Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-00392
StatusIssued
Name EXCELSIOR CONSTRUCTION CO
Site Address 8995 W SHOUP DR
Project NamePine Grove Park
Customer Number 
ePlanReviewNo
Description
(PINE GROVE PARK – RESTROOM/DOG PARK) Permit to construct a new 334 sq. ft. one story, precast concrete restroom/storage building and related site improvements. Approval is contingent upon adhering to the approved plans on file and plan review report. Scope of work includes: construction of concrete footing foundation, installation of precast concrete building that has two accessible restrooms, a storage room and a center equipment room, accessible Hi/Lo drinking fountain, (2) accessible site parking spaces, accessible routes, electrical work, plumbing work, mechanical work and related site work. This building is not fire sprinkled. Note: special inspection required see attached form #310. JG
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/10/20188/10/20188/10/2018PPASS
DetailsMike Jordan
Ok for perm occ. All issues have been resolved.
BLD-Final8/8/20188/9/20188/9/2018PFAIL
DetailsMike Jordan
Please call ahead for lock code // chris Phone #: ###-####. Door hardware is still non code compliant.
FIRE-Final Inspection8/8/20188/9/20188/9/2018APASS
DetailsJim Page
Previously noted items have been completed, final life fire safety inspection complete.

Please call ahead for lock code // chris Phone #: ###-####
PubWorks Occupancy Approval7/26/20187/26/20187/26/2018 DONE
DetailsTiffany Lowery
FIRE-Final Inspection7/10/20187/11/20187/12/2018AFAIL
DetailsTroy Cobbley
Provide single action hardware that is interconnected with the deadbolts or remove the deadbolts. Provide fire extinguishers as discusssed.

Chris Phone #: ###-####
BLD-Foundation4/3/20184/4/20184/4/2018APART
DetailsMike Jordan
Chris Phone #: ###-####. Work in progress. Noted that verts not at 4ft. oc or horizontals rebar does not have the min 18 inch lap length as noted on the city approved plans. Will have special inspection. noted to contractor that no concrete is to be placed until special inspector has verified all non compliance issues have been resolved.
BLD-Foundation4/2/20184/3/20184/3/2018PNR
DetailsMike Jordan
Chris Phone #: ###-####. Rescheduled for tomorrow.
Issue PAID IN FULL permit  3/27/2018 DONE
Telephone call  3/15/2018 DONE
called Chris to let know permit is ready and how much is owed-emailed him the fees due
Plan assigned to (JG)2/7/20182/7/20183/14/2018 PASS
DetailsJavier Guzman
1st rev comp, 3/02 Pine Grove Park-Dog Park & add restrooms paper, pend fire rev
Pending Assignment by CDM2/6/2018 3/14/2018 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK3/14/2018 3/14/2018 PASS
DetailsJavier Guzman
Case Summary (BLD)  3/14/2018 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  3/14/2018 DONE
Permit Ready to Issue  3/14/2018 DONE
GC WILL PAY BUILDING PERMIT ONLY
attached permits are to be paid by City of Boise thru JV
(PRK & SWR)
Print Occupancy Form  3/14/2018 DONE
Route to Impact Fee Review3/12/20183/15/20183/12/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE3/12/20183/12/20183/12/2018 PASS
DetailsScott Arellano
No comments attached. Plans were reviewed for FD access, hydrant proximity and life safety. A fire extinguisher shall be provided for the storage area. Approval subject to satisfactory inspection by PDS fire inspector.
1st review completed  3/12/2018 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK  3/8/2018 FAIL
DetailsJavier Guzman
Routing - MECHANICAL  2/23/2018 PASS
DetailsTroy James
Routing - PLUMBING  2/22/2018 PASS
DetailsBill VanDegrift
1) provide shutoff and drain outside the building on the water service.
2) provide a dcva on the water service.
3) provide shutoff and drain for the water to the drinking fountain.
Routing - Erosion and Sediment2/15/2018 2/20/2018 PASS
DetailsMichael Zawacki
Covered under ESC17-01350
Routing PW Sewer Design2/9/2018 2/15/2018 PASS
DetailsMike Sheppard
Routing - PUBLIC WORKS  2/15/2018 PASS
Routing - PLANNING2/15/2018 2/15/2018 PASS
DetailsCody Riddle
NO PLANNER ASSIGNED.
Routing PW Solid Waste2/9/2018 2/9/2018 PASS
DetailsEvan Carpenter
Routing PW Drainage2/8/2018 2/9/2018 PASS
DetailsBrian Murphy
Routing PW Sewer Rating2/8/2018 2/8/2018 PASS
DetailsMorgan Webb
Routing - Addressing2/7/2018 2/8/2018 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  2/5/2018 DONE
DetailsCandy A. Nichols
Intake Approval  2/5/2018  
DetailsCarl Westfall
Recd Pcfee & Taken To Pln CK  2/5/2018 DONE
Application received 2/5/2018