BLD-Aging Inspection | 12/28/2018 | 12/28/2018 | 12/28/2018 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Aging Inspection | 8/16/2018 | 8/16/2018 | 8/16/2018 | | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 4/3/2018 | 4/4/2018 | 4/4/2018 | P | PART |
Jim Storey
|
|
|
Jacob Eller Phone #: ###-#### framing ok from fire/ reinsp upon trades insp completed
|
Issue PAID IN FULL permit | | | 3/28/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 2/7/2018 | 2/7/2018 | 2/7/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/7/2018 | | 2/7/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/7/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/7/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/7/2018 | | DONE |
Josh Bogle
|
|
|
|
1st review completed | | | 2/7/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 2/7/2018 | | DONE |
|
|
|
need letter from parcel owner giving the ok for anyone beside Jerry Eller to pick to up permit and/or to be the GC-so we need the GC form as well if it's not Jerry Eller
|
Telephone call | | | 2/7/2018 | | DONE |
|
|
|
called Jacob and Jerry to let know permit is ready and how much is owed-left message on Jacob's phone and talked to Jerry-he knows we need the letter if he is going to have Jacob pick up permit as well as having Jacob fill out the GC form
|
Application received | | 2/7/2018 | | | |
|
|
|
|
Routing - PLANNING | 3/5/2019 | | | | FAIL |
|
|
|
Waiting for new site plan
|