Permit Information
Permit NumberBLD18-00247
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 3431 S PHEASANT TAIL WAY
Project Namehc 62-1 Clearwater
Customer Number 
ePlanReviewYes
Description
*** WUI ZONE B REQUIREMENTS, CLASS A ROOF*** Permit for the construction of a new 1,927 sq. ft., two story (first story 695 sq. ft., second story 1,225 sq. ft.) single family dwelling with 3 bedrooms, 2 and a half bathrooms, approximately 7 sq. ft. of covered patio/porch and a 510 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/19/20189/19/20189/19/2018PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled9/19/20189/19/20189/19/2018PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results9/19/20189/19/20189/19/2018PDONE
DetailsBrandon Shaw
ACH50- 3.79
BLD-Final9/18/20189/19/20189/19/2018ACANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled from web by: Kyle Seick
BLD-Energy code compliance7/2/20187/3/20187/3/2018APASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Framing/Rough-in6/27/20186/28/20186/28/2018AFAIL
DetailsBrandon Shaw
See correction notice

OK to insulate
BLD-Framing/Rough-in6/27/20186/27/20186/27/2018ACANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled from web by: Kyle Seick
BLD-Wall Bracing6/22/20186/25/20186/25/2018APASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Wall Bracing6/18/20186/19/20186/19/2018AFAIL
DetailsBrandon Shaw
1) Provide hold downs as per plans
2) Hold downs not installed as per manufactures recommendation
3) uncover exterior at garage to verify nailing
4) Edge/field nailing at be as shear schedule

See Red Paint
BLD-Foundation4/16/20184/16/20184/16/2018PPASS
DetailsBrandon Shaw
Work in progress
Issue PAID IN FULL permit  2/1/2018 DONE
Inspection Record Card- Bld  2/1/2018 DONE
OVERRIDE  1/31/2018  
Plan assigned to (M_H)1/30/2018 1/31/2018 DONE
DetailsMichael Hanson
02/05 sfd L1 ePlan
Plan Reviewer's activity  1/31/2018 DONE
DetailsMichael Hanson
1st review completed  1/31/2018 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  1/31/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  1/31/2018 DONE
met
Routing - PLAN CHECK1/23/2018 1/31/2018 PASS
DetailsMichael Hanson
Plan assigned to (RDP)1/23/20181/23/20181/30/2018 DEFR
DetailsRob Patrick
2/5 sfd L1 ePlan
Routing - MECHANICAL1/23/2018 1/26/2018 PASS
DetailsTroy James
Route to Impact Fee Review1/23/20181/26/20181/24/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Application received  1/23/2018 DONE
Application submitted via PDS Online on Jan 23 2018 7:37AM
Plans ACCEPTED BY PLAN TECH  1/23/2018 DONE
Recd Pcfee & Taken To Pln CK  1/23/2018 DONE
Intake Approval  1/23/2018 PASS
Routing - PLANNING1/23/2018 1/23/2018 PASS
DetailsSue Cummings
Routing - Addressing1/23/2018 1/23/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/23/2018 1/23/2018 PASS
DetailsMorgan Webb