DOC - Permit Finaled | 1/9/2019 | 1/9/2019 | 1/9/2019 | A | PASS |
Jim Storey
|
|
|
|
BLD-Ceiling Grid Inspection | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | CANC |
Jim Storey
|
|
|
1st floor Area A Phone #: ###-#### Inspection requested via web by Robert Snow
|
BLD-Final | 12/10/2018 | 12/14/2018 | 12/14/2018 | A | CANC |
Mike Jordan
|
|
|
Dave Phone #: ###-####. Moved to pm.
|
BLD-Final | 12/12/2018 | 12/13/2018 | 12/13/2018 | A | NR |
Mike Jordan
|
|
|
Dave Phone #: ###-####. Needs fire/life/safety TCO first. Needs exiting completed.
|
BLD-Framing/Rough-in | 8/17/2018 | 8/17/2018 | 8/17/2018 | P | PASS |
Jim Storey
|
|
|
c/n 6/22 all idems made ok
|
BLD-Framing/Rough-in | 7/25/2018 | 7/26/2018 | 7/26/2018 | A | NR |
Jim Storey
|
|
|
exterior walls and interrior // Dave Phone #: ###-####
|
Fees Due Hold | 6/8/2018 | | 6/18/2018 | | DONE |
Christina Prado
|
|
|
|
BLD-Other | 6/6/2018 | 6/7/2018 | 6/7/2018 | P | PASS |
Jim Storey
|
|
|
slab on grad // dave Phone #: ###-#### barrior in place rebar ok//
|
Fees Due Hold | 6/7/2018 | | 6/7/2018 | | DONE |
Rita DeYoung
|
|
|
|
Fees Due Hold | 5/30/2018 | | 6/6/2018 | | DONE |
Brittany Hill
|
|
|
|
BLD-Framing/Rough-in | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | PART |
Jim Storey
|
|
|
Dave Phone #: ###-#### work in progress/ need iecc at foundation r 10 and exterior insulation was propose due to lack of submitals on permit set.
|
CHANGE STATUS TO (ISS) | | | 5/29/2018 | | |
Christina Prado
|
|
|
Plan Mod 2 approved, fees to be paid by Micron
|
BLD-Footing | 5/22/2018 | 5/24/2018 | 5/24/2018 | P | PASS |
Jim Storey
|
|
|
Rebar/slab - Dave Phone #: ###-#### placed with si
|
Plan assigned to (CDM) | 5/7/2018 | 5/7/2018 | 5/24/2018 | | PASS |
Carl D Madsen
|
|
|
Plan Mod #2 -
CCD002
Revisions to structure to accommodate additional 3rd floor training
CCD005
Revisions to Bid Package 01 documents associated with the response to RFI 0018, changing the BOD elevators from two Schindler Elevator 5500 MRL to two Thyssenkrupp Elevator Endura 35 A machine-room-less hydraulic elevators and revisions associated with adding the covered bike storage area to the building
CCD006
Civil electrical and duct bank, Revisions to Bid Package 01 documents for Civil Electrical modifications, including those required for responses to RFI 0016, RFI 0024, and RFI 0028, and other electrical duct bank routing and generator pad information, Bid Package 02 document "For Reference" in providing additional required information.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/24/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/24/2018 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE
Need Cert of value for plan mod
|
Routing - PLAN CHECK | 5/9/2018 | | 5/24/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 5/9/2018 | | 5/24/2018 | | PASS |
Carl D Madsen
|
|
|
|
Fees Due Hold | 5/3/2018 | | 5/15/2018 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Foundation | 5/9/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Jim Storey
|
|
|
Kevin Phone #: ###-####sog ok
|
Routing - Design Review | 5/9/2018 | | 5/10/2018 | | PASS |
Sarah Schafer
|
|
|
Approved per the DRH.
|
BLD-Concrete | 5/7/2018 | 5/8/2018 | 5/8/2018 | P | FAIL |
Jim Storey
|
|
|
Dave Phone #: ###-#### k bracing lower bolt/nut needs tourqe test before concrete placment 4 locations// doug fir backing must be fire treated for this type of const.
|
BLD-Foundation | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | PASS |
Jim Storey
|
|
|
Dave-concrete reinforcement 2nd floor area C Phone #: ###-#### level 3 pass
|
Plan Modification Accepted | | | 5/7/2018 | | DONE |
Christina Prado
|
|
|
plan mod - CCD002
Revisions to structure to accommodate additional 3rd floor training
CCD005
Revisions to Bid Package 01 documents associated with the response to RFI 0018, changing the BOD elevators from two Schindler Elevator 5500 MRL to two Thyssenkrupp Elevator Endura 35 A machine-room-less hydraulic elevators and revisions associated with adding the covered bike storage area to the building
CCD006
Civil electrical and duct bank, Revisions to Bid Package 01 documents for Civil Electrical modifications, including those required for responses to RFI 0016, RFI 0024, and RFI 0028, and other electrical duct bank routing and generator pad information, Bid Package 02 document "For Reference" in providing additional required information.
