Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-00266
StatusFinaled
Name RUSS MCCREA BUILDERS
Site Address 121 N 9TH ST Unit: 101
Project NameVentive, LLC
Customer Number 
ePlanReviewYes
Description
(PLAZA 121 - STE 101) To create a 3,800 square foot office space 3,734 square foot 1st story and to perform interior tenant improvement work. This space is located on the 1st story (Northwest corner) of an existing 6 story building. Work is to include construction of nonbearing noncombustible partitions to create small lounge area, small conference room, office spaces, and interior finishes. All work shall be per the approved drawings. The fire sprinkler system shall comply with NFPA 13-2002 as reglulated by the Fire Department. This building is fire sprinklered in lieu of opening protection at the alley, rated corridors, basement enclosure, elevator lobbies, etc. It is also fire sprinklered because it has occupied floors more than 55 feet above the sidewalk and to allow one stairway to egress through a nonrated lobby on the 1st floor. RmH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 12/19/20181/8/2019 DONE
mailed 1-11-19
Second Notice 11/17/201812/14/2018 DONE
mailed 12-17
First Notice 10/25/201811/7/2018 DONE
mailed 11-12
BLD-Final10/12/201810/15/201810/15/2018APASS
DetailsBrandon Shaw
as late as possible and call half hour to meet // Russ ###-####
DOC - Permit Finaled10/15/201810/15/201810/15/2018PPASS
DetailsBrandon Shaw
Print Occupancy Form  10/15/2018 DONE
Permanent Occupancy  10/15/2018 DONE
FIRE-Final Inspection10/4/201810/5/201810/5/2018APASS
DetailsJim Page
Previously noted items have been corrected, final life fire safety inspection complete.

Amanda- Ask for Murray Phone #: ###-####
FIRE-Final Inspection9/27/20189/27/20189/27/2018PCANC
DetailsJim Page
Amanada Phone #: ###-####
BLD-Final6/19/20186/20/20186/20/2018ANR
DetailsDave Hannah
Murray Phone #: ###-#### still needs to fix all fire life saftey corrections
FIRE-Final Inspection6/19/20186/19/20186/19/2018PFAIL
DetailsJim Page
Fire alarm modifications will be required for space, conference room has no notification, horn strobe next to area where wall was build for small break area will need to be relocated to provide correct coverage. Exit signs/emergency lighting will need to be serviced or replaced, fire extinguisher will need to have annual inspection performed and tagged with a current inspection tag.

Provide correct address (Permit says 121 9th St Suite 101, number above north exterior door is 915 Idaho).

Murray Phone #: ###-####
BLD-Final6/15/20186/18/20186/18/2018ANR
DetailsDave Hannah
Amanda Phone #: ###-#### needs fire finals
FIRE-Final Inspection6/15/20186/15/20186/15/2018PFAIL
DetailsJim Page
Called point of contact for inspection request, left a message with a return phone number, went to tenant space and personnel inside didi not know who Amanda was, inspection request will need to be rescheduled.

Amanda Phone #: ###-####
Issue PAID IN FULL permit  3/19/2018 DONE
Inspection Record Card- Bld  3/19/2018 DONE
Print Occupancy Form  3/19/2018 DONE
Plan assigned to (RMH)2/13/20182/13/20182/15/2018 DONE
DetailsRon Hill
Ventive TI E Plan*
1st review completed  2/15/2018 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/15/2018 DONE
Permit Ready to Issue  2/15/2018 DONE
need
gc
rev cert of val
Routing - PLAN CHECK2/1/2018 2/15/2018 PASS
DetailsRon Hill
Plan assigned to (JG)2/1/20182/1/20182/13/2018 DEFR
DetailsJavier Guzman
2/21 L3 Ventive TI E Plan*
Routing - FIRE2/1/20182/1/20182/6/2018 PASS
DetailsErika Akin
Attached comments to case
Routing - Addressing2/1/2018 2/1/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS2/1/2018 2/1/2018 PASS
DetailsMorgan Webb
Intake Approval  2/1/2018 PASS
DetailsAdele J Schaffeld-Griffin
Javier accepted pre screen
Intake Approval  1/30/2018 FAIL
DetailsJavier Guzman
Please provide and upload the following:
• When the tenant use changes a Lighting compliance COMcheck signed and placed on the plans is required or provide on plans the reduced lighting allowances for the change in use
Intake Approval  1/25/2018 FAIL
DetailsJavier Guzman
Please provide and upload the following:
• When the tenant use changes a Lighting compliance COMcheck signed and placed on the plans is required or provide on plans the reduced lighting allowances for the change in use
Application received  1/24/2018 DONE
Application submitted via PDS Online on Jan 24 2018 10:03AM