Information based on query as of Saturday, July 27, 2024.
Permit Information
Permit NumberBLD18-00337
StatusFinaled
Name EKC INC
Site Address 12754 W LASALLE ST
Project NameSchweitzer Engineering Lab
Customer Number 
ePlanReviewYes
Description
(SCHWEITZER ENGINEERING LABORATORIES) This building is fire sprinklered for area increase. Permit is to remodel an existing 16,365 sq. ft. business building. Approval is contingent upon adhering to the approved plans on file and plan review report. Work to include: removal of select interior nonbearing walls to create open office areas, removal of select door/door frames and relocate select doors, removal of (1) shower in the men’s restroom, removal of select toilet partition at the men’s restroom, removal of select soffit ceiling, removal of select suspended acoustic ceiling, removal of select light fixtures, construction of interior non-bearing walls to create a break room a storage room, a lab room and a wall at the men’s restroom, extend existing conference and training room walls up to the deck above, infill select interior wall openings, horizontal sliding door at the breakroom, select new toilet partitions at the men’s restroom, select new suspended acoustic ceilings, new and relocated light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 6/21/20187/10/2018 DONE
This permit finaled on the web by Charlene Meadows
First Notice 5/25/20186/11/2018 DONE
mailed 6-12
Print Occupancy Form  5/15/2018 DONE
Permanent Occupancy  5/15/2018 DONE
BLD-Final5/14/20185/14/20185/14/2018PPASS
DetailsBrandon Shaw
dale Phone #: ###-####
DOC - Permit Finaled5/14/20185/14/20185/14/2018PPASS
DetailsBrandon Shaw
BLD-Final5/11/20185/11/20185/11/2018PPART
DetailsJim Sly
Dale Phone #: ###-####
OK for Temp. Occ. OK for Perm Occ. when Electrical signs Perm.
Temporary Occupancy5/11/20188/9/20185/11/2018 DONE
DetailsTiffany Carson-Herker
FIRE-Final Inspection5/8/20185/9/20185/9/2018PPASS
DetailsTroy Cobbley
Life safety passed

Dale Phone #: ###-####
FIRE-Final Inspection5/7/20185/8/20185/8/2018AFAIL
DetailsTroy Cobbley
Provide the exit signs as per the city approved plans. Missing four.

Dale EKC call 30 mins before for access Phone #: ###-####
BLD-Ceiling Grid Inspection4/20/20184/23/20184/23/2018APASS
DetailsJim Sly
Dale Phone #: ###-####
BLD-Framing/Rough-in3/22/20183/23/20183/23/2018APASS
DetailsJim Sly
Dale Phone #: ###-####
Issue PAID IN FULL permit  3/2/2018 DONE
Print Occupancy Form  3/2/2018 DONE
Route to Impact Fee Review2/17/20182/20/20182/20/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Permit Ready to Issue  2/20/2018 DONE
Need
GC Form -met
Revised Cert of Value - met
Plan assigned to (JG)2/5/20182/5/20182/17/2018 PASS
DetailsJavier Guzman
2/16 L2 SEL Boise Office Remodel ePlan
Routing - PLAN CHECK2/5/2018 2/17/2018 PASS
DetailsJavier Guzman
1st review completed  2/17/2018 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  2/17/2018 DONE
Routing - FIRE2/5/20182/5/20182/7/2018 PASS
DetailsScott Arellano
Attached comments to case
Intake Approval  2/5/2018 PASS
DetailsJavier Guzman
Routing - Addressing2/5/2018 2/5/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS2/5/2018 2/5/2018 PASS
DetailsMorgan Webb
Application received  1/31/2018 DONE
Application submitted via PDS Online on Jan 31 2018 2:57PM