BLD-Final | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.76
|
CHANGE STATUS TO (ISS) | | | 10/25/2018 | | DONE |
|
|
|
per Brandon change status was finaled by mistake
|
BLD-Final | 10/23/2018 | 10/23/2018 | 10/23/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 10/23/2018 | 10/23/2018 | 10/23/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Framing/Rough-in | 8/15/2018 | 8/15/2018 | 8/15/2018 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
OK to insulate
|
BLD-Framing/Rough-in | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
OK to insulate
|
BLD-Framing/Rough-in | 8/7/2018 | 8/8/2018 | 8/8/2018 | A | PART |
Brandon Shaw
|
|
|
Hold downs and straps to be installed as per plans, see pages S1.1 & S2.0 Nail bean brackets/bucket connectors per manufactures instalation instuct...
|
BLD-Other | 8/1/2018 | 8/2/2018 | 8/2/2018 | A | PASS |
Brandon Shaw
|
|
|
Soffitt Inspection requested via web by Kyle Seick
|
Plan Modification Accepted | | | 7/16/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 7/16/2018 | | 7/16/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 6/22/2018 | 6/25/2018 | 6/25/2018 | P | PART |
Brandon Shaw
|
|
|
Hold downs to be as per plans
Work in progess
|
BLD-Foundation | 4/13/2018 | 4/13/2018 | 4/13/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Foundation | 4/12/2018 | 4/12/2018 | 4/13/2018 | P | CANC |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
|
BLD-Footing | 4/11/2018 | 4/11/2018 | 4/11/2018 | P | PASS |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
|
BLD-Footing | 4/9/2018 | 4/9/2018 | 4/9/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
Issue PAID IN FULL permit | | | 3/26/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/26/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 3/19/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 3/19/2018 | | DONE |
|
|
|
Met
|
Plan assigned to (JAB) Josh | 2/26/2018 | 2/26/2018 | 3/16/2018 | | PASS |
Josh Bogle
|
|
|
1st done - several concerns/questions - JAB
|
Routing - PLAN CHECK | 3/16/2018 | | 3/16/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/16/2018 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/4/2018 | | 3/4/2018 | | FAIL |
Josh Bogle
|
|
|
|
Plan assigned to (RDP) | 2/16/2018 | 2/16/2018 | 2/26/2018 | | DEFR |
Rob Patrick
|
|
|
3/1 sfd L1 ePlan
|
Routing - PLAN CHECK | 2/16/2018 | | 2/26/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 2/16/2018 | | 2/26/2018 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 2/26/2018 | | FAIL |
Josh Bogle
|
|
|
|
Route to Impact Fee Review | 2/16/2018 | 2/19/2018 | 2/20/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 2/16/2018 | | 2/16/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 2/16/2018 | | 2/16/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/16/2018 | | 2/16/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/16/2018 | | DONE |
|
|
|
|
Intake Approval | | | 2/16/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/16/2018 | | DONE |
|
|
|
|
Application received | | | 2/15/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 15 2018 3:26PM
|
Intake Approval | | | 2/15/2018 | | FAIL |
|
|
|
Failed because applicant was not finished uploading plans. Do not do prescreen
|