footing2/20/20182/20/20182/20/2018PPART
DetailsJim Sly
Ready at 3:30 PM. Concrete tomorrow at 4:30 AM. Special inspector will be onsite. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
Matt footings and piers at Gridline A, 5 and 2. OK pending Geotek special inspection, tests and approvals.
Fees Due Hold2/16/2018 2/20/2018 DONE
DetailsBrittany Hill
BLD-Foundation2/14/20182/15/20182/15/2018PPASS
DetailsJim Storey
Mat footing on GL-2 between J;K. Stem walls on GL-2 between D;H. Stem walls on GL-5 between F;L. Stem walls on GL-4 between L;N. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
Fees Due Hold2/15/2018 2/15/2018 DONE
DetailsChristina Prado
Fees Due Hold2/13/2018 2/14/2018 DONE
DetailsChristina Prado
BLD-Footing2/12/20182/13/20182/13/2018APASS
DetailsJim Storey
Continuous footing on GL-2 ; 5. Concrete is at 12PM, special inspector will be onsite. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
Fees Due Hold2/8/2018 2/12/2018 DONE
DetailsTiffany Carson-Herker
BLD-Footing2/6/20182/7/20182/7/2018APART
DetailsJim Storey
Call if you have trouble finding us. Concrete is scheduled for 12PM, Special inspection is complete. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt no aproved plan on site si on site/ genral confomance ok / engineers aproval on site review ok to place concrete
Route to Impact Fee Review2/6/20182/9/20182/7/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Fees Due Hold2/7/2018 2/7/2018 DONE
DetailsChristina Prado
Permit Ready to Issue  2/7/2018 DONE
DetailsChristina Prado
CHANGE STATUS TO (ISS)  2/7/2018 DONE
DetailsChristina Prado
needed to add ready to issue to correct reports
Plan assigned to (CDM)1/20/20181/20/20182/6/2018 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK1/20/2018 2/6/2018 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL1/20/2018 2/6/2018 PASS
DetailsCarl D Madsen
Routing - Design Review2/6/2018 2/6/2018 PASS
DetailsKatelyn Menuge
Per Sarah, okay to pass prior to DR mod approval.
1st review completed  2/6/2018 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/6/2018 DONE
Issue & PRINT to be Invoiced  2/6/2018 DONE
DetailsChristina Prado
Inspection Record Card- Bld  2/6/2018 DONE
Routing - FIRE2/1/20182/1/20182/2/2018 PASS
DetailsScott Arellano
Attached comments to case
Plan resubmittals received  2/1/2018 DONE
Paul Marcolina delivered Aerial Apparatus access site plan for south side of Building 37.
Routing - FIRE1/20/20181/20/20181/29/2018 FAIL
DetailsScott Arellano
Attached comments to case and emailed architect
Routing - Erosion and Sediment1/20/2018 1/29/2018 CANC
DetailsAndy J. Long
No ESC review required. ESC permit already issued for B37, see ESC18-00006
Routing PW Solid Waste1/22/2018 1/25/2018 PASS
DetailsEvan Carpenter
Routing - Design Review1/20/2018 1/25/2018 FAIL
DetailsSarah Schafer
DR Mod required.
Routing - PLANNING1/20/2018 1/23/2018 PASS
DetailsDavid Moser
No review required, see Design Review approval
Routing PW Sewer Design1/22/2018 1/23/2018 PASS
DetailsMike Sheppard
Routing PW Street Lights1/22/2018 1/22/2018 PASS
DetailsTom Marshall
Routing PW Drainage1/22/2018 1/22/2018 PASS
DetailsBrian Murphy
Routing - Addressing1/20/2018 1/22/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/20/2018 1/22/2018 PASS
DetailsRachael Beierle
Routing - PLUMBING1/20/2018 1/22/2018 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Intake Approval  1/20/2018 PASS
Application received  1/12/2018 DONE
Application submitted via PDS Online on Jan 12 2018 4:12PM