BLD-Final | 10/5/2018 | 10/5/2018 | 10/5/2018 | P | PASS |
Brandon Shaw
|
|
|
Bill Phone #: ###-####
|
DOC - Permit Finaled | 10/5/2018 | 10/5/2018 | 10/5/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 10/5/2018 | 10/5/2018 | 10/5/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50-m 3.2
|
BLD-Final | 10/4/2018 | 10/5/2018 | 10/5/2018 | A | NR |
Dave Hannah
|
|
|
Bill Phone #: ###-#### needs co2 detector in front entry, egress window in up stairsbedroom blower door test
|
BLD-Conference | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | DONE |
Brandon Shaw
|
|
|
Daryl Phone #: ###-####
|
BLD-Wall Bracing | 6/8/2018 | 6/8/2018 | 6/8/2018 | P | PASS |
Brandon Shaw
|
|
|
Bill Phone #: ###-####
|
BLD-Energy code compliance | 6/1/2018 | 6/4/2018 | 6/7/2018 | A | PASS |
Brandon Shaw
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 5/18/2018 | 5/21/2018 | 5/21/2018 | A | PASS |
Brandon Shaw
|
|
|
Interior ledger board to have 4 16d per stud Per plans, no 220 plug-in at game room/kitchenette
|
Plan Modification Accepted | | | 5/3/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 5/3/2018 | | 5/3/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 4/17/2018 | 4/17/2018 | 4/17/2018 | P | PASS |
Brandon Shaw
|
|
|
shear // Bill Phone #: ###-####
|
BLD-Energy code compliance | 4/12/2018 | 4/12/2018 | 4/13/2018 | P | CANC |
Brandon Shaw
|
|
|
Bill Phone #: ###-####
|
BLD-Foundation | 3/6/2018 | 3/7/2018 | 3/7/2018 | A | PASS |
Brandon Shaw
|
|
|
As late as possible Phone #: 2088708888 >> Inspection requested via mobile web by Wes
|
BLD-Footing | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
Plan assigned to (JAB) Josh | 2/12/2018 | 2/12/2018 | 2/15/2018 | | PASS |
Josh Bogle
|
|
|
1st done - lacks WUI details
|
Routing - PLAN CHECK | 2/15/2018 | | 2/15/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/15/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 2/15/2018 | | DONE |
|
|
|
met
|
Issue PAID IN FULL permit | | | 2/15/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/15/2018 | | DONE |
|
|
|
|
1st review completed | | | 2/13/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/5/2018 | | 2/13/2018 | | FAIL |
Josh Bogle
|
|
|
|
Plan assigned to (RDP) | 2/5/2018 | 2/5/2018 | 2/12/2018 | | DEFR |
Rob Patrick
|
|
|
2/22 sfd L2 ePlan
|
Routing PW Flood Plain | 2/5/2018 | | 2/8/2018 | | PASS |
Jason C. Taylor
|
|
|
Approved LOMR on File. No floodplain review required. JCT
|
Route to Impact Fee Review | 2/5/2018 | 2/8/2018 | 2/6/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 2/5/2018 | | 2/5/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 2/5/2018 | | 2/5/2018 | | PASS |
Jeff Lowe
|
|
|
accessory dwelling unit not approved with this permit. 5-29-18 after discussion with HS and CR it was determined that a steam oven is okay to install.
|
Routing - Addressing | 2/5/2018 | | 2/5/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/5/2018 | | 2/5/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/5/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/5/2018 | | DONE |
|
|
|
|
Intake Approval | | | 2/5/2018 | | PASS |
|
|
|
|
Intake Approval | | | 1/24/2018 | | FAIL |
|
|
|
Need: -Elevation Certifcate or map revision.
-Fire rated door and walls between M.I Law qaurters.
-2012 IRC letter or change to 2015 IRC.
-RES Check or prescriptive
-Need separate address for M.I Law quarters (scope does not include sq. ft. for adu, needs sep. permit for adu. Can do 2 permits under one Eplan.) (377 sq. ft adu)
|
Application received | | | 1/22/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 22 2018 6:45PM
|