BLD-Final | 4/30/2019 | 5/2/2019 | 5/2/2019 | A | PASS |
Dave Hannah
|
|
|
Noah Phone #: ###-####
|
DOC - Permit Finaled | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 5/1/2019 | 5/1/2019 | 5/1/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Conference | 3/19/2019 | 3/20/2019 | 3/20/2019 | P | PART |
Tony Young
|
|
|
Noah Phone #: ###-####,,, stair ?s
|
BLD-Aging Inspection | 3/13/2019 | 3/13/2019 | 3/15/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 3/12/2019 | 3/12/2019 | 3/13/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Foundation | 10/29/2018 | 10/30/2018 | 10/30/2018 | A | DEFR |
Mike Jordan
|
|
|
rebar // Noah Phone #: ###-####. Complted By #415.
|
BLD-Energy code compliance | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | PASS |
Tony Young
|
|
|
Noah Phone #: ###-####
|
BLD-Energy code compliance | 10/23/2018 | 10/24/2018 | 10/24/2018 | A | PART |
Tony Young
|
|
|
Noah Phone #: ###-####,, needs fireplace, and one more sprinkler inspection,, other than that.. all good to cover,, interior will be all 5/8" sheetrock
|
BLD-Footing | 10/22/2018 | 10/23/2018 | 10/23/2018 | P | PART |
Tony Young
|
|
|
Noah Phone #: ###-####,, work in progress,, ok
|
PubWorks Subgrade Approval | 10/23/2018 | 10/23/2018 | 10/23/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Framing/Rough-in | 10/15/2018 | 10/16/2018 | 10/16/2018 | A | PART |
Tony Young
|
|
|
Noah Phone #: ###-####,, ok to insulate,, needs one more sprinkler inspection, fireplace inspection,, note:.. no stairs to upper and exterior area in yet
|
FIRE-Conference | 10/16/2018 | 10/17/2018 | 10/16/2018 | A | CANC |
Jim Page
|
|
|
Noah Phone #: ###-#### //cancllled per Noah 10/16/18 @ 9:30am
|
BLD-Conference | 10/15/2018 | 10/15/2018 | 10/15/2018 | P | PASS |
Tony Young
|
|
|
Noah Phone #: ###-####,, fire block ?s and seal pack ?s
|
BLD-Conference | 9/26/2018 | 9/26/2018 | 9/26/2018 | P | DONE |
Bob Archibald
|
|
|
Met with Bob and determined that 35.31" @ stair landing is acceptable in this instance.
|
BLD-Conference | 9/14/2018 | 9/17/2018 | 9/17/2018 | A | PEND |
Tony Young
|
|
|
Noah Phone #: ###-####,, stair ?s,, may need to get ok from plan review
|
BLD-Wall Bracing | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | PART |
Tony Young
|
|
|
Noah Phone #: ###-####,, exterior ok
|
BLD-Foundation | 6/29/2018 | 7/2/2018 | 7/2/2018 | A | PASS |
Tony Young
|
|
|
Nathan--late today is best Phone #: ###-####,, retaining wall
|
BLD-Concrete | 6/29/2018 | 6/29/2018 | 6/29/2018 | P | PART |
Tony Young
|
|
|
Nathan--late today is best Phone #: ###-####,, work in progress on retaing wall
|
BLD-Foundation | 6/7/2018 | 6/8/2018 | 6/8/2018 | A | PASS |
Dave Hannah
|
|
|
Noah Phone #: ###-####
|
BLD-Footing | 5/18/2018 | 5/21/2018 | 5/21/2018 | A | PART |
Tony Young
|
|
|
Noah Phone #: ###-####,, work in progress
|
BLD-Footing | 5/18/2018 | 5/18/2018 | 5/18/2018 | P | PART |
Tony Young
|
|
|
Brent; Phone #: ###-####,, work in progress,, ok
|
BLD-Conference | 5/17/2018 | 5/17/2018 | 5/17/2018 | A | PART |
Tony Young
|
|
|
Brent,, pre inspection ; Phone #: ###-####,, look at plans,, steps,, general
|
PubWorks Subgrade Approval | 5/8/2018 | 5/8/2018 | 5/8/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 4/23/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/23/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 4/20/2018 | | |
|
|
|
|
Routing PW Grading-Hillside | 4/20/2018 | | 4/20/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - PLAN CHECK | 4/20/2018 | | 4/20/2018 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/20/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 4/20/2018 | | DONE |
|
|
|
Need
GC Form -met
RP - met
|
Plan assigned to (M_H) | 3/21/2018 | | 4/20/2018 | | DONE |
