BLD-Final | 5/23/2018 | 5/24/2018 | 5/24/2018 | A | PASS |
Dave Hannah
|
|
|
Goldy-call 30 mins before Phone #: ###-####
|
DOC - Permit Finaled | 5/24/2018 | 5/24/2018 | 5/24/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Other | 4/9/2018 | 4/9/2018 | 4/9/2018 | P | PASS |
Dave Hannah
|
|
|
check fire resistant lumber- Goldie Phone #: ###-#### 2x lumber is fire treated
|
BLD-Footing | 2/8/2018 | 2/9/2018 | 2/9/2018 | A | PASS |
Dave Hannah
|
|
|
Goldy Phone #: ###-####
|
PubWorks Subgrade Approval | 2/9/2018 | 2/9/2018 | 2/9/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 1/19/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 1/17/2018 | 1/17/2018 | 1/19/2018 | | PASS |
Josh Bogle
|
|
|
due 1/23
|
1st review completed | | | 1/19/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 1/19/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 1/19/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/19/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 1/19/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/19/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/17/2018 | | 1/19/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing Walk-In (PW Hillside) | 1/17/2018 | 1/17/2018 | 1/17/2018 | | DONE |
Melissa Jannusch
|
|
|
|
Routing Walk-In (Zoning) | 1/17/2018 | 1/17/2018 | 1/17/2018 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 1/17/2018 | 1/17/2018 | 1/17/2018 | P | CANC |
Josh Bogle
|
|
|
took in as a Level 2
|
Routing - Erosion and Sediment | 1/17/2018 | | 1/17/2018 | | PASS |
Michael Zawacki
|
|
|
Waiver approved.
|
Application received | | 1/17/2018 | | | |
|
|
|
|