Print Statement | | | 10/9/2019 | | DONE |
|
|
|
sent 1st late notice on final fees
|
First Notice | | 6/2/2019 | 6/10/2019 | | DONE |
|
|
|
mailed 6-11
|
Permanent Occupancy | | | 5/23/2019 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/23/2019 | | DONE |
|
|
|
|
BLD-Final | 5/21/2019 | 5/21/2019 | 5/21/2019 | P | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 5/21/2019 | 5/21/2019 | 5/21/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 5/10/2019 | 5/10/2019 | 5/10/2019 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Simons
|
BLD-Final | 5/8/2019 | 5/10/2019 | 5/10/2019 | A | PART |
Brandon Shaw
|
|
|
Temp. C of O is OK'd, see FIR18-00690 notes- Tested system. TCO of 10 days granted to verify 6 corrections. Approved by Ron Johnson
ada room strobes do not turn off until reset. sounders in rooms 101, 107, 118 sound steady (bad base).
2 smokes in beam pockets to be lowered to bottom of beam (greater than .1 less than .4)
|
FIRE-Final Inspection | 5/8/2019 | 5/10/2019 | 5/10/2019 | P | PASS |
Mark Scharfen
|
|
|
Passed fire life safety.n e-lights, exit lights and extinguishers all checked.
Scott Phone #: ###-####
|
Temporary Occupancy | 5/10/2019 | 8/8/2019 | 5/10/2019 | | DONE |
Brittany Hill
|
|
|
|
PubWorks Occupancy Approval | 5/10/2019 | 5/10/2019 | 5/10/2019 | | DONE |
Mike Sheppard
|
|
|
Completed
|
PubWorks Occupancy Approval | 5/10/2019 | 5/10/2019 | 5/10/2019 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 5/10/2019 | 5/10/2019 | 5/10/2019 | | PASS |
Katelyn Menuge
|
|
|
Zoning Final
|
BLD-Ceiling Grid Inspection | 4/1/2019 | 4/1/2019 | 4/1/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Simons
|
Print Occupancy Form | | | 3/6/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/6/2019 | | DONE |
|
|
|
plan mod
|
OVERRIDE | | | 3/4/2019 | | |
|
|
|
|
Plan assigned to (CJW) | 2/26/2019 | 2/26/2019 | 3/4/2019 | | PASS |
Carl Westfall
|
|
|
Plan mod - Aspen Valley (Routed to staff)
|
Routing - PLAN CHECK | 3/1/2019 | | 3/4/2019 | | PASS |
Carl Westfall
|
|
|
IBC plan review approved
|
Routing - Design Review | 3/4/2019 | | 3/4/2019 | | PASS |
Katelyn Menuge
|
|
|
No review required for interior courtyards.
|
Plan Reviewer's activity | | | 3/4/2019 | | PASS |
|
|
|
Plan mod approved
|
Permit Ready to Issue | | | 3/4/2019 | | DONE |
|
|
|
plan mod
|
Routing - PLAN CHECK | 2/27/2019 | | 3/1/2019 | | PASS |
Carl Westfall
|
|
|
Plan intake review approved
|
CHANGE STATUS TO (ISS) | | | 3/1/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/1/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 2/27/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 2/26/2019 | | DONE |
|
|
|
Addendum to add shade trellis structures to interior courtyards of assisted living favility currently under construction.
|
BLD-Wall cover | 1/29/2019 | 1/29/2019 | 1/29/2019 | P | PASS |
Brandon Shaw
|
|
|
Drywall layering area B...
|
BLD-Energy code compliance | 1/18/2019 | 1/18/2019 | 1/18/2019 | P | PART |
Brandon Shaw
|
|
|
Area B exterior walls, ok to insulate...
|
BLD-Framing/Rough-in | 1/15/2019 | 1/15/2019 | 1/15/2019 | P | PASS |
Brandon Shaw
|
|
|
Front and back patio cover soffits...
|
BLD-Wall cover | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Brandon Shaw
|
|
|
Layering drywall Area C...
