BLD-Final | 2/4/2019 | 2/6/2019 | 2/6/2019 | A | CANC |
Dave Hannah
|
|
|
Zach Phone #: ###-####
|
Letter of compliance/Occupancy | | | 2/6/2019 | | DONE |
|
|
|
|
BLD-Final | 2/5/2019 | 2/5/2019 | 2/5/2019 | P | PASS |
Dave Hannah
|
|
|
Zach Phone #: ###-####
|
DOC - Permit Finaled | 2/5/2019 | 2/5/2019 | 2/5/2019 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 2/4/2019 | 2/5/2019 | 2/5/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Per the contractor there is no gas fired appliances to drive the carbonmonoxide detectors. I spoke to the building inspector and he is going to follow up.
Zach Phone #: ###-####
|
BLD-Final | 1/31/2019 | 2/1/2019 | 2/1/2019 | A | NR |
Jim Storey
|
|
|
ZACH Phone #: ###-#### fire failled
|
FIRE-Final Inspection | 1/31/2019 | 1/31/2019 | 1/31/2019 | P | FAIL |
Troy Cobbley
|
|
|
Repair the smoke alarm and provide city approved plans
ZACH Phone #: ###-####
|
BLD-Final | 1/28/2019 | 1/28/2019 | 1/30/2019 | P | NR |
Dave Hannah
|
|
|
Zack Phone #: ###-#### needs mec final
|
BLD-Aging Inspection | 1/25/2019 | 1/25/2019 | 1/28/2019 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 1/24/2019 | 1/24/2019 | 1/28/2019 | | PEND |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 9/12/2018 | 9/12/2018 | 9/12/2018 | P | PASS |
Dave Hannah
|
|
|
Call when there // Zack Phone #: ###-####
|
FIRE-Conference | 8/2/2018 | 8/2/2018 | 8/2/2018 | P | DONE |
Troy Cobbley
|
|
|
I spoke to both Stan and Zac about the need to meet with the fire alarm plan reviewer and verify permit requirements and the possible need to connect the duct smoke detectors to the existing fire alarm system.
|
FIRE-Conference | 7/31/2018 | 7/31/2018 | 7/31/2018 | P | DONE |
Troy Cobbley
|
|
|
Zac and I discussed the duct smoke detectors. I showed him the requirements in the IMC and deferred him to a conference with a mechanical inspector. There appears to be an existing fire alarm system in the building that the duct smoke detectors, if installed, will need to be connected which will require a separate permit.
zac phone # ###-####
|
BLD-Conference | 7/30/2018 | 7/30/2018 | 7/30/2018 | P | PASS |
Dave Hannah
|
|
|
Covering up without inspection per Bill - Stan Phone #: ###-#### bath rooms ok
|
Issue PAID IN FULL permit | | | 7/10/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/6/2018 | | DONE |
|
|
|
NEED
GC form
Rev Cert of Val (if GC is not applicant)
|
Print Occupancy Form | | | 7/6/2018 | | DONE |
|
|
|
|
Telephone call | | | 7/6/2018 | | DONE |
|
|
|
called Zach with Icon, told him permit is ready, need GC form and if he is GC what fee will be.
|
Case Summary (BLD) | | | 7/5/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/5/2018 | | 7/5/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/5/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/20/2018 | | DONE |
|
|
|
Multiple copies of Dimensions and sections packet, multiple copies of letter from Kaleb Jones, multiple copies of Mechanical Performance Specification packet and two copies of sheets A0.0/AC-1, A1, A2 and STD-1. Taken to Carl M
|
Telephone call | | | 6/6/2018 | | DONE |
|
|
|
as per Stan Smith (manager of building) the correct address for the permit is #107 not #7
|
Route to Impact Fee Review | 2/24/2018 | 2/27/2018 | 2/28/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 2/7/2018 | | 2/24/2018 | | FAIL |
Carl D Madsen
|
|
|
Architect is required
|
Plan assigned to (CDM) | 2/19/2018 | 2/19/2018 | 2/20/2018 | | DONE |
Carl D Madsen
|
|
|
|
1st review completed | | | 2/20/2018 | | FAIL |
Carl D Madsen
|
|
|
Pending architectural submittals
|
Plan assigned to (CJW) | 2/7/2018 | 2/7/2018 | 2/19/2018 | | DEFR |
Carl Westfall
|
|
|
x (Feb 13 - 5 days) Condo remodel
|
Plan resubmittals received | | | 2/12/2018 | | DONE |
|
|
|
received one copy of 2007 memo from Boise City Building dept; taken to Carl W.
|
Plans ACCEPTED BY PLAN TECH | | | 2/7/2018 | | DONE |
|
|
|
|
Intake Approval | | | 2/7/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/7/2018 | | |
|
|
|
|
First Notice | 2/5/2019 | 2/5/2019 | | | |
Dave Hannah
|
|
|
|
Application received | | 2/7/2018 | | | |
|
|
|
|