BLD-Final | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | PASS |
Tony Young
|
|
|
Ready for final Phone #: ###-#### Inspection requested via web by Clayton Conner
|
DOC - Permit Finaled | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 11/26/2018 | 11/27/2018 | 11/27/2018 | A | PASS |
Tony Young
|
|
|
clayton Phone #: ###-####
|
BLD-Blower Door Test Results | 11/26/2018 | 11/27/2018 | 11/27/2018 | A | PASS |
Tony Young
|
|
|
clayton Phone #: ###-####// 3.2
|
PubWorks Occupancy Approval | 11/27/2018 | 11/27/2018 | 11/27/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 11/26/2018 | 11/26/2018 | 11/26/2018 | P | FAIL |
Tony Young
|
|
|
clayton Phone #: ###-####,, needs.. address, hillside from public works,, tempered glass in master bath,, mechanical permits passed,, fire caulking
|
BLD-Other | 7/5/2018 | 7/6/2018 | 7/6/2018 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Energy code compliance | 6/21/2018 | 6/21/2018 | 6/21/2018 | P | PART |
Tony Young
|
|
|
Caulk and seal inspection. Phone #: ###-#### Inspection requested via web by Clayton Conner,, need to seal low voltage wires and other open holes in plates
|
BLD-Framing/Rough-in | 6/21/2018 | 6/21/2018 | 6/21/2018 | P | PART |
Tony Young
|
|
|
Caulk and seal inspection. Phone #: ###-#### Inspection requested via web by Clayton Conner,, c/n in paint,, ok to insulate
|
Plan Modification Accepted | | | 6/13/2018 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 6/13/2018 | | 6/13/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Other | 5/23/2018 | 5/24/2018 | 5/24/2018 | A | PASS |
Dave Hannah
|
|
|
Clayton Conner - Soffit inspection. Sheetrock is up on the overhangs. Phone #: ###-#### Inspection requested via web by Clayton Conner
|
BLD-Wall Bracing | 5/22/2018 | 5/23/2018 | 5/23/2018 | A | PASS |
Dave Hannah
|
|
|
Blaten Phone #: ###-####
|
BLD-Foundation | 3/12/2018 | 3/12/2018 | 3/12/2018 | P | PART |
Tony Young
|
|
|
Cal Phone #: ###-####,, work in progress,, ok
|
BLD-Footing | 3/8/2018 | 3/8/2018 | 3/8/2018 | P | PASS |
Tony Young
|
|
|
Cal Phone #: ###-####
|
PubWorks Subgrade Approval | 3/8/2018 | 3/8/2018 | 3/8/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 2/22/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/22/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 2/21/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 2/12/2018 | 2/12/2018 | 2/21/2018 | | PASS |
Josh Bogle
|
|
|
1st done - corrections required
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/21/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 2/21/2018 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 2/15/2018 | | 2/20/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - PLAN CHECK | 2/15/2018 | | 2/15/2018 | | PASS |
Josh Bogle
|
|
|
|
Plan assigned to (RDP) | 1/31/2018 | 1/31/2018 | 2/12/2018 | | DEFR |
Rob Patrick
|
|
|
2/16 sfd L2 ePlan
|
Routing - PLAN CHECK | 1/31/2018 | | 2/12/2018 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 2/12/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing PW Grading-Hillside | 1/31/2018 | | 2/5/2018 | | FAIL |
Melissa Jannusch
|
|
|
See changemarks in ePlan.
Please provide conclusions and recommendations regarding the adequacy of the site to be developed as proposed in the construction and grading plans.
|
Routing - MECHANICAL | 1/31/2018 | | 2/2/2018 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 1/31/2018 | | 2/2/2018 | | PASS |
Michael Zawacki
|
|
|
|
Route to Impact Fee Review | 1/31/2018 | 2/3/2018 | 2/1/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 1/31/2018 | 1/31/2018 | 2/1/2018 | | PASS |
Erika Akin
|
|
|
Plans were reviewed for FD access, availability of hydrants and defensible space. All portions of this structure shall comply with the provisions of BMC 7-01-69 section 4920 for defensible space and are subject to Fire Department inspection.
|
Plans ACCEPTED BY PLAN TECH | | | 1/31/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/31/2018 | | DONE |
|
|
|
|
Intake Approval | | | 1/31/2018 | | PASS |
|
|
|
|
Routing - PLANNING | 1/31/2018 | | 1/31/2018 | | PASS |
Jeff Lowe
|
|
|
|
Routing - Addressing | 1/31/2018 | | 1/31/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/31/2018 | | 1/31/2018 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | | 1/30/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 30 2018 12:57PM
|