|
BLD-Wall cover | 1/7/2019 | 1/8/2019 | 1/8/2019 | A | PART |
Brandon Shaw
|
|
|
Ceiling drywall layering inspection, rooms only, BLDG C
|
BLD-Energy code compliance | 1/2/2019 | 1/3/2019 | 1/3/2019 | A | PART |
Brandon Shaw
|
|
|
Section C energy code compliance
|
BLD-Other | 12/27/2018 | 12/27/2018 | 12/27/2018 | P | PART |
Brandon Shaw
|
|
|
Drywall layer inspection Area D, East wing...
|
BLD-Other | 12/20/2018 | 12/21/2018 | 12/21/2018 | A | PART |
Brandon Shaw
|
|
|
Drywall 2nd layer area D, west wing...
|
BLD-Other | 12/17/2018 | 12/18/2018 | 12/18/2018 | A | PART |
Brandon Shaw
|
|
|
Area D west wing rooms,drywall...
|
BLD-Energy code compliance | 12/11/2018 | 12/12/2018 | 12/12/2018 | A | PART |
Brandon Shaw
|
|
|
Energy code for area D
|
BLD-Wall cover | 12/3/2018 | 12/4/2018 | 12/4/2018 | A | PART |
Brandon Shaw
|
|
|
Layering drywall hallway Area A
|
BLD-Other | 11/29/2018 | 11/30/2018 | 11/30/2018 | A | PART |
Brandon Shaw
|
|
|
Drywall layering Area A, resident rooms
|
BLD-Other | 11/27/2018 | 11/28/2018 | 11/28/2018 | A | PART |
Brandon Shaw
|
|
|
Drywall ceiling joint overlapping, BLDG A OK to cover with second layer
|
BLD-Framing/Rough-in | 11/19/2018 | 11/20/2018 | 11/20/2018 | A | PART |
Brandon Shaw
|
|
|
Framing Area A Phone #: ###-#### Inspection requested via web by Scott Simons
|
BLD-Framing/Rough-in | 11/19/2018 | 11/19/2018 | 11/19/2018 | P | CANC |
Jim Sly
|
|
|
Framing Area A Phone #: ###-#### Inspection requested via web by Scott Simons
|
BLD-Energy code compliance | 11/13/2018 | 11/14/2018 | 11/14/2018 | P | PART |
Brandon Shaw
|
|
|
Tenting and spray foam OK to insulate exterior...
|
BLD-Framing/Rough-in | 11/7/2018 | 11/8/2018 | 11/8/2018 | A | PART |
Brandon Shaw
|
|
|
OK to insulate exterior walls, BLDG A...
|
BLD-Other | 11/6/2018 | 11/6/2018 | 11/6/2018 | P | DONE |
Brandon Shaw
|
|
|
Smoke dampers, access panels, and fire wall penetrations...
|
CHANGE STATUS TO (ISS) | | | 10/31/2018 | | DONE |
|
|
|
per Brandon-was finaled by mistake
|
BLD-Conference | 10/30/2018 | 10/30/2018 | 10/30/2018 | P | DONE |
Brandon Shaw
|
|
|
Finaled by mistake, per Brandon Shaw 30OCT2018
|
DOC - Permit Finaled | 10/30/2018 | 10/30/2018 | 10/30/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Conference | 10/24/2018 | 10/26/2018 | 10/26/2018 | A | CANC |
Brandon Shaw
|
|
|
Conference on area B fire rated partitions and ceiling height changes Phone #: ###-#### Inspection requested via web by Scott Simons
|
BLD-Other | 10/23/2018 | 10/23/2018 | 10/23/2018 | P | DONE |
Brandon Shaw
|
|
|
Fire wall final layer inspection and also final shear wall inspection Phone #: ###-#### Inspection requested via web by Scott Simons
|
BLD-Wall Bracing | 10/23/2018 | 10/23/2018 | 10/23/2018 | P | PART |
Brandon Shaw
|
|
|
Exterior shear done...
|
BLD-Other | 10/23/2018 | 10/23/2018 | 10/23/2018 | P | PART |
Brandon Shaw
|
|
|
Fire Walls, BLDG's C & D
|
BLD-Conference | 10/17/2018 | 10/17/2018 | 10/17/2018 | P | DONE |
Brandon Shaw
|
|
|
Clarifications on firewall and fire chase requirements
Smoke partition, BLDG's C/D... Exhaust and Make-up air, O2 room, BLDG A...
