BLD-Footing | 6/11/2019 | 6/13/2019 | 6/13/2019 | P | PART |
Tell Riley
|
|
|
Jana Phone #: ###-####//south stair cover only// holes per engineering// setbacks at 5'//
|
Routing Walk-In (Zoning) | 1/16/2018 | 1/16/2018 | 1/16/2018 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 1/16/2018 | 1/16/2018 | 1/16/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 1/16/2018 | | 1/16/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 1/16/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 1/16/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 1/16/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/16/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 1/16/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/16/2018 | | DONE |
|
|
|
|
Application received | | 1/16/2018 | | | |
|
|
|
|