BLD-Blower Door Test Results | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | DONE |
Tell Riley
|
|
|
3.45 ACH 50 1981 CFM @ 50 pa
|
BLD-Final | 9/12/2019 | 9/13/2019 | 9/13/2019 | P | PASS |
Tell Riley
|
|
|
Senad Phone #: ###-####//corrections made// final complete//
|
DOC - Permit Finaled | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Conference | 7/22/2019 | 7/26/2019 | 8/2/2019 | A | DONE |
Tell Riley
|
|
|
check progress....//no one is home//still no driveway or front stoop//
|
BLD-Conference | 7/15/2019 | 7/19/2019 | 7/22/2019 | A | DONE |
Tell Riley
|
|
|
check on status...needs occupancy....//not home//appears to be working on it--hvac truck in drive///
|
BLD-Final | 7/15/2019 | 7/15/2019 | 7/15/2019 | P | FAIL |
Tell Riley
|
|
|
Senad Phone #: ###-####//correction notice issued and posted onsite//
|
BLD-Energy code compliance | 10/22/2018 | 10/22/2018 | 10/22/2018 | P | PASS |
Jim Sly
|
|
|
Senad Phone #: ###-####
|
BLD-Framing/Rough-in | 10/10/2018 | 10/11/2018 | 10/11/2018 | A | PASS |
Jim Sly
|
|
|
Senad Phone #: ###-####
|
Plan Modification Accepted | | | 10/8/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 10/8/2018 | | 10/8/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 6/13/2018 | 6/14/2018 | 6/14/2018 | A | PASS |
Jim Sly
|
|
|
Senad Phone #: ###-####
|
BLD-Foundation | 4/23/2018 | 4/23/2018 | 4/23/2018 | P | PASS |
Jim Sly
|
|
|
rebar // Senad Phone #: ###-####
|
BLD-Footing | 3/29/2018 | 3/30/2018 | 3/30/2018 | A | PASS |
Jim Sly
|
|
|
Please call ahead for access - Senad Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/5/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 2/1/2018 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/1/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/1/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/1/2018 | | DONE |
|
|
|
met
|
Telephone call | | | 2/1/2018 | | DONE |
|
|
|
Spoke with Senad informing him that this permit is ready and the fee amount due for issuance
|
Permit Ready to Issue | | | 2/1/2018 | | DONE |
|
|
|
met
|
Plan assigned to (M_H) | 1/24/2018 | | 1/31/2018 | | DONE |
Michael Hanson
|
|
|
01/29 sfd L1 Paper - plan review completed except for foundation plans not submitted. Contacted applicant via phone to request 2 copies of the S1.0 Foundation plan that are missing from submittal set. Applicant stated would bring tomorrow (1/25) afternoon. MDH
Recieved all missing information and Senad came in and removed the Cable guard railing from the plan. (1/31) MDH
|
Routing - PLAN CHECK | 1/26/2018 | | 1/31/2018 | | PASS |
Michael Hanson
|
|
|
|
Plan resubmittals received | | | 1/31/2018 | | DONE |
|
|
|
received two copies of reduces site plan; taken to Michael Hanson
|
Case Summary (BLD) | | | 1/31/2018 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2018 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 1/26/2018 | | FAIL |
Michael Hanson
|
|
|
Missing foundation plan and special inspection form #310. MDH
|
Plan resubmittals requested | | | 1/26/2018 | | DONE |
|
|
|
Two copies of S1 Foundation Plan stamped and taken to M_H
|
Routing - PLAN CHECK | 1/24/2018 | | 1/26/2018 | | FAIL |
Michael Hanson
|
|
|
Missing foundation plan and special inspection form for cable rail. MDH-1-30-18 also please do not issue until we have the small site plans for P & Z. CAN
|
Plan assigned to (BJM) | 1/16/2018 | 1/16/2018 | 1/24/2018 | | CANC |
Brian McGowan
|
|
|
1-29 sfd L1 Paper
|
Routing - MECHANICAL | 1/19/2018 | | 1/24/2018 | | PASS |
Troy James
|
|
|
|
Plan Reviewer's activity | | | 1/24/2018 | | DONE |
Michael Hanson
|
|
|
Contacted applicant via phone to request 2 copies of the S1.0 Foundation plan that are missing from submittal set. Applicant stated would bring tomorrow (1/25) afternoon. MDH
|
Telephone call | | | 1/22/2018 | | DONE |
|
|
|
emailed Senad again that we need the small site plan from the architect
|
Routing - PLANNING | 1/18/2018 | | 1/19/2018 | | PASS |
Colleen T Carroll
|
|
|
Site plan to be scanned in when applicant provides a reduced copy!
|
Route to Impact Fee Review | 1/17/2018 | 1/20/2018 | 1/18/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 1/16/2018 | | 1/18/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | | | 1/18/2018 | | PASS |
|
|
|
|
Telephone call | | | 1/18/2018 | | DONE |
|
|
|
called Senad-we need small site plan
|
Plans ACCEPTED BY PLAN TECH | | | 1/16/2018 | | DONE |
|
|
|
|
Intake Approval | | | 1/16/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/16/2018 | | DONE |
|
|
|
|
Application received | | 1/16/2018 | | | |
|
|
|
|