Permit Information
Permit NumberBLD18-00445
StatusFinaled
Name RCH CONSTRUCTION
Site Address 150 E SHERMAN ST
Project NameJones Residence
Customer Number 
ePlanReviewYes
Description
*This structure is required to have a NFPA 13D fire sprinkler system.*** Prescriptive component energy approach*** WUI ZONE A REQUIREMENTS*** HILLSIDE = IN*** Permit for the construction of a new 2294 sq. ft., two story (first story 2048 sq. ft., second story 246 sq. ft.) single family dwelling with 3 bedrooms, 2 bathrooms, approximately 95 sq. ft. of covered patio/porch and a 1470 sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning.

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.

Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/30/20195/2/20195/2/2019APASS
DetailsDave Hannah
Noah Phone #: ###-####
DOC - Permit Finaled5/2/20195/2/20195/2/2019PPASS
DetailsDave Hannah
PubWorks Occupancy Approval5/1/20195/1/20195/1/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Conference3/19/20193/20/20193/20/2019PPART
DetailsTony Young
Noah Phone #: ###-####,,, stair ?s
BLD-Aging Inspection3/13/20193/13/20193/15/2019 PEND
DetailsTony Young
BLD-Aging Inspection3/12/20193/12/20193/13/2019 PEND
DetailsTony Young
BLD-Foundation10/29/201810/30/201810/30/2018ADEFR
DetailsMike Jordan
rebar // Noah Phone #: ###-####. Complted By #415.
BLD-Energy code compliance10/29/201810/29/201810/29/2018PPASS
DetailsTony Young
Noah Phone #: ###-####
BLD-Energy code compliance10/23/201810/24/201810/24/2018APART
DetailsTony Young
Noah Phone #: ###-####,, needs fireplace, and one more sprinkler inspection,, other than that.. all good to cover,, interior will be all 5/8" sheetrock
BLD-Footing10/22/201810/23/201810/23/2018PPART
DetailsTony Young
Noah Phone #: ###-####,, work in progress,, ok
PubWorks Subgrade Approval10/23/201810/23/201810/23/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Framing/Rough-in10/15/201810/16/201810/16/2018APART
DetailsTony Young
Noah Phone #: ###-####,, ok to insulate,, needs one more sprinkler inspection, fireplace inspection,, note:.. no stairs to upper and exterior area in yet
FIRE-Conference10/16/201810/17/201810/16/2018ACANC
DetailsJim Page
Noah Phone #: ###-#### //cancllled per Noah 10/16/18 @ 9:30am
BLD-Conference10/15/201810/15/201810/15/2018PPASS
DetailsTony Young
Noah Phone #: ###-####,, fire block ?s and seal pack ?s
BLD-Conference9/26/20189/26/20189/26/2018PDONE
DetailsBob Archibald
Met with Bob and determined that 35.31" @ stair landing is acceptable in this instance.
BLD-Conference9/14/20189/17/20189/17/2018APEND
DetailsTony Young
Noah Phone #: ###-####,, stair ?s,, may need to get ok from plan review
BLD-Wall Bracing8/22/20188/23/20188/23/2018APART
DetailsTony Young
Noah Phone #: ###-####,, exterior ok
BLD-Foundation6/29/20187/2/20187/2/2018APASS
DetailsTony Young
Nathan--late today is best Phone #: ###-####,, retaining wall
BLD-Concrete6/29/20186/29/20186/29/2018PPART
DetailsTony Young
Nathan--late today is best Phone #: ###-####,, work in progress on retaing wall
BLD-Foundation6/7/20186/8/20186/8/2018APASS
DetailsDave Hannah
Noah Phone #: ###-####
BLD-Footing5/18/20185/21/20185/21/2018APART
DetailsTony Young
Noah Phone #: ###-####,, work in progress
BLD-Footing5/18/20185/18/20185/18/2018PPART
DetailsTony Young
Brent; Phone #: ###-####,, work in progress,, ok
BLD-Conference5/17/20185/17/20185/17/2018APART
DetailsTony Young
Brent,, pre inspection ; Phone #: ###-####,, look at plans,, steps,, general
PubWorks Subgrade Approval5/8/20185/8/20185/8/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  4/23/2018 DONE
Inspection Record Card- Bld  4/23/2018 DONE
OVERRIDE  4/20/2018  
Routing PW Grading-Hillside4/20/2018 4/20/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
Routing - PLAN CHECK4/20/2018 4/20/2018 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  4/20/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  4/20/2018 DONE
Need
GC Form -met
RP - met
Plan assigned to (M_H)3/21/2018 4/20/2018 DONE
DetailsMichael Hanson
04/09 sfd L2 ePlan. 1st review completed - Hillside, structural, & planning deficiencies. MDH
Routing - PLANNING4/11/2018 4/11/2018 PASS
DetailsCeline Acord
per CFH18-00016
Routing - PLAN CHECK3/21/2018 4/9/2018 FAIL
DetailsMichael Hanson
Hillside, structural, & planning deficiencies. MDH
Plan Reviewer's activity  4/9/2018 FAIL
DetailsMichael Hanson
Hillside, structural, & planning deficiencies. MDH
1st review completed  4/9/2018 FAIL
DetailsMichael Hanson
Hillside, structural, & planning deficiencies. MDH
Routing - FIRE3/21/20183/21/20183/27/2018 PASS
DetailsScott Arellano
*This structure is required to have a NFPA 13D fire sprinkler system.* Plans were reviewed for FD access, availability of hydrants and defensible space.
Routing PW Grading-Hillside3/21/2018 3/26/2018 FAIL
DetailsMelissa Jannusch
see changemarks in ePlan
Routing - Erosion and Sediment3/21/2018 3/26/2018 PASS
DetailsMichael Zawacki
RP needed before construction begins. Sherman Hollow Sub, site prep inspection required.
Route to Impact Fee Review3/21/20183/24/20183/22/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL3/21/2018 3/22/2018 PASS
DetailsTroy James
Plans ACCEPTED BY PLAN TECH  3/21/2018 DONE
Intake Approval  3/21/2018 PASS
Recd Pcfee & Taken To Pln CK  3/21/2018 DONE
Routing - Addressing3/21/2018 3/21/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS3/21/2018 3/21/2018 PASS
DetailsMorgan Webb
Intake Approval  3/9/2018 FAIL
3/9/18 - Derek, there are still correction items pending. Please make adjustments, upload the revisions and DO NOT complete your task until you receive the CFH approval letter and the related appeal period has ended. ***THE APPEAL PERMID DOES NOT END UNTIL 5PM 3/19/18. PLEASE DO NOT COMPLETE YOUR TASK UNTIL AFTER THAT TIME**

