BLD-Final | 3/30/2020 | 3/31/2020 | 3/31/2020 | A | PASS |
Dave Hannah
|
|
|
Hello, please note that the inspector can gain access through the garage key pad the code is 5296 enter. Also the approved plans are in the top drawer on the right side of the kitchen range. Thank You, Cameron Jayo Phone #: ###-#### Inspection requested via web by Cameron Jayo
|
DOC - Permit Finaled | 3/31/2020 | 3/31/2020 | 3/31/2020 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 3/3/2020 | 3/3/2020 | 3/3/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Aging Inspection | 11/29/2019 | 11/29/2019 | 12/2/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 11/28/2019 | 11/28/2019 | 12/2/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Energy code compliance | 7/12/2019 | 7/17/2019 | 7/17/2019 | P | PASS |
Brandon Shaw
|
|
|
Cameron Phone #: ###-####
|
BLD-Framing/Rough-in | 7/3/2019 | 7/8/2019 | 7/8/2019 | A | PART |
Dave Hannah
|
|
|
Camerpn Phone #: ###-#### c/n on site ok to insulate
|
BLD-Framing/Rough-in | 6/27/2019 | 7/2/2019 | 7/2/2019 | A | NR |
Tony Young
|
|
|
Approved plans are by the Fireplace, please call with any questions.
Than You,
Cameron Jayo Phone #: ###-#### Inspection requested via web by Cameron Jayo
|
BLD-Framing/Rough-in | 6/26/2019 | 6/27/2019 | 6/27/2019 | P | PART |
Tony Young
|
|
|
Approved plans are by the Fireplace, please call with any questions.
Than You,
Cameron Jayo Phone #: ###-#### Inspection requested via web by Cameron Jayo,, conf walk through only
|
Routing - MECHANICAL | 5/17/2019 | | 5/17/2019 | | PASS |
Troy James
|
|
|
New manual j report
|
BLD-Other | 5/9/2019 | 5/10/2019 | 5/10/2019 | A | PASS |
Tony Young
|
|
|
Cameron- fire rock on faucet Phone #: ###-####
|
BLD-Wall Bracing | 4/23/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Tony Young
|
|
|
Inspection requested via web by Cameron Jayo
|
BLD-Wall Bracing | 4/22/2019 | 4/23/2019 | 4/23/2019 | A | NR |
Tony Young
|
|
|
Approved plans are by the fireplace. Thanks Inspection requested via web by Cameron Jayo,, correction notice posted,, need to nail per plan
|
BLD-Wall Bracing | 4/16/2019 | 4/18/2019 | 4/17/2019 | A | CANC |
Tony Young
|
|
|
Approved plans are by the Fireplace. Thank You Phone #: ###-#### >> Inspection requested via web by Cameron Jayo Inspection cancelled from web by: Cameron Jayo
|
BLD-Aging Inspection | 3/29/2019 | 3/29/2019 | 3/29/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 3/28/2019 | 3/28/2019 | 3/29/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Other | 12/19/2018 | 12/19/2018 | 12/19/2018 | P | PART |
Jim Storey
|
|
|
1 please- Bill Phone #: ###-#### vapor barrior ok for under slab// no exterior wall water barrior befor back fil
|
BLD-Foundation | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | PASS |
Tony Young
|
|
|
Bill Phone #: ###-####,, basement and retaining walls ok
|
BLD-Footing | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PASS |
Tony Young
|
|
|
Bill Phone #: ###-####,, slab footings,, walls ok also
|
BLD-Footing | 11/1/2018 | 11/2/2018 | 11/2/2018 | A | PASS |
Tony Young
|
|
|
Bill ###-####, late am
|
BLD-Footing | 11/1/2018 | 11/1/2018 | 11/1/2018 | P | NR |
Tony Young
|
|
|
Bill ###-####,,
|
PubWorks Subgrade Approval | 11/1/2018 | 11/1/2018 | 11/1/2018 | | DONE |
Melissa Jannusch
|
|
|
ALL HOUSE AND EAST RETAINING WALL. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. A footing inspection may now be scheduled with the Building Department.
|
OVERRIDE | | | 10/15/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 10/1/2018 | 10/1/2018 | 10/15/2018 | | PASS |
Josh Bogle
|
|
|
Plan Mod - 1. Floor elevations (main, basement, garage) are raised 1.20’.
2. Retaining wall at driveway courtyard is taller. The wall is outside the 5’ setback.
3. Curb and railing at the driveway retaining wall are extended towards the cul de sac.
4. Area drain at the driveway is moved to end of curb.
5. Driveway spot elevations are revised to slope towards the relocated area drain.
6. Spot elevations and grading at the back yard are revised to fit with the new basement floor elevations.
7. Minor modification to the architectural floor plan at the master bedroom no the northeast corner.
|
Inspection Record Card- Bld | | | 10/15/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/15/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 10/2/2018 | | 10/15/2018 | | PASS |
Susan Riggs
|
|
|
|
Routing - PLAN CHECK | 10/15/2018 | | 10/15/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/15/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 10/15/2018 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE (plan mod fees due)
|
Routing PW Grading-Hillside | 10/12/2018 | | 10/12/2018 | | PASS |
Melissa Jannusch
|
|
|
PASSED PLAN MOD FOR WALL. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - PLAN CHECK | 10/2/2018 | | 10/8/2018 | | FAIL |
Josh Bogle
|
|
|
need updated retaining walls calcs
|
Routing PW Grading-Hillside | 10/2/2018 | | 10/3/2018 | | FAIL |
Melissa Jannusch
|
|
|
Please provide revised wall calculations
|
PubWorks Subgrade Approval | 10/2/2018 | 10/2/2018 | 10/2/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Routing - PUBLIC WORKS | 10/2/2018 | | 10/2/2018 | | PASS |
Morgan Webb
|
|
|
|
Plan Modification Accepted | | | 10/1/2018 | | DONE |
|
|
|
Plan Mod:
