BLD-Final | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | PASS |
Brandon Shaw
|
|
|
Rolo Phone #: ###-####
|
BLD-Blower Door Test Results | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.08
|
DOC - Permit Finaled | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 9/6/2018 | 9/7/2018 | 9/7/2018 | A | NR |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
PubWorks Occupancy Approval | 8/24/2018 | 8/24/2018 | 8/24/2018 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
|
BLD-Energy code compliance | 5/11/2018 | 5/11/2018 | 5/11/2018 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 5/8/2018 | 5/9/2018 | 5/9/2018 | A | FAIL |
Brandon Shaw
|
|
|
See correction notice and red paint
OK to insulate
|
BLD-Other | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | PASS |
Brandon Shaw
|
|
|
sofitt // Rolo Phone #: ###-####
|
BLD-Wall Bracing | 4/18/2018 | 4/19/2018 | 4/19/2018 | A | PASS |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
BLD-Foundation | 3/29/2018 | 3/29/2018 | 3/29/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 3/28/2018 | 3/28/2018 | 3/28/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 3/27/2018 | 3/27/2018 | 3/28/2018 | P | CANC |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
|
PubWorks Subgrade Approval | 3/22/2018 | 3/22/2018 | 3/22/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 3/15/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/15/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 3/8/2018 | | |
|
|
|
|
Routing - FIRE | 3/8/2018 | 3/8/2018 | 3/8/2018 | | PASS |
Scott Arellano
|
|
|
Plans were reviewed for FD access, availability of hydrants and defensible space. *Thirty foot defensible space must be maintained between proposed structure and undeveloped land.*
|
Plan assigned to (RDP) | 2/16/2018 | 2/16/2018 | 3/8/2018 | | DONE |
Rob Patrick
|
|
|
3/7 sfd L2 ePlan: Failed due to Patio structural.
|
Routing - Erosion and Sediment | 3/8/2018 | | 3/8/2018 | | PASS |
Michael Zawacki
|
|
|
Site prep required.
|
CHANGE STATUS TO (REV) | | | 3/8/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/8/2018 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 3/8/2018 | | 3/8/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2018 | | DONE |
Rob Patrick
|
|
|
|
Telephone call | | | 3/8/2018 | | DONE |
|
|
|
sent an email that all the fees were not paid
|
1st review completed | | | 3/2/2018 | | FAIL |
Rob Patrick
|
|
|
|
Routing - MECHANICAL | 2/16/2018 | | 2/26/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 2/16/2018 | 2/19/2018 | 2/20/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | 2/16/2018 | | 2/20/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Grading-Hillside | 2/20/2018 | | 2/20/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Application received | | | 2/16/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 16 2018 10:41AM
|
Plans ACCEPTED BY PLAN TECH | | | 2/16/2018 | | DONE |
|
|
|
|
Intake Approval | | | 2/16/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/16/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 2/16/2018 | | 2/16/2018 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 2/16/2018 | | 2/16/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PLAN CHECK | 2/16/2018 | | | | FAIL |
Rob Patrick
|
|
|
Patio structural needs to be re-sized.
|