BLD-Final | 12/13/2018 | 12/14/2018 | 12/14/2018 | P | PASS |
Jim Sly
|
|
|
Please call for access code - Sam Phone #: ###-####
|
DOC - Permit Finaled | 12/14/2018 | 12/14/2018 | 12/14/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 10/2/2018 | 10/3/2018 | 10/3/2018 | A | PASS |
Jim Storey
|
|
|
Sam Phone #: ###-####
|
BLD-Energy code compliance | 10/3/2018 | 10/3/2018 | 10/3/2018 | A | PASS |
Jim Storey
|
|
|
Sam Phone #: ###-####
|
BLD-Framing/Rough-in | 9/27/2018 | 9/28/2018 | 9/28/2018 | A | PART |
Jim Storey
|
|
|
Sam Phone #: ###-#### c/n fire blk fireplace/ hanger mlb at stairs/ king stud bearing hvac hood. ok to insulate
|
BLD-Wall Bracing | 9/10/2018 | 9/11/2018 | 9/11/2018 | A | PASS |
Jim Storey
|
|
|
shear // Jamie Phone #: ###-####
|
BLD-Footing | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | PASS |
Jim Storey
|
|
|
Daryl Phone #: ###-#### set back ok
|
BLD-Foundation | 7/18/2018 | 7/19/2018 | 7/19/2018 | A | CANC |
Jim Storey
|
|
|
Phone #: ###-####
|
BLD-Concrete | 7/17/2018 | 7/18/2018 | 7/18/2018 | P | PART |
Jim Storey
|
|
|
Shane-pref before 2pm Phone #: ###-####
|
BLD-Wall Bracing | 7/6/2018 | 7/9/2018 | 7/9/2018 | A | FAIL |
Jim Storey
|
|
|
Sam Phone #: ###-####/ nr
|
Issue PAID IN FULL permit | | | 6/28/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/28/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 5/29/2018 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/29/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 5/29/2018 | | DONE |
|
|
|
Need
RP (expired)
|
Plan assigned to (M_H) | 3/27/2018 | | 5/29/2018 | | DONE |
Michael Hanson
|
|
|
03/14 sfd L1 ePlan. 1st review completed - See design review comments. MDH
|
Routing - Design Review | 5/25/2018 | | 5/25/2018 | | PASS |
Andrea Tuning
|
|
|
|
Routing - Design Review | 4/16/2018 | | 4/16/2018 | | FAIL |
Andrea Tuning
|
|
|
The elevations do not match the Design Review approval for this project. The applicant should either use the approved elevations or obtain a DR approval.
|
Routing - Design Review | 4/13/2018 | | 4/13/2018 | | FAIL |
Andrea Tuning
|
|
|
The elevations do not match the Design Review approval for this project. The applicant should either use the approved elevations or obtain a DR approval.
|
Plan Reviewer's activity | | | 4/5/2018 | | DONE |
Michael Hanson
|
|
|
|
Routing PW Grading-Hillside | 4/5/2018 | | 4/5/2018 | | CANC |
Melissa Jannusch
|
|
|
Does not need hillside review. All hillside requirements waived per Melissa Jannusch ###-####
|
Routing - Design Review | 4/5/2018 | | 4/5/2018 | | FAIL |
Andrea Tuning
|
|
|
The elevations do not match the Design Review approval for this project. The applicant should either use the approved elevations or obtain a DR approval.
|
Routing - PLANNING | 3/1/2018 | | 4/5/2018 | | CANC |
Michael Hanson
|
|
|
No review required per CTC. MDH
|
Routing - PLAN CHECK | 3/1/2018 | | 4/5/2018 | | PASS |
Michael Hanson
|
|
|
|
1st review completed | | | 3/27/2018 | | FAIL |
Michael Hanson
|
|
|
See comments from design review. MDH
|
Route to Impact Fee Review | 3/1/2018 | 3/4/2018 | 3/2/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 3/1/2018 | | 3/2/2018 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 3/2/2018 | | 3/2/2018 | | FAIL |
Andrea Tuning
|
|
|
The elevations do not match the Design Review approval for this project. The applicant should either use the approved elevations or obtain a DR approval.
|
Routing - Addressing | 3/1/2018 | | 3/1/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 3/1/2018 | | 3/1/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 3/1/2018 | | FAIL |
|
|
|
Rescheck must be for 2015 now
|
Plans ACCEPTED BY PLAN TECH | | | 3/1/2018 | | DONE |
|
|
|
|
Intake Approval | | | 3/1/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/1/2018 | | DONE |
|
|
|
|
Application received | | | 2/13/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 13 2018 10:50AM
|