|
BLD-Concrete | 5/2/2018 | 5/3/2018 | 5/3/2018 | P | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-####sog vappor barrior ok
|
BLD-Concrete | 5/2/2018 | 5/2/2018 | 5/2/2018 | P | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-#### slab on grade area 1 vappor barrior in place rebar spacing ok
|
CHANGE STATUS TO (ISS) | | | 5/2/2018 | | DONE |
Christina Prado
|
|
|
Plan Mod approved, Micron to pay fees
|
Plan assigned to (CDM) | 4/18/2018 | 4/18/2018 | 5/1/2018 | | PASS |
Carl D Madsen
|
|
|
ePlanReview Plan Mod - underslab revisions CCD001, CCD003 & CCD004
|
Routing - PLAN CHECK | 5/1/2018 | | 5/1/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 5/1/2018 | | 5/1/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/1/2018 | | DONE |
|
|
|
PLAN MOD
|
Telephone call | | | 5/1/2018 | | DONE |
|
|
|
Dave with ESI called to schedule an inspection but the inspection was for the plan mod tht was turned in. Since ESI was on the permit instead of Micron i let him know that he needs to pay for the plan mod so we can change status to ISS and then we can approve stamped drawings-spoke to Rita about it
|
Routing - PLUMBING | 4/25/2018 | | 4/25/2018 | | PASS |
Bill VanDegrift
|
|
|
Per plans and ISPC
|
BLD-Other | 4/18/2018 | 4/19/2018 | 4/19/2018 | P | PASS |
Jim Storey
|
|
|
Area B level 2 slab on deck reinforcement // Kevin Honeycutt Phone #: ###-#### si to pick up missing deck welds se opening/east side.
|
BLD-Foundation | 4/17/2018 | 4/18/2018 | 4/18/2018 | P | PASS |
Jim Storey
|
|
|
rebar for 3rd floor // Dave Phone #: ###-####
|
Plan Modification Accepted | | | 4/18/2018 | | DONE |
Christina Prado
|
|
|
Plan Mod - underslab revisions CCD001, CCD003 & CCD004
|
BLD-Concrete | 4/11/2018 | 4/11/2018 | 4/11/2018 | P | PART |
Jim Storey
|
|
|
Area A level 2 SOMD reinforcing. Special inspector onsite. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt si pick up west stair weld stuns missing/ clean up deck.
|
BLD-Concrete | 4/9/2018 | 4/10/2018 | 4/10/2018 | A | PASS |
Jim Storey
|
|
|
Level 3 SOMD reinforcement. Special Inspector to be onsite. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt west end
|
BLD-Footing | 3/21/2018 | 3/22/2018 | 3/22/2018 | A | PASS |
Jim Storey
|
|
|
Elevator pits footings. Concrete at 10AM Geotek onsite Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
|
Fees Due Hold | 3/8/2018 | | 3/8/2018 | | DONE |
Brittany Hill
|
|
|
|
Fees Due Hold | 3/7/2018 | | 3/7/2018 | | DONE |
Brittany Hill
|
|
|
|
Fees Due Hold | 3/6/2018 | | 3/6/2018 | | DONE |
Brittany Hill
|
|
|
|
Fees Due Hold | 3/1/2018 | | 3/5/2018 | | DONE |
Brittany Hill
|
|
|
|
BLD-Foundation | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | PASS |
Jim Storey
|
|
|
GL-A,5 stem walls. GL-2 continuous footings. Concrete at 1PM, special inspector onsite. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
|
BLD-Footing | 2/27/2018 | 2/28/2018 | 2/28/2018 | P | CANC |
Jim Storey
|
|
|
Continuous footing GL-2. Stem walls GL-A,5. Concrete at 2PM special inspector onsite Phone #: ###-#### >> Inspection requested via web by Kevin Honeycutt
|
Fees Due Hold | 2/28/2018 | | 2/28/2018 | | DONE |
Brittany Hill
|
|
|
|
BLD-Footing | 2/26/2018 | 2/27/2018 | 2/27/2018 | A | PASS |
Jim Storey
|
|
|
Continuous footing GL-5,A,2. Special inspector onsite, Concrete is at 2PM ready for City inspection at 1PM. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
|
Fees Due Hold | 2/27/2018 | | 2/27/2018 | | DONE |
Brittany Hill
|
|
|
|
BLD-Footing | 2/26/2018 | 2/27/2018 | 2/26/2018 | P | CANC |
Jim Storey
|
|
|
Continuous footing GL - A,5,2 Phone #: ###-#### >> Inspection requested via web by Kevin Honeycutt Inspection cancelled from web by: Kevin Honeycutt
|
Fees Due Hold | 2/24/2018 | | 2/26/2018 | | DONE |
Brittany Hill
|
|
|
|
Fees Due Hold | 2/23/2018 | | 2/23/2018 | | DONE |
Brittany Hill
|
|
|
|
BLD-Footing | 2/21/2018 | 2/21/2018 | 2/22/2018 | P | PEND |
Dave Hannah
|
|
|
Spread footings GL- B;C/ GL-3;4. Special Inspector onsite Phone #: ###-#### Inspection requested via web by Kevin Honeycutt ok after spec sign offs
|
Fees Due Hold | 2/22/2018 | | 2/22/2018 | | DONE |
Brittany Hill
|
|
|
|
Fees Due Hold | 2/21/2018 | | 2/21/2018 | | DONE |
Brittany Hill
|
|
|
|
BLD-Footing | 2/20/2018 | 2/20/2018 | 2/20/2018 | P | PART |
Jim Sly
|
|
|
Ready at 3:30 PM. Concrete tomorrow at 4:30 AM. Special inspector will be onsite. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt Matt footings and piers at Gridline A, 5 and 2. OK pending Geotek special inspection, tests and approvals.
