BLD-Final | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.18
|
BLD-Energy code compliance | 4/1/2019 | 4/2/2019 | 4/2/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 3/27/2019 | 3/29/2019 | 3/29/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 3/5/2019 | 3/5/2019 | 3/5/2019 | P | PART |
Brandon Shaw
|
|
|
Second floor hold downs and floor to floor straps to be installed before framing rough-in...
|
BLD-Footing | 5/1/2018 | 5/2/2018 | 5/2/2018 | A | PASS |
Brandon Shaw
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 5/1/2018 | 5/1/2018 | 5/1/2018 | P | CANC |
Brandon Shaw
|
|
|
Pat Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/5/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/5/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 3/1/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 2/20/2018 | 2/20/2018 | 3/1/2018 | | DEFR |
Brian McGowan
|
|
|
3-5 sfd L1 ePlan
|
Routing - PLAN CHECK | 2/20/2018 | | 3/1/2018 | | PASS |
Michael Hanson
|
|
|
|
Plan assigned to (M_H) | 3/1/2018 | | 3/1/2018 | | DONE |
Michael Hanson
|
|
|
03/05 sfd L1 ePlan
|
Plan Reviewer's activity | | | 3/1/2018 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 3/1/2018 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/1/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 3/1/2018 | | DONE |
|
|
|
|
Routing - MECHANICAL | 2/20/2018 | | 2/26/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 2/20/2018 | 2/23/2018 | 2/21/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 2/20/2018 | | 2/21/2018 | | PASS |
Susan Riggs
|
|
|
|
Routing - Addressing | 2/20/2018 | | 2/20/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/20/2018 | | 2/20/2018 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/20/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/20/2018 | | DONE |
|
|
|
|
Intake Approval | | | 2/20/2018 | | PASS |
|
|
|
|
Application received | | | 2/16/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 16 2018 8:31AM
|