Permit Information
Permit NumberBLD18-00479
StatusFinaled
Name IDEAL PROPERTY OPTIONS LLC
Site Address 1634 S OAKLAND AVE
Project Name2 STORY SINGLE FAMILY HOUSE
Customer NumberDEMO BLD17-02978
ePlanReviewYes
Description
***Prescriptive component energy approach*** Permit for the construction of a new 2035 sq. ft., two story (first story 1099 sq. ft., second story 936 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 12 sq. ft. of covered patio/porch and a 662 sq. ft. detached garage per the approved plans and any notations. MDH R-1C zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/6/201811/8/201811/8/2018APASS
DetailsJim Storey
call for access code // Sam Phone #: ###-####
DOC - Permit Finaled11/8/201811/8/201811/8/2018PPASS
DetailsJim Storey
BLD-Framing/Rough-in8/10/20188/13/20188/13/2018PPASS
DetailsJim Storey
Jamie Phone #: ###-#### framing and insulation ok to cover
BLD-Framing/Rough-in8/8/20188/9/20188/9/2018PPART
DetailsJim Storey
Jamie Phone #: ###-#### c/n ok to insulate
Plan Modification Accepted  7/26/2018 DONE
new manual j report
Routing - MECHANICAL7/26/2018 7/26/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing7/9/20187/10/20187/10/2018APASS
DetailsJim Storey
Sam Phone #: ###-####
BLD-Wall Bracing7/6/20187/9/20187/9/2018AFAIL
DetailsJim Storey
Sam Phone #: ###-#### nr
BLD-Footing4/17/20184/18/20184/18/2018APASS
DetailsJim Storey
Darrel-prefers late morning Phone #: ###-####
Issue PAID IN FULL permit  3/26/2018 DONE
Inspection Record Card- Bld  3/26/2018 DONE
OVERRIDE  3/13/2018  
Routing - PLANNING3/13/2018 3/13/2018 PASS
DetailsAndrea Tuning
PLANS/APPL TAKEN TO FRONT DESK  3/13/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  3/13/2018 DONE
Plan assigned to (M_H)2/15/2018 3/13/2018 DONE
DetailsMichael Hanson
02/28 sfd L1 ePlan - 1st review completed - Corrections required by planning. MDH
Routing - PLAN CHECK2/15/2018 3/13/2018 PASS
DetailsMichael Hanson
Routing - PLANNING3/2/2018 3/2/2018 FAIL
DetailsAndrea Tuning
Provide the Boise City Design Review Division with a signed and recorded common wall agreement for the attached garages for 1622 (north unit) and 1634 Oakland Avenue (the middle unit).
Routing - PLANNING2/28/2018 2/28/2018 FAIL
DetailsAndrea Tuning
Provide the Boise City Design Review Division with a signed and recorded common wall agreement for the attached garages for 1622 (north unit) and 1634 Oakland Avenue (the middle unit).
Plan Reviewer's activity  2/23/2018 DONE
DetailsMichael Hanson
1st review completed  2/23/2018 FAIL
DetailsMichael Hanson
Corrections required by planning. MDH
Routing - MECHANICAL2/15/2018 2/20/2018 PASS
DetailsTroy James
Route to Impact Fee Review2/15/20182/18/20182/16/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PLANNING2/15/2018 2/16/2018 FAIL
DetailsAndrea Tuning
Remove the cantilever on the second story for the activity/study areato provide the required 3-foot setback.

There is an overhead Idaho Power powerline that runs along the east property line of the site. The applicant will want to coordinate with Cory Bolander at Idaho Power ###-#### to ensure the building separation from the powerline is appropriate. The City will require that the applicant submit written documentation from Idaho Power approving the design prior to the City issuing any building permits.

Provide the Boise City Design Review Division with a common wall agreement for the attached garages for 1622 (north unit) and 1634 Oakland Avenue (the middle unit).
Routing - Addressing2/15/2018 2/16/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS2/15/2018 2/16/2018 PASS
DetailsMorgan Webb
Intake Approval  2/15/2018 FAIL
DetailsChristina Prado
Need IRC letter
Plans ACCEPTED BY PLAN TECH  2/15/2018 DONE
Recd Pcfee & Taken To Pln CK  2/15/2018 DONE
Intake Approval  2/15/2018 PASS
Application received  2/13/2018 DONE
Application submitted via PDS Online on Feb 13 2018 10:44AM