1. CFH18-00016 approval letter must be uploaded. We cannot start routing until approval is granted and appeal period has lapsed
2. Need Arch site plan - G2 does not show all required dimensions, setbacks & and details
3. Need Stair tread details only, all other details present
5. File naming must be corrected to show sheet number at beginning of description. Please consider removing "DWG" & "Permit Submittal CDs 2-7-18" from the file names.
5. Need to rename files to include sheet number at front of description
Intake Approval  2/16/2018 FAIL
DetailsChristina Prado
2/16/18 - Derek, there are still correction items pending. Please make adjustments, upload the revisions and DO NOT complete your task until you receive the CFH approval letter and the related appeal period has ended.

1. CFH18-00016 approval letter must be uploaded. We cannot start routing until approval is granted and appeal period has lapsed
2. Need Arch site plan - G2 does not show all required dimensions, setbacks & and details
3. Need Stair tread details only, all other details present
4. This location is in the WUI Foothills - Please provide assembly detail for required 1 hr. fire rating
5. File naming must be corrected to show sheet number at beginning of description. Please consider removing "DWG" & "Permit Submittal CDs 2-7-18" from the file names.
5. Need to rename files to include sheet number at front of description
Intake Approval  2/15/2018 FAIL
Cat ll need p& L zoing approval.
A3 and A6 plans need to be of full floor and see checkist for more details.
Application received  2/8/2018 DONE
Application submitted via PDS Online on Feb 8 2018 12:02PM
Routing - PLANNING3/21/2018   FAIL