BLD-Aging Inspection | 1/18/2019 | 1/18/2019 | 1/18/2019 | | PASS |
Jim Storey
|
|
|
Expires: 03/05/19 ncff
|
BLD-Aging Inspection | 9/6/2018 | 9/6/2018 | 9/6/2018 | | PASS |
Jim Storey
|
|
|
|
BLD-Footing | 4/24/2018 | 4/25/2018 | 4/25/2018 | A | PASS |
Brandon Shaw
|
|
|
OK to pour
|
BLD-Footing | 4/24/2018 | 4/25/2018 | 4/25/2018 | A | CANC |
Jim Storey
|
|
|
Kevin Phone #: ###-####
|
Meeting | | | 2/23/2018 | | DONE |
|
|
|
Per Ashley and Christine they want to act as GC
|
(F) Reprint permit | | | 2/23/2018 | | DONE |
|
|
|
|
Telephone call | | | 2/21/2018 | | DONE |
|
|
|
Kristy called again and wants to be the GC-she brought the plans in for review and she paid for the permit- I told her to just bring us the GC form and we'll put it back in her name
|
Telephone call | | | 2/7/2018 | | DONE |
|
|
|
talked to Chris-she doesn't want the GC to be on permit so she is going to fill out the 302 form and send it or bring it in to us-she wants to be the GC
|
Routing Walk-In (BLD) | 1/23/2018 | 1/23/2018 | 1/23/2018 | A | FAIL |
Rob Patrick
|
|
|
|
Routing Walk-In (BLD) | 1/23/2018 | 1/23/2018 | 1/23/2018 | P | DONE |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 1/23/2018 | | 1/23/2018 | | PASS |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 1/23/2018 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 1/23/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/23/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 1/23/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/23/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/23/2018 | | 1/23/2018 | | FAIL |
Rob Patrick
|
|
|
Needs possible Special inspection for Epoxy in footings.
|
1st review completed | | | 1/23/2018 | | DONE |
Rob Patrick
|
|
|
|
Application received | | 1/23/2018 | | | |
|
|
|
|