Permit Information
Permit NumberBLD18-00250
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 3423 S PHEASANT TAIL WAY
Project NameOwyhee Bonus hc 63-1
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2,639 sq. ft., two story (first story 1,328 sq. ft., second story 1,311 sq. ft.) single family dwelling with 4 bedrooms, 2 and a half bathrooms, approximately 15 sq. ft. of covered patio/porch and a 565 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy. SP-01 zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/22/201810/23/201810/23/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled10/23/201810/23/201810/23/2018PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results10/23/201810/23/201810/23/2018ADONE
DetailsBrandon Shaw
ACH50- 4.23
BLD-Energy code compliance8/23/20188/23/20188/23/2018PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Framing/Rough-in8/20/20188/20/20188/20/2018PPASS
DetailsBrandon Shaw
Corrections SAT...

OK to insulate
BLD-Framing/Rough-in8/16/20188/16/20188/16/2018PFAIL
DetailsBrandon Shaw
Need foam/air seal...
Beams and support girders to bear down to foundation as per plans...
Squash blocks required for point load at support girder...
Hold downs to be installed per manufactures installation instructions...
Fire blocking needed at gas line chase...
BLD-Wall Bracing8/3/20188/3/20188/3/2018PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Foundation4/17/20184/17/20184/17/2018APASS
DetailsBrandon Shaw
Work in progress
BLD-Footing4/16/20184/16/20184/16/2018PPASS
DetailsBrandon Shaw
Work in progress
Issue PAID IN FULL permit  3/19/2018 DONE
Inspection Record Card- Bld  3/19/2018 DONE
OVERRIDE  3/16/2018  
Plan assigned to (RDP)2/23/20182/23/20183/16/2018 DONE
DetailsRob Patrick
Plan Modification
Routing - PLAN CHECK2/23/2018 3/16/2018 PASS
DetailsRob Patrick
Plan Modification
Permit Ready to Issue  3/16/2018 DONE
DO NOT ISSUE. PLAN MOD
Routing - MECHANICAL2/23/2018 2/28/2018 PASS
DetailsTroy James
Plan Modification Accepted  2/23/2018 DONE
DetailsChristina Prado
Need to update second floor - turning 4th into loft
Issue PAID IN FULL permit  2/1/2018 DONE
Inspection Record Card- Bld  2/1/2018 DONE
Inspection Record Card- Bld  2/1/2018 DONE
CHANGE ISSUED DATE  2/1/2018 DONE
DetailsRita DeYoung
OVERRIDE  1/31/2018  
Plan assigned to (RDP)1/23/20181/23/20181/31/2018 DONE
DetailsRob Patrick
2/5 sfd L1 ePlan
Routing - PLAN CHECK1/23/2018 1/31/2018 PASS
DetailsRob Patrick
1st review completed  1/31/2018 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  1/31/2018 DONE
DetailsRob Patrick
Permit Ready to Issue  1/31/2018 DONE
Met
Routing - MECHANICAL1/23/2018 1/26/2018 PASS
DetailsTroy James
Route to Impact Fee Review1/23/20181/26/20181/24/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Application received  1/23/2018 DONE
Application submitted via PDS Online on Jan 23 2018 8:28AM
Plans ACCEPTED BY PLAN TECH  1/23/2018 DONE
Recd Pcfee & Taken To Pln CK  1/23/2018 DONE
Intake Approval  1/23/2018 PASS
Routing - PLANNING1/23/2018 1/23/2018 PASS
DetailsSue Cummings
Routing - Addressing1/23/2018 1/23/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/23/2018 1/23/2018 PASS
DetailsMorgan Webb