Permit Information
Permit NumberBLD18-00318
StatusFinaled
Name CONNER CONSTRUCTION LLC
Site Address 3898 N SANDPOINT WAY
Project NameClemens Residence
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 3,335 sq. ft., two story (first story 2,545 sq. ft., second story 790 sq. ft.) single family dwelling with 2 bedrooms, 2 and a half bathrooms, approximately 62 sq. ft. of covered patio/porch and a 910 sq. ft. attached garage per the approved plans, notations, local codes & ordinances. W.U.I. hillside lot Class A Roof required. 2012 Prescriptive Energy Table. A-1 zoning and setbacks per planning. **JAB**
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/27/201811/27/201811/27/2018PPASS
DetailsTony Young
Ready for final Phone #: ###-#### Inspection requested via web by Clayton Conner
DOC - Permit Finaled11/27/201811/27/201811/27/2018PPASS
DetailsTony Young
BLD-Final11/26/201811/27/201811/27/2018APASS
DetailsTony Young
clayton Phone #: ###-####
BLD-Blower Door Test Results11/26/201811/27/201811/27/2018APASS
DetailsTony Young
clayton Phone #: ###-####// 3.2
PubWorks Occupancy Approval11/27/201811/27/201811/27/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Final11/26/201811/26/201811/26/2018PFAIL
DetailsTony Young
clayton Phone #: ###-####,, needs.. address, hillside from public works,, tempered glass in master bath,, mechanical permits passed,, fire caulking
BLD-Other7/5/20187/6/20187/6/2018PPASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Energy code compliance6/21/20186/21/20186/21/2018PPART
DetailsTony Young
Caulk and seal inspection. Phone #: ###-#### Inspection requested via web by Clayton Conner,, need to seal low voltage wires and other open holes in plates
BLD-Framing/Rough-in6/21/20186/21/20186/21/2018PPART
DetailsTony Young
Caulk and seal inspection. Phone #: ###-#### Inspection requested via web by Clayton Conner,, c/n in paint,, ok to insulate
Plan Modification Accepted  6/13/2018 DONE
New manual j report
Routing - MECHANICAL6/13/2018 6/13/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Other5/23/20185/24/20185/24/2018APASS
DetailsDave Hannah
Clayton Conner - Soffit inspection. Sheetrock is up on the overhangs. Phone #: ###-#### Inspection requested via web by Clayton Conner
BLD-Wall Bracing5/22/20185/23/20185/23/2018APASS
DetailsDave Hannah
Blaten Phone #: ###-####
BLD-Foundation3/12/20183/12/20183/12/2018PPART
DetailsTony Young
Cal Phone #: ###-####,, work in progress,, ok
BLD-Footing3/8/20183/8/20183/8/2018PPASS
DetailsTony Young
Cal Phone #: ###-####
PubWorks Subgrade Approval3/8/20183/8/20183/8/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Issue PAID IN FULL permit  2/22/2018 DONE
Inspection Record Card- Bld  2/22/2018 DONE
OVERRIDE  2/21/2018  
Plan assigned to (JAB) Josh2/12/20182/12/20182/21/2018 PASS
DetailsJosh Bogle
1st done - corrections required
PLANS/APPL TAKEN TO FRONT DESK  2/21/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  2/21/2018 DONE
Routing PW Grading-Hillside2/15/2018 2/20/2018 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
Routing - PLAN CHECK2/15/2018 2/15/2018 PASS
DetailsJosh Bogle
Plan assigned to (RDP)1/31/20181/31/20182/12/2018 DEFR
DetailsRob Patrick
2/16 sfd L2 ePlan
Routing - PLAN CHECK1/31/2018 2/12/2018 FAIL
DetailsJosh Bogle
1st review completed  2/12/2018 FAIL
DetailsJosh Bogle
Routing PW Grading-Hillside1/31/2018 2/5/2018 FAIL
DetailsMelissa Jannusch
See changemarks in ePlan.

Please provide conclusions and recommendations regarding the adequacy of the site to be developed as proposed in the construction and grading plans.
Routing - MECHANICAL1/31/2018 2/2/2018 PASS
DetailsTroy James
Routing - Erosion and Sediment1/31/2018 2/2/2018 PASS
DetailsMichael Zawacki
Route to Impact Fee Review1/31/20182/3/20182/1/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - FIRE1/31/20181/31/20182/1/2018 PASS
DetailsErika Akin
Plans were reviewed for FD access, availability of hydrants and defensible space. All portions of this structure shall comply with the provisions of BMC 7-01-69 section 4920 for defensible space and are subject to Fire Department inspection.
Plans ACCEPTED BY PLAN TECH  1/31/2018 DONE
Recd Pcfee & Taken To Pln CK  1/31/2018 DONE
Intake Approval  1/31/2018 PASS
Routing - PLANNING1/31/2018 1/31/2018 PASS
DetailsJeff Lowe
Routing - Addressing1/31/2018 1/31/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/31/2018 1/31/2018 PASS
DetailsRachael Beierle
Application received  1/30/2018 DONE
Application submitted via PDS Online on Jan 30 2018 12:57PM