BLD-Final | 7/17/2018 | 7/18/2018 | 7/18/2018 | A | PASS |
Dave Hannah
|
|
|
Call for access // Gabriel Phone #: ###-####
|
DOC - Permit Finaled | 7/18/2018 | 7/18/2018 | 7/18/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 4/30/2018 | 5/1/2018 | 5/1/2018 | A | PASS |
Dave Hannah
|
|
|
Gabriel Phone #: ###-####
|
BLD-Energy code compliance | 4/25/2018 | 4/26/2018 | 4/26/2018 | A | NR |
Jim Storey
|
|
|
Gabriel Phone #: ###-####
|
BLD-Framing/Rough-in | 4/19/2018 | 4/20/2018 | 4/20/2018 | A | PEND |
Dave Hannah
|
|
|
Gabriel Phone #: ###-#### ok to cover ext needs air seal on inside strape some header framing ok
|
Issue PAID IN FULL permit | | | 4/11/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 2/16/2018 | 2/16/2018 | 2/16/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/16/2018 | | 2/16/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/16/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/16/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/16/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 2/16/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 1/29/2018 | 1/29/2018 | 1/29/2018 | A | FAIL |
Rob Patrick
|
|
|
Need engineering for structural ceiling changes.
|
Routing - PLAN CHECK | 1/29/2018 | | 1/29/2018 | | FAIL |
Rob Patrick
|
|
|
|
1st review completed | | | 1/29/2018 | | FAIL |
Rob Patrick
|
|
|
|
Application received | | 1/29/2018 | | | |
|
|
|
|