Permit Information
Permit NumberBLD18-00221
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 1055 N CURTIS RD
Project NameSt Al's Hospital - Accelerator
Customer Number 
ePlanReviewYes
Description
(ST. AL’S HOSPITAL – LINEAR ACCELERATOR VAULT – 1ST STORY – NORTHEAST AREA OF NORTH TOWER) The fire sprinkler system is used for high rise and for occupancy. Interior demolition including the removal of the existing vault door and the surrounding concrete, the removal of some wall furring, and the removal of the existing ceiling is also covered under this permit. To remodel an existing 877 square foot linear accelerator vault and the associated 162 square foot control room (1,039 square feet total) to accommodate an equipment upgrade. Work is to include a concrete slab to fill an existing shallow pit, interior nonbearing walls, interior doors, a new leaded wall, wall surface protection, wall finishes, resilient sheet flooring, carpet tile, suspended acoustical ceilings with lay-in ceiling panels and translucent ceiling panels, a structural steel header at the enlarged vault door, and a new vault door. Special Inspection is required for anchors post-installed in hardened concrete. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The remodel area is located entirely within an existing care suite and smoke compartment. The fire sprinkler system is required to comply with NFPA 13 (including the installation of quick-response heads within the remodel areas) and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/20/20187/26/2018 DONE
This permit finaled on the web by Brandon Byington
First Notice 6/25/20187/10/2018 DONE
mailed 7-11-18
Permanent Occupancy  6/15/2018  
BLD-Final6/13/20186/14/20186/14/2018PPASS
DetailsMike Jordan
ceil Phone #: ###-####. Ok for perm occ. MAjority of scope of work for this project was deleted. Doors and concrete remained, no demo on walls for new lead. Pit was filled in and new equipment.
FIRE-Final Inspection6/13/20186/14/20186/14/2018APASS
DetailsTroy Cobbley
Life safety passed

Cecil Phone #: ###-####
BLD-Final6/13/20186/13/20186/13/2018PCANC
DetailsMike Jordan
ceil Phone #: ###-####
Issue PAID IN FULL permit  3/20/2018 DONE
Print Occupancy Form  3/20/2018 DONE
Print Occupancy Form  3/20/2018 DONE
Plan assigned to (CJW)2/5/20182/5/20183/14/2018 PASS
DetailsCarl Westfall
(Feb 21 - 15 days) (24 sheets) SARMC LINAC Upgrade
Routing - PLAN CHECK2/5/2018 3/14/2018 PASS
DetailsCarl Westfall
1st IBC plan review completed and approved
1st review completed  3/14/2018 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/14/2018 DONE
Permit Ready to Issue  3/14/2018 DONE
email Brandon Byington at bbyington@kreizenbeck.com
Need
GC Form-met
Revised Cert of Value-met
Routing Off Site - STRUCTURAL2/5/2018 2/13/2018 PASS
DetailsCarl Westfall
Jan Welch (Stapley)
Routing - FIRE2/5/20182/5/20182/9/2018 PASS
DetailsErika Akin
Attached comments to case
Routing - MECHANICAL2/5/2018 2/8/2018 PASS
DetailsTroy James
Routing - PLUMBING2/5/2018 2/7/2018 PASS
DetailsDaryl Spivey
No plumbing plan to review
Routing - Addressing2/5/2018 2/6/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS2/5/2018 2/6/2018 PASS
DetailsMorgan Webb
Intake Approval  2/5/2018 PASS
DetailsAdele J Schaffeld-Griffin
Pre screen accepted by Carl W
Plan Reviewer's activity  2/1/2018 PASS
Plan intake review approved
Application received  1/19/2018 DONE