BLD-Final | 12/6/2018 | 12/7/2018 | 12/7/2018 | A | PASS |
Brandon Shaw
|
|
|
les Phone #: ###-####
|
DOC - Permit Finaled | 12/7/2018 | 12/7/2018 | 12/7/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 12/7/2018 | 12/7/2018 | 12/7/2018 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.20 ACH50- 4.20
|
BLD-Aging Inspection | 12/7/2018 | 12/7/2018 | 12/7/2018 | | CANC |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 12/6/2018 | 12/6/2018 | 12/6/2018 | | DEFR |
Brandon Shaw
|
|
|
Work in progress
|
OVERRIDE | | | 11/16/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 10/30/2018 | 10/30/2018 | 11/16/2018 | | DONE |
Brian McGowan
|
|
|
11/7 plan mod ePlan
|
CHANGE STATUS TO (ISS) | | | 11/16/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/16/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/16/2018 | | DONE |
|
|
|
PLAN MOD DO NOT RE ISSUE-no fees due
|
Routing - PLAN CHECK | 10/30/2018 | | 11/14/2018 | | PASS |
Brian McGowan
|
|
|
Approved as per Hillside review. Landscape wall relocated on lot, no structural changes.
|
Routing PW Grading-Hillside | 10/30/2018 | | 10/31/2018 | | PASS |
Melissa Jannusch
|
|
|
Plan mod approved
|
PubWorks Occupancy Approval | 10/30/2018 | 10/30/2018 | 10/30/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
Plan Modification Accepted | | | 10/30/2018 | | DONE |
|
|
|
plan mod in e plan-making changes to grading and drainage plan.
uploaded sheet L1.1-assigned to BJM
|
Routing - PUBLIC WORKS | 10/30/2018 | | 10/30/2018 | | PASS |
Morgan Webb
|
|
|
|
BLD-Energy code compliance | 7/25/2018 | 7/25/2018 | 7/25/2018 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Framing/Rough-in | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | PASS |
Jim Storey
|
|
|
Lee Phone #: ###-####
|
BLD-Framing/Rough-in | 7/18/2018 | 7/18/2018 | 7/18/2018 | P | NR |
Dave Hannah
|
|
|
Les Phone #: ###-#### needs truss engineering on site no inspection done
|
BLD-Other | 7/16/2018 | 7/17/2018 | 7/17/2018 | A | PASS |
Brandon Shaw
|
|
|
sofit- Les Phone #: ###-####
|
BLD-Wall Bracing | 6/20/2018 | 6/20/2018 | 6/20/2018 | P | FAIL |
Brandon Shaw
|
|
|
See correction notice 1) Hold downs to be as per plans 2) Drill and epoxy missing hold downs 3) Field and edge nailing to be as shear schedule 4) Up stairs bonus and Master bedroom walls to be CS-WSP as per plans
|
BLD-Foundation | 5/10/2018 | 5/11/2018 | 5/11/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
PubWorks Subgrade Approval | 5/3/2018 | 5/3/2018 | 5/3/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 4/19/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/19/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 2/22/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 2/9/2018 | 2/9/2018 | 2/22/2018 | | DONE |
Brian McGowan
|
|
|
5-28 1st review complete - FAIL - 2/28 sfd L2 ePlan
|
Routing - PLAN CHECK | 2/22/2018 | | 2/22/2018 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/22/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/22/2018 | | DONE |
|
|
|
|
1st review completed | | | 2/21/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 2/9/2018 | | 2/21/2018 | | FAIL |
Brian McGowan
|
|
|
Missing beam sizes, verify which Code review cycle
|
Routing - Erosion and Sediment | 2/9/2018 | | 2/20/2018 | | PASS |
Michael Zawacki
|
|
|
|
Routing - MECHANICAL | 2/9/2018 | | 2/16/2018 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 2/9/2018 | 2/9/2018 | 2/13/2018 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing PW Grading-Hillside | 2/9/2018 | | 2/13/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Route to Impact Fee Review | 2/9/2018 | 2/12/2018 | 2/12/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plans ACCEPTED BY PLAN TECH | | | 2/9/2018 | | DONE |
|
|
|
|
Intake Approval | | | 2/9/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/9/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 2/9/2018 | | 2/9/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 2/9/2018 | | 2/9/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/9/2018 | | 2/9/2018 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | | 2/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 8 2018 4:30PM
|