Permit Information
Permit NumberBLD18-00219
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2361 S TRAPPER PL
Project NameHN 14-1
Customer Number 
ePlanReviewYes
Description
***PRESCRIPTIVE ENERGY APPROACH*** WUI ZONE A REQUIRMENTS***HILLSIDE = IN*** Permit for the construction of a new 3580 sq. ft., two story (first story 3113 sq. ft., second story 467 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 373 sq. ft. of covered patio/porch and a 845 sq. ft. attached garage per the approved plans and any notations. MDH SP-01 zoning and setbacks per planning.

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/13/20188/13/20188/13/2018PPASS
DetailsBrandon Shaw
Les Phone #: ###-####
DOC - Permit Finaled8/13/20188/13/20188/13/2018PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results8/13/20188/13/20188/13/2018PDONE
DetailsBrandon Shaw
ACH50- 3.68
PubWorks Occupancy Approval8/9/20188/9/20188/9/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Energy code compliance5/16/20185/17/20185/17/2018APASS
DetailsBrandon Shaw
Framing corrections SAT...
BLD-Framing/Rough-in5/14/20185/15/20185/15/2018AFAIL
DetailsBrandon Shaw
See Correction notice


OK to insulate
Plan Modification Accepted  5/1/2018 DONE
new manual j report
Routing - MECHANICAL5/1/2018 5/1/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Other4/26/20184/26/20184/27/2018PPASS
DetailsBrandon Shaw
Sofit// Les Phone #: ###-####
BLD-Wall Bracing4/9/20184/10/20184/10/2018APASS
DetailsBrandon Shaw
Austin Phone #: ###-####
BLD-Foundation3/13/20183/13/20183/13/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Footing3/8/20183/9/20183/9/2018APASS
DetailsBrandon Shaw
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
PubWorks Subgrade Approval3/9/20183/9/20183/9/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Issue PAID IN FULL permit  2/9/2018 DONE
Inspection Record Card- Bld  2/9/2018 DONE
OVERRIDE  2/8/2018  
Routing - PLAN CHECK1/29/2018 2/8/2018 FAIL
DetailsMichael Hanson
Returned to applicant - Structural concerns of roof framing at garage and bonus room area. MDH
Plan assigned to (M_H)2/7/2018 2/8/2018 DONE
DetailsMichael Hanson
02/15 sfd L2 ePlan - 1st review completed. Returned to applicant - Structural concerns of roof framing at garage and bonus room area. MDH
Plan Reviewer's activity  2/8/2018 DONE
DetailsMichael Hanson
1st review completed  2/8/2018 FAIL
DetailsMichael Hanson
Returned to applicant - Structural concerns of roof framing at garage and bonus room area. MDH
Routing - PLAN CHECK2/8/2018 2/8/2018 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  2/8/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  2/8/2018 DONE
Plan assigned to (BJM)1/29/20181/29/20182/7/2018 DEFR
DetailsBrian McGowan
2-15 sfd L2 ePlan
Routing - MECHANICAL1/29/2018 2/1/2018 PASS
DetailsTroy James
Routing - FIRE1/29/20181/29/20181/31/2018 PASS
DetailsScott Arellano
All portions of this structure shall comply with the provisions of BMC 7-01-69 section 4920 for defensible space and are subject to Fire Department inspection.
Routing PW Grading-Hillside1/29/2018 1/31/2018 PASS
DetailsMelissa Jannusch


A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

Route to Impact Fee Review1/29/20182/1/20181/30/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing1/29/2018 1/30/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/29/2018 1/29/2018 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment1/29/2018 1/29/2018 PASS
DetailsMichael Zawacki
Site inspection required prior to construction.
Routing - PLANNING1/29/2018 1/29/2018 PASS
DetailsSue Cummings
Intake Approval  1/29/2018 FAIL
Need ESC Plan
Plans ACCEPTED BY PLAN TECH  1/29/2018 DONE
Intake Approval  1/29/2018 PASS
Recd Pcfee & Taken To Pln CK  1/29/2018 DONE
Intake Approval  1/22/2018 FAIL
DetailsChristina Prado
Need ESC Plan
Application received  1/19/2018 DONE
Application submitted via PDS Online on Jan 19 2018 3:08PM