BLD-Aging Inspection | 9/12/2018 | 9/12/2018 | 9/20/2018 | | CANC |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 5/1/2018 | 5/1/2018 | 5/1/2018 | P | PART |
Jim Sly
|
|
|
Phone #: 2088592435 >> Inspection requested via mobile web by Tami Englert Framing OK.....but need Electr R/I approval.
|
BLD-Wall Bracing | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: 2088592435 >> Inspection requested via mobile web by Tami Englert
|
BLD-Foundation | 3/5/2018 | 3/6/2018 | 3/6/2018 | A | PASS |
Jim Sly
|
|
|
Dan Phone #: ###-####
|
BLD-Footing | 2/28/2018 | 3/1/2018 | 3/1/2018 | P | PASS |
Jim Sly
|
|
|
Dan Phone #: ###-####
|
OVERRIDE | | | 2/6/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 2/5/2018 | 2/5/2018 | 2/6/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 2/6/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/6/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/6/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 2/6/2018 | | DONE |
|
|
|
|
Telephone call | | | 2/6/2018 | | DONE |
|
|
|
voice mail box full. sent email, see documents
|
Telephone call | | | 2/6/2018 | | DONE |
|
|
|
Tamara called. I told her permit ready and fee due
|
Issue PAID IN FULL permit | | | 2/6/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/5/2018 | | 2/6/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Okay for homeowner RP
|
Routing - PLAN CHECK | 2/5/2018 | | 2/6/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 2/5/2018 | 2/5/2018 | 2/5/2018 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 2/5/2018 | 2/5/2018 | 2/5/2018 | A | PASS |
Josh Bogle
|
|
|
took in as Level 2
|
Routing PW Grading-Hillside | 2/5/2018 | | 2/5/2018 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
|
Meeting | | | 2/1/2018 | | DONE |
|
|
|
Per Jason Taylor Category I. Need footing distance to slope detail on plans. Foundation plan/detail needs stamped by engineer. When customer comes back in still need hillside to sign off.
|
Application received | | 2/1/2018 | | | |
|
|
|
|