BLD-Final | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
DOC - Permit Finaled | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.68
|
PubWorks Occupancy Approval | 8/9/2018 | 8/9/2018 | 8/9/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 5/16/2018 | 5/17/2018 | 5/17/2018 | A | PASS |
Brandon Shaw
|
|
|
Framing corrections SAT...
|
BLD-Framing/Rough-in | 5/14/2018 | 5/15/2018 | 5/15/2018 | A | FAIL |
Brandon Shaw
|
|
|
See Correction notice
OK to insulate
|
Plan Modification Accepted | | | 5/1/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 5/1/2018 | | 5/1/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Other | 4/26/2018 | 4/26/2018 | 4/27/2018 | P | PASS |
Brandon Shaw
|
|
|
Sofit// Les Phone #: ###-####
|
BLD-Wall Bracing | 4/9/2018 | 4/10/2018 | 4/10/2018 | A | PASS |
Brandon Shaw
|
|
|
Austin Phone #: ###-####
|
BLD-Foundation | 3/13/2018 | 3/13/2018 | 3/13/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 3/8/2018 | 3/9/2018 | 3/9/2018 | A | PASS |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
|
PubWorks Subgrade Approval | 3/9/2018 | 3/9/2018 | 3/9/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 2/9/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/9/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 2/8/2018 | | |
|
|
|
|
Routing - PLAN CHECK | 1/29/2018 | | 2/8/2018 | | FAIL |
Michael Hanson
|
|
|
Returned to applicant - Structural concerns of roof framing at garage and bonus room area. MDH
|
Plan assigned to (M_H) | 2/7/2018 | | 2/8/2018 | | DONE |
Michael Hanson
|
|
|
02/15 sfd L2 ePlan - 1st review completed. Returned to applicant - Structural concerns of roof framing at garage and bonus room area. MDH
|
Plan Reviewer's activity | | | 2/8/2018 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 2/8/2018 | | FAIL |
Michael Hanson
|
|
|
Returned to applicant - Structural concerns of roof framing at garage and bonus room area. MDH
|
Routing - PLAN CHECK | 2/8/2018 | | 2/8/2018 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 2/8/2018 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 1/29/2018 | 1/29/2018 | 2/7/2018 | | DEFR |
Brian McGowan
|
|
|
2-15 sfd L2 ePlan
|
Routing - MECHANICAL | 1/29/2018 | | 2/1/2018 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 1/29/2018 | 1/29/2018 | 1/31/2018 | | PASS |
Scott Arellano
|
|
|
All portions of this structure shall comply with the provisions of BMC 7-01-69 section 4920 for defensible space and are subject to Fire Department inspection.
|
Routing PW Grading-Hillside | 1/29/2018 | | 1/31/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Route to Impact Fee Review | 1/29/2018 | 2/1/2018 | 1/30/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 1/29/2018 | | 1/30/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/29/2018 | | 1/29/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 1/29/2018 | | 1/29/2018 | | PASS |
Michael Zawacki
|
|
|
Site inspection required prior to construction.
|
Routing - PLANNING | 1/29/2018 | | 1/29/2018 | | PASS |
Sue Cummings
|
|
|
|
Intake Approval | | | 1/29/2018 | | FAIL |
|
|
|
Need ESC Plan
|
Plans ACCEPTED BY PLAN TECH | | | 1/29/2018 | | DONE |
|
|
|
|
Intake Approval | | | 1/29/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/29/2018 | | DONE |
|
|
|
|
Intake Approval | | | 1/22/2018 | | FAIL |
Christina Prado
|
|
|
Need ESC Plan
|
Application received | | | 1/19/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 19 2018 3:08PM
|