|
BLD-Wall cover | 10/10/2018 | 10/10/2018 | 10/10/2018 | P | PART |
Brandon Shaw
|
|
|
Firewall - Second layer, South side, BLD C First layer, North side, BLD C...
|
OVERRIDE | | | 9/27/2018 | | |
|
|
|
|
Plan assigned to (CJW) | 9/18/2018 | 9/18/2018 | 9/27/2018 | | PASS |
Carl Westfall
|
|
|
Plan Mod - Aspen Valley (routed back to applicant)
|
CHANGE STATUS TO (ISS) | | | 9/27/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/27/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/27/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/26/2018 | | 9/27/2018 | | PASS |
Carl Westfall
|
|
|
|
Plan Reviewer's activity | | | 9/27/2018 | | PASS |
|
|
|
Plan mod approved
|
Permit Ready to Issue | | | 9/27/2018 | | DONE |
|
|
|
Plan mod - PLEASE do no re issue-no cert of val attached for plan mod so please have them fill one out
|
BLD-Other | 9/25/2018 | 9/26/2018 | 9/26/2018 | A | PART |
Brandon Shaw
|
|
|
Fire wall, first layer
|
BLD-Wall Bracing | 9/25/2018 | 9/26/2018 | 9/26/2018 | A | PART |
Brandon Shaw
|
|
|
BLDG C
|
Plan resubmittals received | | | 9/26/2018 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 9/20/2018 | | DONE |
|
|
|
Workflow in ePlanReview received
|
Routing - PLAN CHECK | 9/20/2018 | | 9/20/2018 | | FAIL |
Carl Westfall
|
|
|
The 1st plan mod - 1st review did not pass. Revisions were required. Workflow sent back to the applicant.
|
Plan resubmittals requested | | | 9/20/2018 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 9/18/2018 | | DONE |
|
|
|
Mechanical Modifications removing fire dampers, smoke dampers and economzers on select furnaces per architectural info. safety review and metting with mechical constractor
|
BLD-Concrete | 9/12/2018 | 9/13/2018 | 9/13/2018 | P | PASS |
Brandon Shaw
|
|
|
Finish slab footings and floor for Area B Phone #: ###-#### Inspection requested via web by Scott Simons
|
BLD-Energy code compliance | 9/10/2018 | 9/11/2018 | 9/11/2018 | P | PART |
Brandon Shaw
|
|
|
Exterior gypsum inspection area d and area A
|
BLD-Framing/Rough-in | 8/26/2018 | 8/27/2018 | 8/27/2018 | A | PART |
Brandon Shaw
|
|
|
Shear wall inspection for west wing area
|
BLD-Foundation | 8/24/2018 | 8/24/2018 | 8/24/2018 | P | PASS |
Brandon Shaw
|
|
|
Trash enclosure and screen wall
|
BLD-Wall Bracing | 8/23/2018 | 8/23/2018 | 8/23/2018 | P | PART |
Brandon Shaw
|
|
|
Memory care side- work in progress
|
BLD-Footing | 8/22/2018 | 8/23/2018 | 8/23/2018 | P | PASS |
Brandon Shaw
|
|
|
Trash encloser // Dane Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/3/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/3/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 7/2/2018 | | |
|
|
|
|
Plan assigned to (CJW) | 3/6/2018 | 3/6/2018 | 7/2/2018 | | PASS |
Carl Westfall
|
|
|
* (3rd done) (Apr 9 - 25 days) (Mar 6 PI) (90 sheets) Aspen Valley Senior Living
|
Routing - FIRE | 6/27/2018 | | 7/2/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/2/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/2/2018 | | DONE |
|
|
|
NEED
GC FORM
REVISED VALUE
|
Routing PW Street Lights | 6/27/2018 | | 6/28/2018 | | PASS |
Tom Marshall
|
|
|
|
Plan resubmittals received | | | 6/27/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/27/2018 | | 6/27/2018 | | PASS |
Carl Westfall
|
|
|
3rd review
|
Routing - FIRE | 6/13/2018 | 6/20/2018 | 6/20/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Plan resubmittals requested | | | 6/20/2018 | | DONE |
|
|
|
|
Routing - MECHANICAL | 6/13/2018 | | 6/19/2018 | | PASS |
Troy James
|
|
|
|
Routing Off Site - STRUCTURAL | 6/13/2018 | | 6/18/2018 | | PASS |
Carl Westfall
|
|
|
Jordan Terry (KPFF)
|
Routing - PUBLIC WORKS | 6/13/2018 | | 6/13/2018 | | PASS |
Rachael Beierle
|
|
|
Some sinks removed
|
Routing PW Sewer Rating | 6/13/2018 | | 6/13/2018 | | PASS |
Rachael Beierle
|
|
|
some sinks removed. no change in rating. rated per room and not per fixture.
