Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-00359
StatusIssued
Name BADE BROTHERS BUILDING COMPANY LLC
Site Address 1109 N ARTHUR LN
Project NameWedgewood Manor Carports
Customer Number 
ePlanReviewYes
Description
(WEDGEWOOD MANOR APTS. CARPORTS) Permit for the construction of 1 new steel 13-bay carport 18'x119.5' approximately 2151 sqft and 1 new steel van accessible carport 18'x32' approximately 576 sq ft. Work to include footings, columns, roof structure, and signage. These carports are not fire sprinklered. All work to comply with applicable codes and attached engineeering. **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection4/19/20194/19/20194/22/2019 PEND
DetailsTony Young
BLD-Footing12/5/201812/6/201812/6/2018APASS
DetailsTony Young
Ben Phone #: ###-####,, 7 carport holes,, ok
(F) Reprint permit  7/20/2018 DONE
Telephone call  7/20/2018 DONE
send email to Ben again asking him to sign the permits and send back
Issue PAID IN FULL permit  7/18/2018 DONE
Print Occupancy Form  7/18/2018 DONE
Inspection Record Card- Bld  7/18/2018 DONE
Print Occupancy Form  7/18/2018 DONE
Expiration Notice7/2/20187/24/20187/2/2018 DONE
DetailsBrittany Hill
OVERRIDE  5/23/2018  
Routing - PLAN CHECK4/19/2018 5/23/2018 PASS
DetailsMichael Hanson
Routing - Design Review5/23/2018 5/23/2018 PASS
DetailsKayCee Babb
Approval for site modifications received through Design Review.
PLANS/APPL TAKEN TO FRONT DESK  5/23/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  5/23/2018 DONE
DetailsChristina Prado
Need- all met
GC Form
Revised Certificate of Value

ben@badebrothers.com
Plan assigned to (M_H)3/16/2018 5/23/2018 DONE
DetailsMichael Hanson
04/27 Wedgewood Manor Carports New 1st review completed - See comments from Design Review and Public Works. MDH
Routing - Design Review5/8/2018 5/8/2018 FAIL
DetailsKayCee Babb
Design Review was not sent updated materials. Further information is required for review.
Routing PW Solid Waste5/8/2018 5/8/2018 PASS
DetailsEvan Carpenter
Route to Impact Fee Review4/19/20184/22/20184/20/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK3/16/2018 4/19/2018 FAIL
DetailsMichael Hanson
See comments from Design Review and Public Works. MDH
Routing Off Site - STRUCTURAL3/16/2018 4/19/2018 PASS
DetailsMichael Hanson
Per Dave Haugland
Plan Reviewer's activity  4/19/2018 DONE
DetailsMichael Hanson
1st review completed  4/19/2018 FAIL
DetailsMichael Hanson
See comments from Design Review and Public Works. MDH
Routing PW Street Lights3/19/2018 3/26/2018 PASS
DetailsTom Marshall
Routing - FIRE3/16/20183/16/20183/20/2018 PASS
DetailsScott Arellano
No comments attached. PDS Fire Inspector to field verify no encroachment into FD access.
Routing PW Solid Waste3/19/2018 3/20/2018 FAIL
DetailsEvan Carpenter
The solid waste enclosure must have at least 12 feet of unobstructed clearance between gate posts (measured from the innermost points).
Routing PW Drainage3/19/2018 3/19/2018 PASS
DetailsBrian Murphy
Routing - Addressing3/16/2018 3/19/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS3/16/2018 3/19/2018 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment3/16/2018 3/19/2018 PASS
DetailsMichael Zawacki
Waiver approved. Con05-00145 is for Ryan Bade, has been added as RP.
Routing - PLANNING3/16/2018 3/16/2018 PASS
DetailsLeon Letson
Comply with DR requirements per CZC18-00011.
Routing - Design Review3/16/2018 3/16/2018 FAIL
DetailsKayCee Babb
Trash enclosure not approved by Design Review. Applicant must provide plans and written approval from Public Works for location.
Intake Approval  3/16/2018 PASS
Application received  2/2/2018 DONE
Application submitted via PDS Online on Feb 2 2018 9:13AM
Intake Approval  2/2/2018 FAIL