Permit Information
Permit NumberBLD18-00450
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2409 S TRAPPER PL
Project NamePonderosa HN 6-1
Customer Number 
ePlanReviewYes
Description
HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. Permit for the construction of a new 3,102 sq. ft., two story (first story 1,721 sq. ft., second story 1,381 sq. ft.) single family dwelling with 4 bedrooms, 3 and a half bathrooms, approximately 340 sq. ft. of covered patio/porch and an 816sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. Prescriptive Energy Code proposed. ***BJM***

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/30/201810/30/201810/30/2018PPASS
DetailsBrandon Shaw
Les Phone #: ###-####
DOC - Permit Finaled10/30/201810/30/201810/30/2018PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results10/30/201810/30/201810/30/2018PDONE
DetailsBrandon Shaw
ACH50- 3.69
ACH50- 3.69
PubWorks Occupancy Approval10/5/201810/5/201810/5/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Energy code compliance7/18/20187/19/20187/19/2018APASS
DetailsMike Jordan
Les Phone #: 2###-####
BLD-Framing/Rough-in7/16/20187/17/20187/17/2018APASS
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Other7/11/20187/12/20187/12/2018APASS
DetailsBrandon Shaw
sofit // Les Phone #: ###-####
BLD-Wall Bracing6/6/20186/7/20186/7/2018APASS
DetailsBrandon Shaw
Work in progress
BLD-Wall Bracing5/8/20185/8/20185/8/2018PPASS
DetailsBrandon Shaw
Work in progress
PubWorks Subgrade Approval5/4/20185/4/20185/4/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Issue PAID IN FULL permit  4/3/2018 DONE
Inspection Record Card- Bld  4/3/2018 DONE
OVERRIDE  3/14/2018  
Plan assigned to (BJM)2/9/20182/9/20183/14/2018 DONE
DetailsBrian McGowan
1st review complete - FAIL- 2/28 sfd L2 ePlan- resubmittals recieved.
Routing - PLAN CHECK3/14/2018 3/14/2018 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  3/14/2018 DONE
DetailsBrian McGowan
Permit Ready to Issue  3/14/2018 DONE
Met
Routing PW Grading-Hillside2/26/2018 2/26/2018 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

Routing - PUBLIC WORKS2/26/2018 2/26/2018 PASS
DetailsRachael Beierle
1st review completed  2/21/2018 FAIL
DetailsBrian McGowan
Misc. items need correcting
Routing - PLAN CHECK2/9/2018 2/21/2018 FAIL
DetailsBrian McGowan
Routing - Erosion and Sediment2/9/2018 2/20/2018 PASS
DetailsMichael Zawacki
Routing - MECHANICAL2/9/2018 2/15/2018 PASS
DetailsTroy James
Routing - FIRE2/9/20182/9/20182/13/2018 PASS
DetailsScott Arellano
No comments attached.
Route to Impact Fee Review2/9/20182/12/20182/12/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing PW Grading-Hillside2/9/2018 2/12/2018 PASS
DetailsMelissa Jannusch


A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
Plans ACCEPTED BY PLAN TECH  2/9/2018 DONE
Intake Approval  2/9/2018 PASS
Recd Pcfee & Taken To Pln CK  2/9/2018 DONE
Routing - PLANNING2/9/2018 2/9/2018 PASS
DetailsSue Cummings
Routing - Addressing2/9/2018 2/9/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS2/9/2018 2/9/2018 PASS
DetailsRachael Beierle
Application received  2/8/2018 DONE
Application submitted via PDS Online on Feb 8 2018 3:39PM