Print Statement | | | 11/28/2018 | | DONE |
|
|
|
|
Third Notice | | 10/17/2018 | 11/7/2018 | | DONE |
|
|
|
mailed 11-12
|
Third Notice | | 9/15/2018 | 10/12/2018 | | DONE |
|
|
|
mailed 10-15-18
|
Second Notice | | 8/18/2018 | 9/10/2018 | | DONE |
|
|
|
mailed 9-11-18
|
First Notice | | 7/16/2018 | 8/8/2018 | | DONE |
|
|
|
mailed 8-10-18
|
BLD-Final | 7/6/2018 | 7/6/2018 | 7/6/2018 | P | PASS |
Dave Hannah
|
|
|
Please call ahead for access - Alan Phone #: ###-####
|
Permanent Occupancy | | | 7/6/2018 | | DONE |
|
|
|
|
BLD-Final | 6/29/2018 | 7/2/2018 | 7/2/2018 | P | PEND |
Dave Hannah
|
|
|
Allan Phone #: 208-###-#### ok for temp occ
|
FIRE-Final Inspection | 6/29/2018 | 7/2/2018 | 7/2/2018 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work complete.
Allan Phone #: 208-###-####
|
Temporary Occupancy | 7/2/2018 | 9/30/2018 | 7/2/2018 | | DONE |
Tisha Gallop
|
|
|
Permanent occupancy pending Structural approval.
|
FIRE-Final Inspection | 6/27/2018 | 6/28/2018 | 6/28/2018 | A | FAIL |
Jim Page
|
|
|
Tenant space is not ready for life fire safety inspection.
Allen Phone #: ###-####
|
Print Occupancy Form | | | 6/27/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/25/2018 | | DONE |
|
|
|
deferred submittal no fees due
|
CHANGE STATUS TO (ISS) | | | 6/25/2018 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 4/12/2018 | 4/12/2018 | 6/23/2018 | | PASS |
Carl D Madsen
|
|
|
TO UPLOAD CALS. DEF.SUM
|
Routing - PLAN CHECK | 6/23/2018 | | 6/23/2018 | | PASS |
Carl D Madsen
|
|
|
No fees required for a deferred submittal.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/23/2018 | | DONE |
|
|
|
|
BLD-Conference | 6/19/2018 | 6/22/2018 | 6/22/2018 | A | DONE |
Mike Jordan
|
|
|
Alan Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/14/2018 | 5/14/2018 | 5/14/2018 | P | PASS |
Dave Hannah
|
|
|
Garrett Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/10/2018 | 5/11/2018 | 5/11/2018 | A | PART |
Dave Hannah
|
|
|
Allen Phone #: ###-#### south half ok
|
BLD-Ceiling Grid Inspection | 5/10/2018 | 5/10/2018 | 5/10/2018 | P | NR |
Dave Hannah
|
|
|
Allen Phone #: ###-####
|
Plan Modification Accepted | | | 4/12/2018 | | |
|
|
|
This is not considered a plan modificatio but is a deferred submittal with no fees required for the defeered submittal of guardrail engineering. CDM
|
BLD-Other | 4/5/2018 | 4/6/2018 | 4/6/2018 | A | PASS |
Dave Hannah
|
|
|
Alan oakland--above ceiling insp, call for access Phone #: ###-####
|
BLD-Framing/Rough-in | 3/29/2018 | 3/30/2018 | 3/30/2018 | A | PASS |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/29/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/29/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/23/2018 | | 3/28/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/28/2018 | | DONE |
|
|
|
Need
GC Form -met
Revised Cert of Value -met
(close out early start permit Bld18-00794 when this permit is issued)
|
Plan assigned to (CDM) | 3/3/2018 | 3/3/2018 | 3/7/2018 | | PASS |
Carl D Madsen
|
|
|
1st comp Stoel Rives 1st comp
|
Route to Impact Fee Review | 3/3/2018 | 3/6/2018 | 3/5/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (JG) | 2/15/2018 | 2/15/2018 | 3/3/2018 | | DEFR |
Javier Guzman
|
|
|
2/28 L2 Stoel Rives 19th floor remodel ePlan
|
Routing - PLAN CHECK | 2/15/2018 | | 3/3/2018 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 3/3/2018 | | FAIL |
|
|
|
|
Routing - FIRE | 2/15/2018 | 2/15/2018 | 2/26/2018 | | PASS |
Scott Arellano
|
|
|
Attached comments to case
|
Routing - MECHANICAL | 2/15/2018 | | 2/16/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 2/15/2018 | | 2/15/2018 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
See red line notes
|
Routing - Addressing | 2/15/2018 | | 2/15/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/15/2018 | | 2/15/2018 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 2/15/2018 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 2/8/2018 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following:
1. Drawings sheets need to be individually uploaded.
|
Application received | | | 1/29/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 29 2018 12:11PM
|