Michael Hanson
|
|
|
04/09 sfd L2 ePlan. 1st review completed - Hillside, structural, & planning deficiencies. MDH
|
Routing - PLANNING | 4/11/2018 | | 4/11/2018 | | PASS |
Celine Acord
|
|
|
per CFH18-00016
|
Routing - PLAN CHECK | 3/21/2018 | | 4/9/2018 | | FAIL |
Michael Hanson
|
|
|
Hillside, structural, & planning deficiencies. MDH
|
Plan Reviewer's activity | | | 4/9/2018 | | FAIL |
Michael Hanson
|
|
|
Hillside, structural, & planning deficiencies. MDH
|
1st review completed | | | 4/9/2018 | | FAIL |
Michael Hanson
|
|
|
Hillside, structural, & planning deficiencies. MDH
|
Routing - FIRE | 3/21/2018 | 3/21/2018 | 3/27/2018 | | PASS |
Scott Arellano
|
|
|
*This structure is required to have a NFPA 13D fire sprinkler system.* Plans were reviewed for FD access, availability of hydrants and defensible space.
|
Routing PW Grading-Hillside | 3/21/2018 | | 3/26/2018 | | FAIL |
Melissa Jannusch
|
|
|
see changemarks in ePlan
|
Routing - Erosion and Sediment | 3/21/2018 | | 3/26/2018 | | PASS |
Michael Zawacki
|
|
|
RP needed before construction begins. Sherman Hollow Sub, site prep inspection required.
|
Route to Impact Fee Review | 3/21/2018 | 3/24/2018 | 3/22/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 3/21/2018 | | 3/22/2018 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/21/2018 | | DONE |
|
|
|
|
Intake Approval | | | 3/21/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/21/2018 | | DONE |
|
|
|
|
Routing - Addressing | 3/21/2018 | | 3/21/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 3/21/2018 | | 3/21/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 3/9/2018 | | FAIL |
|
|
|
3/9/18 - Derek, there are still correction items pending. Please make adjustments, upload the revisions and DO NOT complete your task until you receive the CFH approval letter and the related appeal period has ended. ***THE APPEAL PERMID DOES NOT END UNTIL 5PM 3/19/18. PLEASE DO NOT COMPLETE YOUR TASK UNTIL AFTER THAT TIME**
1. CFH18-00016 approval letter must be uploaded. We cannot start routing until approval is granted and appeal period has lapsed
2. Need Arch site plan - G2 does not show all required dimensions, setbacks & and details
3. Need Stair tread details only, all other details present
5. File naming must be corrected to show sheet number at beginning of description. Please consider removing "DWG" & "Permit Submittal CDs 2-7-18" from the file names.
5. Need to rename files to include sheet number at front of description
|
Intake Approval | | | 2/16/2018 | | FAIL |
Christina Prado
|
|
|
2/16/18 - Derek, there are still correction items pending. Please make adjustments, upload the revisions and DO NOT complete your task until you receive the CFH approval letter and the related appeal period has ended.
1. CFH18-00016 approval letter must be uploaded. We cannot start routing until approval is granted and appeal period has lapsed
2. Need Arch site plan - G2 does not show all required dimensions, setbacks & and details
3. Need Stair tread details only, all other details present
4. This location is in the WUI Foothills - Please provide assembly detail for required 1 hr. fire rating
5. File naming must be corrected to show sheet number at beginning of description. Please consider removing "DWG" & "Permit Submittal CDs 2-7-18" from the file names.
5. Need to rename files to include sheet number at front of description
|
Intake Approval | | | 2/15/2018 | | FAIL |
|
|
|
Cat ll need p& L zoing approval.
A3 and A6 plans need to be of full floor and see checkist for more details.
|
Application received | | | 2/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 8 2018 12:02PM
|
Routing - PLANNING | 3/21/2018 | | | | FAIL |
|
|
|
|