BLD-Final | 4/9/2019 | 4/10/2019 | 4/10/2019 | A | PASS |
Tony Young
|
|
|
Scott- please call for access Phone #: ###-####
|
DOC - Permit Finaled | 4/10/2019 | 4/10/2019 | 4/10/2019 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Blower Door Test Results | 4/10/2019 | 4/10/2019 | 4/10/2019 | P | DONE |
Tony Young
|
|
|
Scott- please call for access Phone #: ###-#### // 4.5
|
PubWorks Occupancy Approval | 4/9/2019 | 4/9/2019 | 4/9/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Aging Inspection | 3/1/2019 | 3/1/2019 | 3/7/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Other | 10/23/2018 | 10/24/2018 | 10/24/2018 | A | PASS |
Tony Young
|
|
|
sofit-Scott Phone #: ###-####
|
BLD-Energy code compliance | 10/17/2018 | 10/18/2018 | 10/18/2018 | P | PASS |
Tony Young
|
|
|
Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 10/17/2018 | 10/17/2018 | 10/17/2018 | P | PASS |
Tony Young
|
|
|
scott johnson Phone #: ###-####
|
BLD-Framing/Rough-in | 10/16/2018 | 10/17/2018 | 10/17/2018 | A | PASS |
Tony Young
|
|
|
Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 10/15/2018 | 10/16/2018 | 10/16/2018 | A | PEND |
Tony Young
|
|
|
Scott Phone #: ###-####,, needs fireplace to pass inspection,, failed rough in
|
BLD-Framing/Rough-in | 10/15/2018 | 10/15/2018 | 10/15/2018 | P | NR |
Tony Young
|
|
|
Scott Phone #: ###-####,, needs fireplace inspection,,
|
BLD-Wall Bracing | 9/24/2018 | 9/25/2018 | 9/25/2018 | A | PASS |
Brandon Shaw
|
|
|
Scott Phone #: ###-####
|
BLD-Footing | 8/24/2018 | 8/24/2018 | 8/24/2018 | P | PART |
Tony Young
|
|
|
Pat Phone #: ###-####,, foundation poured,, ok
|
BLD-Footing | 8/7/2018 | 8/7/2018 | 8/7/2018 | P | PART |
Tony Young
|
|
|
Pat Phone #: ###-####,, work in progress
|
PubWorks Subgrade Approval | 8/7/2018 | 8/7/2018 | 8/7/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 7/25/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/25/2018 | | DONE |
|
|
|
|
Meeting | | | 7/24/2018 | | DONE |
|
|
|
sent email to don recommending to send in an extension request (don emailed back stating permit will be picked up tomorrow 7/25)
|
OVERRIDE | | | 7/23/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 3/30/2018 | 3/30/2018 | 7/23/2018 | | DONE |
Brian McGowan
|
|
|
1st review complete- 4-18 sfd L2 ePlan
|
Routing - PLAN CHECK | 7/23/2018 | | 7/23/2018 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/23/2018 | | DONE |
|
|
|
Need
RP
|
Routing PW Grading-Hillside | 6/5/2018 | | 6/5/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - PLAN CHECK | 5/18/2018 | | 5/18/2018 | | FAIL |
Brian McGowan
|
|
|
Did not resolve all corrections
|
Routing PW Grading-Hillside | 5/17/2018 | | 5/17/2018 | | FAIL |
Melissa Jannusch
|
|
|
See changemarks. Need retaining wall calculations
|
Routing - PLAN CHECK | 3/30/2018 | | 4/19/2018 | | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 4/18/2018 | | FAIL |
Brian McGowan
|
|
|
Engineering for retaining wall and foundation
|
Routing - FIRE | 3/30/2018 | 3/30/2018 | 4/11/2018 | | PASS |
Erika Akin
|
|
|
Plans were reviewed for FD access, availability of hydrants and defensible space.
|
Routing PW Grading-Hillside | 3/30/2018 | | 4/4/2018 | | FAIL |
Melissa Jannusch
|
|
|
See changemarks in ePlan
|
Route to Impact Fee Review | 3/30/2018 | 4/2/2018 | 4/2/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Erosion and Sediment | 3/30/2018 | | 4/2/2018 | | PASS |
Michael Zawacki
|
|
|
Hillside lot. Site prep inspection required.
|
Routing - MECHANICAL | 3/30/2018 | | 4/2/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 3/30/2018 | | 3/30/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 3/30/2018 | | 3/30/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 3/30/2018 | | 3/30/2018 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 3/30/2018 | | FAIL |
|
|
|
3/30-Please provide most updated grading and drainage plans that were approved under the CFH review process. The driveway configuration had been altered and the wall in the front setback reduced. --MMJ ###-#### (everything else ok)
|
Plans ACCEPTED BY PLAN TECH | | | 3/30/2018 | | DONE |
|
|
|
|
Intake Approval | | | 3/30/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/30/2018 | | DONE |
|
|
|
|
Telephone call | | | 3/22/2018 | | DONE |
|
|
|
plans were given to me to submit for a resubmittal but they were done online so Don will need to come get these and submit threw e plan. Called him and left a message on his cell phone
|
Intake Approval | | | 2/12/2018 | | FAIL |
|
|
|
still need the 2012 IRC letter and approval letter from P & Z. I don't show one has been started
|
Intake Approval | | | 2/7/2018 | | FAIL |
|
|
|
Project will require a CAT II Hillside application prior to acceptance of the building permit application. Application #114 will need to be filled out and turned in to the Planning & Zoning counter at city hall with the application fee. Once the application has been approved by P&Z please upload the approval letter and then this building permit case can be routed for approval.
|
Intake Approval | | | 1/30/2018 | | FAIL |
|
|
|
Has not applied for CFH case yet
|
Intake Approval | | | 1/26/2018 | | FAIL |
|
|
|
CAT II per Melissa
Missing letter to review under 2012
Plans need to be separated
|
Application received | | | 1/23/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 23 2018 10:43AM
|