|
Fees Due Hold | 2/16/2018 | | 2/20/2018 | | DONE |
Brittany Hill
|
|
|
|
BLD-Foundation | 2/14/2018 | 2/15/2018 | 2/15/2018 | P | PASS |
Jim Storey
|
|
|
Mat footing on GL-2 between J;K. Stem walls on GL-2 between D;H. Stem walls on GL-5 between F;L. Stem walls on GL-4 between L;N. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
|
Fees Due Hold | 2/15/2018 | | 2/15/2018 | | DONE |
Christina Prado
|
|
|
|
Fees Due Hold | 2/13/2018 | | 2/14/2018 | | DONE |
Christina Prado
|
|
|
|
BLD-Footing | 2/12/2018 | 2/13/2018 | 2/13/2018 | A | PASS |
Jim Storey
|
|
|
Continuous footing on GL-2 ; 5. Concrete is at 12PM, special inspector will be onsite. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt
|
Fees Due Hold | 2/8/2018 | | 2/12/2018 | | DONE |
Tiffany Carson-Herker
|
|
|
|
BLD-Footing | 2/6/2018 | 2/7/2018 | 2/7/2018 | A | PART |
Jim Storey
|
|
|
Call if you have trouble finding us. Concrete is scheduled for 12PM, Special inspection is complete. Phone #: ###-#### Inspection requested via web by Kevin Honeycutt no aproved plan on site si on site/ genral confomance ok / engineers aproval on site review ok to place concrete
|
Route to Impact Fee Review | 2/6/2018 | 2/9/2018 | 2/7/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Fees Due Hold | 2/7/2018 | | 2/7/2018 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 2/7/2018 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/7/2018 | | DONE |
Christina Prado
|
|
|
needed to add ready to issue to correct reports
|
Plan assigned to (CDM) | 1/20/2018 | 1/20/2018 | 2/6/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 1/20/2018 | | 2/6/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 1/20/2018 | | 2/6/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing - Design Review | 2/6/2018 | | 2/6/2018 | | PASS |
Katelyn Menuge
|
|
|
Per Sarah, okay to pass prior to DR mod approval.
|
1st review completed | | | 2/6/2018 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2018 | | DONE |
|
|
|
|
Issue & PRINT to be Invoiced | | | 2/6/2018 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 2/6/2018 | | DONE |
|
|
|
|
Routing - FIRE | 2/1/2018 | 2/1/2018 | 2/2/2018 | | PASS |
Scott Arellano
|
|
|
Attached comments to case
|
Plan resubmittals received | | | 2/1/2018 | | DONE |
|
|
|
Paul Marcolina delivered Aerial Apparatus access site plan for south side of Building 37.
|
Routing - FIRE | 1/20/2018 | 1/20/2018 | 1/29/2018 | | FAIL |
Scott Arellano
|
|
|
Attached comments to case and emailed architect
|
Routing - Erosion and Sediment | 1/20/2018 | | 1/29/2018 | | CANC |
Andy J. Long
|
|
|
No ESC review required. ESC permit already issued for B37, see ESC18-00006
|
Routing PW Solid Waste | 1/22/2018 | | 1/25/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing - Design Review | 1/20/2018 | | 1/25/2018 | | FAIL |
Sarah Schafer
|
|
|
DR Mod required.
|
Routing - PLANNING | 1/20/2018 | | 1/23/2018 | | PASS |
David Moser
|
|
|
No review required, see Design Review approval
|
Routing PW Sewer Design | 1/22/2018 | | 1/23/2018 | | PASS |
Mike Sheppard
|
|
|
|
Routing PW Street Lights | 1/22/2018 | | 1/22/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Drainage | 1/22/2018 | | 1/22/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 1/20/2018 | | 1/22/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/20/2018 | | 1/22/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLUMBING | 1/20/2018 | | 1/22/2018 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Intake Approval | | | 1/20/2018 | | PASS |
|
|
|
|
Application received | | | 1/12/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 12 2018 4:12PM
|