BLD-Final | 2/20/2018 | 2/21/2018 | 2/21/2018 | A | PASS |
Mike Jordan
|
|
|
Glenn Phone #: ###-####. racking less than 8ft. ok for perm occ.
|
FIRE-Final Inspection | 2/20/2018 | 2/21/2018 | 2/21/2018 | A | PASS |
Jim Page
|
|
|
Racking has been lowered to below 8 foot, final life safety inspection complete.
|
Permanent Occupancy | | | 2/21/2018 | | DONE |
|
|
|
|
BLD-Final | 1/30/2018 | 1/31/2018 | 1/31/2018 | P | PART |
Mike Jordan
|
|
|
Philip Phone #: ###-####. Ok for temp occ. Needs racking permit.
|
FIRE-Final Inspection | 1/30/2018 | 1/31/2018 | 1/31/2018 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given with Scotts permission until a racking permit is issued/finaled for the warehouse storage racks.
Philip Phone #: ###-####
|
Temporary Occupancy | 1/31/2018 | 5/1/2018 | 1/31/2018 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 1/30/2018 | 1/31/2018 | 1/31/2018 | A | CANC |
Mike Jordan
|
|
|
call when on way // Philip Phone #: ###-####
|
FIRE-Final Inspection | 1/30/2018 | 1/30/2018 | 1/30/2018 | P | FAIL |
Troy Cobbley
|
|
|
Repair the exterior door exit signs/emergency lights, remove the bar from the rear exit door, provide racking permit as discussed.
call when on way // Philip Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/30/2018 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/2018 | | DONE |
|
|
|
|
1st review completed | | | 1/29/2018 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/29/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/29/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/29/2018 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Telephone call | | | 1/29/2018 | | DONE |
Christina Prado
|
|
|
Called Philip to advise permit is ready to issue
|
Plan assigned to (JG) | 1/23/2018 | | 1/29/2018 | | PASS |
Javier Guzman
|
|
|
1/29 L2 OMEGA TECH LABS INC Occ Eval
|
Routing - PLAN CHECK | 1/26/2018 | | 1/29/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - PUBLIC WORKS | 1/23/2018 | | 1/26/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Environmental | 1/24/2018 | | 1/25/2018 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Sewer Rating | 1/24/2018 | | 1/24/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - FIRE | 1/23/2018 | | 1/23/2018 | | PASS |
Scott Arellano
|
|
|
No plan provided to review? Therefore no comments will be attached and no contruction is allowed under this permit. Final approval subject to satisfactory walk through with PDS/Fire life safety field inspector.
|
Routing - Addressing | 1/23/2018 | | 1/23/2018 | | PASS |
Doug Chausow
|
|
|
Correct address 5858 W Franklin Rd
|
Plans ACCEPTED BY PLAN TECH | | | 1/23/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/23/2018 | | DONE |
|
|
|
|
Intake Approval | | | 1/23/2018 | | PASS |
Tiffany Carson-Herker
|
|
|
|
First Notice | | 3/3/2018 | | | |
|
|
|
|
Application received | | 1/23/2018 | | | |
|
|
|
|