BLD-Final | 10/30/2018 | 10/30/2018 | 10/30/2018 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
DOC - Permit Finaled | 10/30/2018 | 10/30/2018 | 10/30/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 10/30/2018 | 10/30/2018 | 10/30/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.69 ACH50- 3.69
|
PubWorks Occupancy Approval | 10/5/2018 | 10/5/2018 | 10/5/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 7/18/2018 | 7/19/2018 | 7/19/2018 | A | PASS |
Mike Jordan
|
|
|
Les Phone #: 2###-####
|
BLD-Framing/Rough-in | 7/16/2018 | 7/17/2018 | 7/17/2018 | A | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Other | 7/11/2018 | 7/12/2018 | 7/12/2018 | A | PASS |
Brandon Shaw
|
|
|
sofit // Les Phone #: ###-####
|
BLD-Wall Bracing | 6/6/2018 | 6/7/2018 | 6/7/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Wall Bracing | 5/8/2018 | 5/8/2018 | 5/8/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
PubWorks Subgrade Approval | 5/4/2018 | 5/4/2018 | 5/4/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 4/3/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/3/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 3/14/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 2/9/2018 | 2/9/2018 | 3/14/2018 | | DONE |
Brian McGowan
|
|
|
1st review complete - FAIL- 2/28 sfd L2 ePlan- resubmittals recieved.
|
Routing - PLAN CHECK | 3/14/2018 | | 3/14/2018 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/14/2018 | | DONE |
|
|
|
Met
|
Routing PW Grading-Hillside | 2/26/2018 | | 2/26/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - PUBLIC WORKS | 2/26/2018 | | 2/26/2018 | | PASS |
Rachael Beierle
|
|
|
|
1st review completed | | | 2/21/2018 | | FAIL |
Brian McGowan
|
|
|
Misc. items need correcting
|
Routing - PLAN CHECK | 2/9/2018 | | 2/21/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - Erosion and Sediment | 2/9/2018 | | 2/20/2018 | | PASS |
Michael Zawacki
|
|
|
|
Routing - MECHANICAL | 2/9/2018 | | 2/15/2018 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 2/9/2018 | 2/9/2018 | 2/13/2018 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Route to Impact Fee Review | 2/9/2018 | 2/12/2018 | 2/12/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Grading-Hillside | 2/9/2018 | | 2/12/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Plans ACCEPTED BY PLAN TECH | | | 2/9/2018 | | DONE |
|
|
|
|
Intake Approval | | | 2/9/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/9/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 2/9/2018 | | 2/9/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 2/9/2018 | | 2/9/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/9/2018 | | 2/9/2018 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | | 2/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 8 2018 3:39PM
|