Letter of compliance/Occupancy | | | 9/25/2018 | | DONE |
|
|
|
|
BLD-Final | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Jim Storey
|
|
|
Brett Phone #: ###-####
|
DOC - Permit Finaled | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | DONE |
Jim Storey
|
|
|
Brett Phone #: ###-#### 238
|
BLD-Energy code compliance | 6/18/2018 | 6/19/2018 | 6/19/2018 | P | PASS |
Jim Storey
|
|
|
Brett Phone #: ###-####
|
BLD-Framing/Rough-in | 6/18/2018 | 6/19/2018 | 6/19/2018 | A | PASS |
Jim Storey
|
|
|
Brett Phone #: ###-####
|
BLD-Framing/Rough-in | 6/14/2018 | 6/15/2018 | 6/15/2018 | A | FAIL |
Brandon Shaw
|
|
|
As per plans/engineering- Back garage shear wall, provide blocking full wall height Provide 20' CS14 strap at top cord of truss, with A35 clips and blocking See plans for details
OK to insulate
|
BLD-Wall Bracing | 5/16/2018 | 5/21/2018 | 5/21/2018 | A | PASS |
Jim Storey
|
|
|
shear- Bret Phone #: ###-####
|
BLD-Foundation | 4/12/2018 | 4/13/2018 | 4/13/2018 | P | PASS |
Jim Storey
|
|
|
Wall // Sabation Phone #: ###-####
|
BLD-Footing | 4/10/2018 | 4/11/2018 | 4/11/2018 | A | PASS |
Brandon Shaw
|
|
|
Sebastian Phone #: ###-####
|
PubWorks Subgrade Approval | 4/11/2018 | 4/11/2018 | 4/11/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 2/23/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 2/22/2018 | | |
|
|
|
|
Routing - FIRE | 2/20/2018 | 2/21/2018 | 2/22/2018 | | PASS |
Erika Akin
|
|
|
Plans were reviewed for FD access, availability of hydrants and defensible space.
|
Routing - Erosion and Sediment | 2/15/2018 | | 2/22/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Site preparation inspection is required.
|
Plan Reviewer's activity | | | 2/22/2018 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 2/22/2018 | | DONE |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 2/22/2018 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/22/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 2/22/2018 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Plan assigned to (M_H) | 2/7/2018 | | 2/22/2018 | | DONE |
Michael Hanson
|
|
|
02/26 sfd L2 Paper
|
Routing - PLAN CHECK | | | 2/22/2018 | | PASS |
Michael Hanson
|
|
|
|
Inspection Record Card- Bld | | | 2/22/2018 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 2/22/2018 | | DONE |
|
|
|
called Brett and left vm permit is ready and fee due.
|
Routing - MECHANICAL | 2/14/2018 | | 2/15/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 2/14/2018 | | 2/14/2018 | | PASS |
Jeff Lowe
|
|
|
driveway shall not be wider than 33-feet
|
Routing - PUBLIC WORKS | 2/9/2018 | | 2/14/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 2/9/2018 | | 2/14/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Route to Impact Fee Review | 2/7/2018 | 2/10/2018 | 2/8/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | | | 2/8/2018 | | PASS |
|
|
|
|
Intake Approval | | | 2/7/2018 | | PASS |
Melissa Jannusch
|
|
|
Cat I per MMJ
|
Plans ACCEPTED BY PLAN TECH | | | 2/7/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/7/2018 | | DONE |
|
|
|
|
Application received | | 2/7/2018 | | | |
|
|
|
|