BLD-Final | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | PASS |
Brandon Shaw
|
|
|
Eric Phone #: ###-####
|
DOC - Permit Finaled | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 2.8
|
BLD-Final | 4/10/2019 | 4/10/2019 | 4/10/2019 | P | NR |
Brandon Shaw
|
|
|
Need Fire final... No other issues...
|
PubWorks Occupancy Approval | 4/10/2019 | 4/10/2019 | 4/10/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Aging Inspection | 2/8/2019 | 2/8/2019 | 2/8/2019 | | DEFR |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Aging Inspection | 2/7/2019 | 2/7/2019 | 2/7/2019 | | DONE |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Energy code compliance | 9/26/2018 | 9/26/2018 | 9/26/2018 | P | PASS |
Brandon Shaw
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 9/26/2018 | 9/27/2018 | 9/26/2018 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 9/13/2018 | 9/13/2018 | 9/13/2018 | P | FAIL |
Brandon Shaw
|
|
|
Need Sprinkler rough in...
No Issues with framing... No cover at this time...
|
CHANGE STATUS TO (ISS) | | | 9/11/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/11/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 9/10/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 8/29/2018 | 8/29/2018 | 9/10/2018 | | DONE |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 9/6/2018 | | 9/10/2018 | | PASS |
Rob Patrick
|
|
|
Plan Modification...Delivered Plan sets to Melissa.
|
Permit Ready to Issue | | | 9/10/2018 | | DONE |
|
|
|
plan mod-pleae do not re issue-as per Rob P no fees due
|
Telephone call | | | 9/10/2018 | | DONE |
|
|
|
cqalled Jeff-left message on his phone that the plan mod is ready for him to pick up-plans are in the drawers for new SFD under J
|
Routing PW Grading-Hillside | 9/6/2018 | | 9/6/2018 | | PASS |
Melissa Jannusch
|
|
|
PLAN MOD APPROVED
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - PUBLIC WORKS | 9/6/2018 | | 9/6/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - FIRE | 8/29/2018 | 8/29/2018 | 8/30/2018 | | PASS |
Ron Johnson
|
|
|
Defensible space maintained in plan mod
|
BLD-Wall Bracing | 8/29/2018 | 8/29/2018 | 8/29/2018 | P | PASS |
Brandon Shaw
|
|
|
Eric Phone #: ###-####
|
Routing - PLANNING | 8/29/2018 | | 8/29/2018 | | PASS |
Nicolette Womack
|
|
|
Send to Ron Johnson for WUI Review.
|
Plan Modification Accepted | | | 8/29/2018 | | DONE |
|
|
|
Plan Mod submitted2 of each sheet1 of12, 3 of 12 & 1.0 - rotate house-of 2-took to Rob P.-
|
Routing - MECHANICAL | 8/27/2018 | | 8/28/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
Plan Modification Accepted | | | 8/27/2018 | | DONE |
|
|
|
New manual j report
|
BLD-Conference | 8/17/2018 | 8/17/2018 | 8/17/2018 | A | DEFR |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Aging Inspection | 8/17/2018 | 8/17/2018 | 8/17/2018 | | DEFR |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Foundation | 4/5/2018 | 4/5/2018 | 4/5/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 4/2/2018 | 4/2/2018 | 4/2/2018 | P | PEND |
Brandon Shaw
|
|
|
Need revised plot plan submitted to Planning Dept. Foot print of structure has been rotated 90 degrees counter-clockwise from original city approved plans Proceed at own risk Footing and rebar- SAT
|
PubWorks Subgrade Approval | 3/29/2018 | 3/29/2018 | 3/29/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 3/16/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 3/5/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 3/5/2018 | 3/5/2018 | 3/5/2018 | | DONE |
Rob Patrick
|
|
|
|
Routing - FIRE | 3/5/2018 | 3/5/2018 | 3/5/2018 | | PASS |
Erika Akin
|
|
|
Residence to be Fire Sprinklered. Attached comments to case
|
Plan assigned to (RDP) | 2/5/2018 | 2/5/2018 | 3/5/2018 | | DONE |
Rob Patrick
|
|
|
2/22 sfd L2 paper...Failed for no secondary drainage from roof.
|
Case Summary (BLD) | | | 3/5/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/5/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/5/2018 | | DONE |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 3/5/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/5/2018 | | 3/5/2018 | | PASS |
Rob Patrick
|
|
|
|
Telephone call | | | 3/5/2018 | | DONE |
Christina Prado
|
|
|
Called Eric to give permit fees due and advised about double fee on retaining portion
|
Permit Ready to Issue | | | 3/5/2018 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Plan resubmittals received | | | 3/2/2018 | | DONE |
|
|
|
Two sheets of page 1, 3 and 5. taken to rob
|
Routing - FIRE | 2/22/2018 | 2/22/2018 | 2/22/2018 | | FAIL |
Scott Arellano
|
|
|
Attached comments and emailed applicant
|
1st review completed | | | 2/22/2018 | | FAIL |
Rob Patrick
|
|
|
Failed for no secondary drainage from roof.
|
Routing - PLAN CHECK | 2/21/2018 | | 2/22/2018 | | FAIL |
Rob Patrick
|
|
|
No secondary drainage from roof.
|
Plan Reviewer's activity | | | 2/21/2018 | | |
|
|
|
Plan was held in PW for 10 days. Plan was received for Plan Check on 2-21-18.
|
Routing - Erosion and Sediment | 2/20/2018 | | 2/20/2018 | | PASS |
Andy J. Long
|
|
|
ESC permit already issued for project, see ESC17-01749
|
Routing - MECHANICAL | | | 2/20/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 2/16/2018 | | 2/20/2018 | | PASS |
Nicolette Womack
|
|
|
Eaves shall not exceed more than 2' into the setback.
|
Routing - PUBLIC WORKS | 2/5/2018 | | 2/16/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 2/6/2018 | | 2/16/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Meeting | | | 2/14/2018 | | DONE |
Christina Prado
|
|
|
Per MIS18-00051 - Stop work for construction of retaining wall without permits. Double fee on permit once obtained per JCB & PW. GRD specifically states no retaining wall
Retaining wall value $16,000, valuation & investigation fee added as directed above
|
Route to Impact Fee Review | 2/5/2018 | 2/8/2018 | 2/6/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Sewer Rating | 2/6/2018 | | 2/6/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 2/5/2018 | | 2/6/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/5/2018 | | DONE |
|
|
|
|
Intake Approval | | | 2/5/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/5/2018 | | DONE |
|
|
|
|
Application received | | 2/5/2018 | | | |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 8/29/2018 | | | | |
Melissa Jannusch
|
|
|
|