Permit Information
Permit NumberBLD18-00542
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 3812 S MILLBROOK WAY
Project NameBJ 9-4
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 3249 sq. ft., two story (first story 1238 sq. ft., second story 1636 sq. ft., 3rd story 375 sq ft) single family dwelling with 5 bedrooms, 4.5 bathrooms, approximately 246 sq. ft. of covered patio/porch and a 583 sq. ft. attached garage per the approved plans, notations, local codes & ordinances. SP-01 zoning and setbacks per planning. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/9/20188/10/20188/10/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled8/10/20188/10/20188/10/2018PPASS
DetailsBrandon Shaw
BLD-Energy code compliance6/8/20186/8/20186/8/2018PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Other6/5/20186/6/20186/7/2018PPASS
DetailsBrandon Shaw
Soffit Inspection Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Framing/Rough-in6/5/20186/6/20186/7/2018PPEND
DetailsBrandon Shaw
Floor to floor hold downs- 3rd to 2nd story and 2nd to 1st floor

OK to insulate
Plan Modification Accepted  5/24/2018 DONE
new manual j report
Routing - MECHANICAL5/24/2018 5/24/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing5/17/20185/17/20185/17/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Wall Bracing5/16/20185/17/20185/17/2018ACANC
DetailsBrandon Shaw
Call Kyle for walk-through Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled from web by: Kyle Seick
BLD-Conference5/14/20185/14/20185/14/2018PDONE
DetailsBrandon Shaw
Reviewed/ walk thru- shear details and hold down details
BLD-Wall Bracing5/14/20185/14/20185/14/2018PCANC
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Foundation3/28/20183/28/20183/29/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Footing3/23/20183/26/20183/26/2018APASS
DetailsBrandon Shaw
Work in progress
OVERRIDE  3/16/2018  
Plan assigned to (JAB) Josh2/22/20182/22/20183/16/2018 PASS
DetailsJosh Bogle
1st done - several questions
Issue PAID IN FULL permit  3/16/2018 DONE
Inspection Record Card- Bld  3/16/2018 DONE
Routing - PLAN CHECK3/16/2018 3/16/2018 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  3/16/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  3/16/2018 DONE
Met
Routing - PLAN CHECK3/4/2018 3/4/2018 FAIL
DetailsJosh Bogle
Plan Reviewer's activity  3/2/2018 DONE
DetailsJosh Bogle
returned per Chelsea's request to upload new docs - no review at this time - JAB
1st review completed  2/26/2018 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK2/16/2018 2/26/2018 FAIL
DetailsJosh Bogle
Routing - MECHANICAL2/16/2018 2/26/2018 PASS
DetailsTroy James
Plan assigned to (RDP)2/16/20182/16/20182/22/2018 DEFR
DetailsRob Patrick
3/1 sfd L1 ePlan
Route to Impact Fee Review2/16/20182/19/20182/20/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Plans ACCEPTED BY PLAN TECH  2/16/2018 DONE
Intake Approval  2/16/2018 PASS
Recd Pcfee & Taken To Pln CK  2/16/2018 DONE
Routing - PLANNING2/16/2018 2/16/2018 PASS
DetailsSue Cummings
Routing - Addressing2/16/2018 2/16/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS2/16/2018 2/16/2018 PASS
DetailsMorgan Webb
Application received  2/15/2018 DONE
Application submitted via PDS Online on Feb 15 2018 2:49PM