1. Floor elevations (main, basement, garage) are raised 1.20’.
2. Retaining wall at driveway courtyard is taller. The wall is outside the 5’ setback.
3. Curb and railing at the driveway retaining wall are extended towards the cul de sac.
4. Area drain at the driveway is moved to end of curb.
5. Driveway spot elevations are revised to slope towards the relocated area drain.
6. Spot elevations and grading at the back yard are revised to fit with the new basement floor elevations.
7. Minor modification to the architectural floor plan at the master bedroom no the northeast corner.
|
Issue PAID IN FULL permit | | | 8/29/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/29/2018 | | DONE |
|
|
|
|
Telephone call | | | 8/28/2018 | | DONE |
|
|
|
Left a message for Cameron recommending he send in a request for a 180 extension if not ready to pick up permit this week (24 days past)
|
OVERRIDE | | | 8/22/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 8/22/2018 | | DONE |
|
|
|
All requirements met
|
Plan assigned to (JAB) Josh | 7/6/2018 | 7/6/2018 | 8/21/2018 | | PASS |
Josh Bogle
|
|
|
07/06 sfd Hillside - 1st done - 2nd cycle
|
Routing - PLAN CHECK | 8/21/2018 | | 8/21/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2018 | | DONE |
Josh Bogle
|
|
|
|
Plan Reviewer's activity | | | 8/15/2018 | | DONE |
Josh Bogle
|
|
|
review complete task
|
Telephone call | | | 8/15/2018 | | DONE |
|
|
|
Cameron sent an email asking where his permit was in the system-looked it up and called him (his email kept coming back undeliverable) and told him where it was at-left message
|
Routing PW Grading-Hillside | 8/6/2018 | | 8/13/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - PLAN CHECK | 8/6/2018 | | 8/8/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing PW Grading-Hillside | 7/24/2018 | | 7/31/2018 | | FAIL |
Melissa Jannusch
|
|
|
Cameron,
The following revisions are needed for BLD18-00377 768 E ORION DR 83702 before it can pass hillside grading review.
Please provide the calculation page for the retaining wall engineering.
Provide the site specific geotechnical report for the project not the subdivision report.
These revision requests can also be found in ePlan review.
Best,
Melissa
|
Routing - PLAN CHECK | 7/24/2018 | | 7/30/2018 | | FAIL |
Josh Bogle
|
|
|
|
Plan assigned to (RDP) | 6/19/2018 | 6/19/2018 | 7/6/2018 | | DEFR |
Rob Patrick
|
|
|
7/6 sfd L2 ePlan
|
Routing - PLAN CHECK | 6/19/2018 | | 7/6/2018 | | FAIL |
Josh Bogle
|
|
|
missing details: WUI, energy code, attic venting, R302 fire, R308
|
1st review completed | | | 7/6/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 6/19/2018 | | 6/27/2018 | | PASS |
Susan Riggs
|
|
|
|
Routing - MECHANICAL | 6/19/2018 | | 6/22/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Routing PW Grading-Hillside | 6/20/2018 | | 6/21/2018 | | FAIL |
Melissa Jannusch
|
|
|
Needs geotechnical engineering report and retaining wall calculations
|
Route to Impact Fee Review | 6/19/2018 | 6/22/2018 | 6/20/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 6/19/2018 | 6/19/2018 | 6/20/2018 | | PASS |
Tim Frost
|
|
|
|
Routing - Addressing | 6/19/2018 | | 6/20/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/19/2018 | | 6/20/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 6/19/2018 | | 6/20/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills home, site prep inspection required.
|
Intake Approval | | | 6/19/2018 | | FAIL |
|
|
|
Still needing 2015 on energy code. see email in documents
|
Plans ACCEPTED BY PLAN TECH | | | 6/19/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/19/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/19/2018 | | PASS |
|
|
|
|
Intake Approval | | | 6/15/2018 | | FAIL |
|
|
|
****deleted everything ahd cameron reuploaded plans and documents**** 6-15-18 Please rotate plans so they are landscape facing and with the same name (Version 2: V2) so that we can go in and delete the plans that are not needed. Also please upload all documents, some in the drawings folder, to the documents folder. Also the Soils and Geotechnical report and P&Z letter are still missing.
|
Intake Approval | | | 2/20/2018 | | FAIL |
|
|
|
Cat ll (need P&Z letter before submitting BLD)
Plans need to be lanscape, REScheck or prescriptive, soils and geotechnical report.
Permit for the construction of a new 4,258 sq. ft., two story (first story 2,440 sq. ft., below grade 1,818 sq. ft.) single family dwelling with 5 bedrooms, 4 and a half bathrooms, approximately 574 sq. ft. of covered patio/porch and an 880 sq. ft. attached garage per the approved plans and any notations. A-1 zoning and setbacks per planning
|
Application received | | | 2/4/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 4 2018 1:35PM
|