Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-00481
StatusFinaled
Name IDEAL PROPERTY OPTIONS LLC
Site Address 1640 S OAKLAND AVE
Project Name2 STORY SINGLE FAMILY HOUSE
Customer Number*ROUTE TO MICHAEL-HAS OTHERS
ePlanReviewYes
Description
***Prescriptive component energy approach*** Permit for the construction of a new 2412 sq. ft., two story (first story 1258 sq. ft., second story 1154 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 170 sq. ft. of covered patio/porch and a 884 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1C zoning and setbacks per planning. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/13/201812/14/201812/14/2018PPASS
DetailsJim Sly
Please call for access code - Sam Phone #: ###-####
DOC - Permit Finaled12/14/201812/14/201812/14/2018PPASS
DetailsJim Sly
BLD-Framing/Rough-in10/2/201810/3/201810/3/2018APASS
DetailsJim Storey
Sam Phone #: ###-####
BLD-Energy code compliance10/3/201810/3/201810/3/2018APASS
DetailsJim Storey
Sam Phone #: ###-####
BLD-Framing/Rough-in9/27/20189/28/20189/28/2018APART
DetailsJim Storey
Sam Phone #: ###-#### c/n fire blk fireplace/ hanger mlb at stairs/ king stud bearing hvac hood. ok to insulate
BLD-Wall Bracing9/10/20189/11/20189/11/2018APASS
DetailsJim Storey
shear // Jamie Phone #: ###-####
BLD-Footing8/15/20188/16/20188/16/2018APASS
DetailsJim Storey
Daryl Phone #: ###-#### set back ok
BLD-Foundation7/18/20187/19/20187/19/2018ACANC
DetailsJim Storey
Phone #: ###-####
BLD-Concrete7/17/20187/18/20187/18/2018PPART
DetailsJim Storey
Shane-pref before 2pm Phone #: ###-####
BLD-Wall Bracing7/6/20187/9/20187/9/2018AFAIL
DetailsJim Storey
Sam Phone #: ###-####/ nr
Issue PAID IN FULL permit  6/28/2018 DONE
Inspection Record Card- Bld  6/28/2018 DONE
OVERRIDE  5/29/2018  
PLANS/APPL TAKEN TO FRONT DESK  5/29/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  5/29/2018 DONE
Need
RP (expired)
Plan assigned to (M_H)3/27/2018 5/29/2018 DONE
DetailsMichael Hanson
03/14 sfd L1 ePlan. 1st review completed - See design review comments. MDH
Routing - Design Review5/25/2018 5/25/2018 PASS
DetailsAndrea Tuning
Routing - Design Review4/16/2018 4/16/2018 FAIL
DetailsAndrea Tuning
The elevations do not match the Design Review approval for this project. The applicant should either use the approved elevations or obtain a DR approval.
Routing - Design Review4/13/2018 4/13/2018 FAIL
DetailsAndrea Tuning
The elevations do not match the Design Review approval for this project. The applicant should either use the approved elevations or obtain a DR approval.
Plan Reviewer's activity  4/5/2018 DONE
DetailsMichael Hanson
Routing PW Grading-Hillside4/5/2018 4/5/2018 CANC
DetailsMelissa Jannusch
Does not need hillside review. All hillside requirements waived per Melissa Jannusch ###-####
Routing - Design Review4/5/2018 4/5/2018 FAIL
DetailsAndrea Tuning
The elevations do not match the Design Review approval for this project. The applicant should either use the approved elevations or obtain a DR approval.
Routing - PLANNING3/1/2018 4/5/2018 CANC
DetailsMichael Hanson
No review required per CTC. MDH
Routing - PLAN CHECK3/1/2018 4/5/2018 PASS
DetailsMichael Hanson
1st review completed  3/27/2018 FAIL
DetailsMichael Hanson
See comments from design review. MDH
Route to Impact Fee Review3/1/20183/4/20183/2/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL3/1/2018 3/2/2018 PASS
DetailsTroy James
Routing - Design Review3/2/2018 3/2/2018 FAIL
DetailsAndrea Tuning
The elevations do not match the Design Review approval for this project. The applicant should either use the approved elevations or obtain a DR approval.
Routing - Addressing3/1/2018 3/1/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS3/1/2018 3/1/2018 PASS
DetailsMorgan Webb
Intake Approval  3/1/2018 FAIL
Rescheck must be for 2015 now
Plans ACCEPTED BY PLAN TECH  3/1/2018 DONE
Intake Approval  3/1/2018 PASS
Recd Pcfee & Taken To Pln CK  3/1/2018 DONE
Application received  2/13/2018 DONE
Application submitted via PDS Online on Feb 13 2018 10:50AM