BLD-Energy code compliance | 10/8/2018 | 10/8/2018 | 10/8/2018 | P | PASS |
Dave Hannah
|
|
|
Please call ahead for access - Taylor Phone #: ###-####
|
BLD-Framing/Rough-in | 10/3/2018 | 10/4/2018 | 10/4/2018 | A | PASS |
Jim Sly
|
|
|
Taylor Phone #: ###-####
|
BLD-Framing/Rough-in | 10/3/2018 | 10/3/2018 | 10/3/2018 | P | DEFR |
Jim Storey
|
|
|
Taylor Phone #: ###-#### out of time
|
BLD-Wall Bracing | 9/11/2018 | 9/12/2018 | 9/12/2018 | A | PASS |
Dave Hannah
|
|
|
Taylor Phone #: ###-####
|
BLD-Other | 9/11/2018 | 9/12/2018 | 9/12/2018 | A | PASS |
Dave Hannah
|
|
|
floor joist // Taylor Phone #: ###-####
|
BLD-Footing | 6/7/2018 | 6/8/2018 | 6/8/2018 | A | PASS |
Dave Hannah
|
|
|
Shaun Phone #: ###-####
|
BLD-Foundation | 6/4/2018 | 6/5/2018 | 6/7/2018 | P | CANC |
Dave Hannah
|
|
|
Taylor Phone #: ###-####
|
BLD-Footing | 6/6/2018 | 6/6/2018 | 6/6/2018 | P | NR |
Dave Hannah
|
|
|
Talyor Phone #: ###-####
|
PubWorks Subgrade Approval | 6/5/2018 | 6/5/2018 | 6/5/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 5/1/2018 | 5/2/2018 | 5/2/2018 | P | CANC |
Dave Hannah
|
|
|
Taylor Phone #: ###-####
|
BLD-Footing | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | NR |
Jim Storey
|
|
|
Pier pad - Taylor Phone #: ###-#### no pw sign off
|
OVERRIDE | | | 1/19/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 1/18/2018 | 1/18/2018 | 1/19/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing PW Grading-Hillside | 1/19/2018 | | 1/19/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
|
Routing - PLAN CHECK | 1/19/2018 | | 1/19/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 1/19/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 1/19/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 1/19/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/19/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 1/19/2018 | | DONE |
|
|
|
met
|
Telephone call | | | 1/19/2018 | | DONE |
|
|
|
called -talked to Keren to let know permit is ready and how much is owed-she will let Clint know
|
Issue PAID IN FULL permit | | | 1/19/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 1/17/2018 | | 1/18/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan with narrative and site map approved. Valid stormwater team.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/18/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 1/17/2018 | 1/17/2018 | 1/17/2018 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 1/17/2018 | 1/17/2018 | 1/17/2018 | P | CANC |
Josh Bogle
|
|
|
Hillside addition - took in as level 2
|
Application received | | 1/17/2018 | | | |
|
|
|
|
Routing - PLAN CHECK | 1/17/2018 | | | | |
Josh Bogle
|
|
|
|