BLD-Final | 4/18/2018 | 4/18/2018 | 4/18/2018 | P | PASS |
Tony Young
|
|
|
plans are on site // Matt Phone #: ###-####
|
DOC - Permit Finaled | 4/18/2018 | 4/18/2018 | 4/18/2018 | P | PASS |
Tony Young
|
|
|
|
Zoning Approval | 4/16/2018 | 4/16/2018 | 4/16/2018 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Framing/Rough-in | 3/19/2018 | 3/19/2018 | 3/19/2018 | P | PASS |
Dave Hannah
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 2/28/2018 | 2/28/2018 | 3/1/2018 | P | PASS |
Tony Young
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 2/27/2018 | 2/28/2018 | 2/28/2018 | A | NR |
Tony Young
|
|
|
Matt Phone #: ###-####,, needs rebar per plan/engineering
|
Routing Walk-In (BLD) | 2/20/2018 | 2/20/2018 | 2/20/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/20/2018 | | 2/20/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/20/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/20/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/20/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 2/20/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/20/2018 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 1/30/2018 | | 2/20/2018 | | DONE |
Michael Hanson
|
|
|
02/05 Patio cover L2 Paper - 1st review completed. Patio is to be supported by metal post with in-field welding required at post base and beam connection requiring special inspection for completion and structural engineering for uplift on large patio. MDH
|
Routing Walk-In (Zoning) | 1/30/2018 | 1/30/2018 | 1/30/2018 | A | DONE |
Ted Vanegas
|
|
|
|
Routing Walk-In (Zoning) | 1/30/2018 | 1/30/2018 | 1/30/2018 | A | PASS |
Ted Vanegas
|
|
|
|
Routing Walk-In (BLD) | 1/30/2018 | 1/30/2018 | 1/30/2018 | A | FAIL |
Michael Hanson
|
|
|
Patio is to be supported by metal post with in-field welding required at post base and beam connection requiring special inspection for completion and structural engineering for uplift on large patio. MDH
|
Plan Reviewer's activity | | | 1/30/2018 | | FAIL |
Michael Hanson
|
|
|
Patio is to be supported by metal post with in-field welding required at post base and beam connection requiring special inspection for completion and structural engineering for uplift on large patio. MDH
|
1st review completed | | | 1/30/2018 | | FAIL |
Michael Hanson
|
|
|
Patio is to be supported by metal post with in-field welding required at post base and beam connection requiring special inspection for completion and structural engineering for uplift on large patio. MDH
|
Routing - PLAN CHECK | 1/30/2018 | | 1/30/2018 | | FAIL |
Michael Hanson
|
|
|
Patio is to be supported by metal post with in-field welding required at post base and beam connection requiring special inspection for completion and structural engineering for uplift on large patio. MDH
|
Application received | | 1/30/2018 | | | |
|
|
|
|