Permit Information
Permit NumberBLD18-00434
StatusFinaled
Name ICON ENTERPRISES
Site Address 3701 W CRESCENT RIM DR Unit: 107
Project NameRimcrest #107
Customer Number 
ePlanReviewNo
Description
(RIMCREST #107) All tenant improvements in this building are required to have documents prepared by an Idaho licensed architect per the attached agreement. Permit for the renovation of an existing 1,042 residential dwelling unit with work to include a new one hour rated ceiling assembly per the approved plans, removal end reconstruction of interior nonberaring nonrated walls, reconfiguration of the kitchen area, the installation of new one hour rated can lights, bathroom fans and ceiling registered and the installation of related interior finishes per the approved plans. This building is not fire sprinklered. The individual unit have an alarm system tied to the air handlers to aotomaticaly shut down the units upon detection of smole and are required a separate fire alarm permit. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/4/20192/6/20192/6/2019ACANC
DetailsDave Hannah
Zach Phone #: ###-####
Letter of compliance/Occupancy  2/6/2019 DONE
BLD-Final2/5/20192/5/20192/5/2019PPASS
DetailsDave Hannah
Zach Phone #: ###-####
DOC - Permit Finaled2/5/20192/5/20192/5/2019PPASS
DetailsDave Hannah
FIRE-Final Inspection2/4/20192/5/20192/5/2019PPASS
DetailsTroy Cobbley
Life safety passed. Per the contractor there is no gas fired appliances to drive the carbonmonoxide detectors. I spoke to the building inspector and he is going to follow up.

Zach Phone #: ###-####
BLD-Final1/31/20192/1/20192/1/2019ANR
DetailsJim Storey
ZACH Phone #: ###-#### fire failled
FIRE-Final Inspection1/31/20191/31/20191/31/2019PFAIL
DetailsTroy Cobbley
Repair the smoke alarm and provide city approved plans

ZACH Phone #: ###-####
BLD-Final1/28/20191/28/20191/30/2019PNR
DetailsDave Hannah
Zack Phone #: ###-#### needs mec final
BLD-Aging Inspection1/25/20191/25/20191/28/2019 PEND
DetailsDave Hannah
BLD-Aging Inspection1/24/20191/24/20191/28/2019 PEND
DetailsDave Hannah
BLD-Framing/Rough-in9/12/20189/12/20189/12/2018PPASS
DetailsDave Hannah
Call when there // Zack Phone #: ###-####
FIRE-Conference8/2/20188/2/20188/2/2018PDONE
DetailsTroy Cobbley
I spoke to both Stan and Zac about the need to meet with the fire alarm plan reviewer and verify permit requirements and the possible need to connect the duct smoke detectors to the existing fire alarm system.
FIRE-Conference7/31/20187/31/20187/31/2018PDONE
DetailsTroy Cobbley
Zac and I discussed the duct smoke detectors. I showed him the requirements in the IMC and deferred him to a conference with a mechanical inspector. There appears to be an existing fire alarm system in the building that the duct smoke detectors, if installed, will need to be connected which will require a separate permit.


zac phone # ###-####
BLD-Conference7/30/20187/30/20187/30/2018PPASS
DetailsDave Hannah
Covering up without inspection per Bill - Stan Phone #: ###-#### bath rooms ok
Issue PAID IN FULL permit  7/10/2018 DONE
Permit Ready to Issue  7/6/2018 DONE
NEED
GC form
Rev Cert of Val (if GC is not applicant)
Print Occupancy Form  7/6/2018 DONE
Telephone call  7/6/2018 DONE
called Zach with Icon, told him permit is ready, need GC form and if he is GC what fee will be.
Case Summary (BLD)  7/5/2018 DONE
Routing - PLAN CHECK7/5/2018 7/5/2018 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  7/5/2018 DONE
Plan resubmittals received  6/20/2018 DONE
Multiple copies of Dimensions and sections packet, multiple copies of letter from Kaleb Jones, multiple copies of Mechanical Performance Specification packet and two copies of sheets A0.0/AC-1, A1, A2 and STD-1. Taken to Carl M
Telephone call  6/6/2018 DONE
as per Stan Smith (manager of building) the correct address for the permit is #107 not #7
Route to Impact Fee Review2/24/20182/27/20182/28/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK2/7/2018 2/24/2018 FAIL
DetailsCarl D Madsen
Architect is required
Plan assigned to (CDM)2/19/20182/19/20182/20/2018 DONE
DetailsCarl D Madsen
1st review completed  2/20/2018 FAIL
DetailsCarl D Madsen
Pending architectural submittals
Plan assigned to (CJW)2/7/20182/7/20182/19/2018 DEFR
DetailsCarl Westfall
x (Feb 13 - 5 days) Condo remodel
Plan resubmittals received  2/12/2018 DONE
received one copy of 2007 memo from Boise City Building dept; taken to Carl W.
Plans ACCEPTED BY PLAN TECH  2/7/2018 DONE
Intake Approval  2/7/2018 PASS
Recd Pcfee & Taken To Pln CK  2/7/2018  
First Notice2/5/20192/5/2019   
DetailsDave Hannah
Application received 2/7/2018