BLD-Final | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Dave Hannah
|
|
|
as late as possible, call half hour before to meet // Hugo Phone #: ###-####
|
DOC - Permit Finaled | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 7/19/2018 | 7/19/2018 | 7/26/2018 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 7/18/2018 | 7/18/2018 | 7/18/2018 | | PEND |
Dave Hannah
|
|
|
|
Routing Walk-In (BLD) | 5/25/2018 | 5/25/2018 | 5/25/2018 | P | FAIL |
Josh Bogle
|
|
|
plan mod - needed engineering
|
Plan Modification Accepted | | | 5/25/2018 | | DONE |
|
|
|
wants make changes to the plans
|
Plan assigned to (JAB) Josh | 3/9/2018 | 3/9/2018 | 3/15/2018 | | PASS |
Josh Bogle
|
|
|
MODIFICATION done - should show ISS
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/15/2018 | | DONE |
Josh Bogle
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/15/2018 | | DONE |
|
|
|
as per JAB-plan mod so small that no plans were required
|
Plan Modification Accepted | | | 3/9/2018 | | DONE |
|
|
|
no plans submitted just wants to add a scope of work to permit-stucco-going over existing-sent to JAB
|
BLD-Energy code compliance | 3/6/2018 | 3/6/2018 | 3/6/2018 | P | PASS |
Dave Hannah
|
|
|
Bruno Phone #: ###-####
|
BLD-Framing/Rough-in | 3/2/2018 | 3/2/2018 | 3/5/2018 | P | PASS |
Dave Hannah
|
|
|
late PM - Hugo Phone #: ###-####
|
BLD-Energy code compliance | 2/20/2018 | 2/20/2018 | 2/20/2018 | P | NR |
Dave Hannah
|
|
|
Hugo Phone #: ###-#### needs other trades rough in sign offs
|
Issue PAID IN FULL permit | | | 1/29/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 1/26/2018 | 1/26/2018 | 1/26/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 1/26/2018 | | 1/26/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 1/26/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 1/26/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 1/26/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/26/2018 | | DONE |
Josh Bogle
|
|
|
as per JAB-no plan mod fees-only took a couple minutes
|
Permit Ready to Issue | | | 1/26/2018 | | DONE |
Christina Prado
|
|
|
Need;
GC form
Authorization Letter from Homeowner ok'ing husband/son to pull permits - met
|
Application received | | 1/26/2018 | | | |
|
|
|
|