|
Routing PW Drainage | 6/13/2018 | | 6/13/2018 | | PASS |
Brian Murphy
|
|
|
Brian needs to move approval stamp to the most recent version
|
Routing - PLAN CHECK | 6/11/2018 | | 6/13/2018 | | PASS |
Carl Westfall
|
|
|
Pending approval by structural
|
Routing PW Street Lights | 6/13/2018 | | 6/13/2018 | | FAIL |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 6/13/2018 | | 6/13/2018 | | PASS |
DeAnn Brown
|
|
|
Sewer review and work completed under GRD17-00069.
|
Plan resubmittals received | | | 6/11/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 4/17/2018 | 4/20/2018 | 4/23/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan Reviewer's activity | | | 4/20/2018 | | DONE |
|
|
|
The Architect uploaded revised structural sheets. The Consultant Structural Engineer was asked if he could start his 2nd review while the Architect continues to resolve items and upload drawings. The Architect is seeking a footing, foundation, underslabing plumbing, and concrete slab on grade permit. The consultant does not have a task in ePlanReview.
|
Routing - PLAN CHECK | 3/6/2018 | | 4/17/2018 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
1st review completed | | | 4/17/2018 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 4/17/2018 | | DONE |
|
|
|
|
Routing - FIRE | 3/6/2018 | 3/6/2018 | 3/20/2018 | | FAIL |
Scott Arellano
|
|
|
Comments attached in BLD18-00774
|
Routing Off Site - STRUCTURAL | 3/6/2018 | | 3/20/2018 | | FAIL |
Carl Westfall
|
|
|
Jordan Terry (KPFF)
|
Routing - MECHANICAL | 3/6/2018 | | 3/13/2018 | | FAIL |
Troy James
|
|
|
|
Routing PW Sewer Design | 3/7/2018 | | 3/12/2018 | | FAIL |
DeAnn Brown
|
|
|
See notes in eplanreview
|
Routing PW Solid Waste | 3/7/2018 | | 3/8/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Environmental | 3/7/2018 | | 3/8/2018 | | PASS |
Rick Christenson
|
|
|
Exterior Grease Interceptor 1500 Gallon shown
|
Routing PW Street Lights | 3/7/2018 | | 3/8/2018 | | FAIL |
Tom Marshall
|
|
|
|
Routing - PLUMBING | 3/6/2018 | | 3/8/2018 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing - PLANNING | 3/6/2018 | | 3/8/2018 | | PASS |
Katelyn Menuge
|
|
|
DRH17-00409
|
Routing - Design Review | 3/6/2018 | | 3/8/2018 | | PASS |
Katelyn Menuge
|
|
|
DRH17-00409
|
Routing - Addressing | 3/6/2018 | | 3/7/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 3/6/2018 | | 3/7/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 3/6/2018 | | 3/7/2018 | | PASS |
Michael Zawacki
|
|
|
Refer to ESC17-01389
|
Routing PW Drainage | 3/7/2018 | | 3/7/2018 | | PASS |
Brian Murphy
|
|
|
|
Intake Approval | | | 3/6/2018 | | PASS |
|
|
|
|
Intake Approval | | | 2/14/2018 | | FAIL |
Julie Romig
|
|
|
Need: 1. Verification of Legal Lot or Parcel Form signed by PDS Subdivision Staff. Please contact Todd Tucker at TTucker@cityofboise.org.
2. Completed form #310 with Design Professional's information, Owner's information and owner's signature.
3. The City of Boise adopted the 2015 codes on Jan. 1, 2018. Drawings state the 2012 codes as the applicable codes. Please submit a letter requesting to have the application reviewed under the 2012 codes.
|
Application received | | | 2/13/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 13 2018 1:20PM
|