FIRE-Final Inspection | 6/24/2020 | 6/26/2020 | 6/26/2020 | A | FAIL |
Troy Cobbley
|
|
|
Provide plan mods showing the actual new door locations and actual door swing direction, provide sprinkler and fire alarm modifications (permits) for the required changes due to the new wall installations.
screened // Dustin Phone #: ###-####
|
BLD-Framing/Rough-in | 6/18/2020 | 6/19/2020 | 6/19/2020 | A | PASS |
Mike Jordan
|
|
|
screened // Destin Phone #: ###-####. Framing appears to be done per the approved plans. Mech and elec. issues resolved. needs to call in for fire/life/safety final.
|
BLD-Framing/Rough-in | 2/26/2020 | 2/27/2020 | 2/27/2020 | A | FAIL |
Mike Jordan
|
|
|
Nicole Phone #: ###-####. All work has been completed with no inspections. Appears that electrical work was done as well. Will need to provide the city approved set of plans and small docs. Will need to set up conferances with electrical and fire inspectors as well.
|
Extend Permit 90/180 days | | 2/3/2020 | 2/3/2020 | | DONE |
Joe Bruce
|
|
|
Extended permit (2) two 180 day extensions per email from contractor, Destin Reid w/ D&F Constructors
|
Change Expiration Date Only | | | 2/3/2020 | | DONE |
Joe Bruce
|
|
|
Extended permit 180 days per email from contractor, Destin Reid w/ D&F Constructors
|
Plan Reviewer's activity | | | 1/13/2020 | | DONE |
Javier Guzman
|
|
|
Received phone call from new tenant Phil of “Continuum” stating he would like a C of O for the building, but he was told he could not because there was a pending permit. I contacted BRS architects (Julie B) and told her as responsible person in charge they are needing to get this permit finaled, I also gave Phil BRS’s number so they can communicate with each other and come together in finalizing this permit. Once permit is finaled we can then start an occupancy permit for Phil of “Continuum”
|
Issue PAID IN FULL permit | | | 4/13/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/13/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/10/2018 | | DONE |
Christina Prado
|
|
|
Need
GC From - met
Revised Cert of Value - met
|
Plan assigned to (JG) | 2/22/2018 | 2/22/2018 | 4/9/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 2/28 L1 Conduent TI ePlan*
|
Routing - PLAN CHECK | 4/9/2018 | | 4/9/2018 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/9/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/3/2018 | | 4/7/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - Design Review | 4/3/2018 | | 4/3/2018 | | PASS |
Andrea Tuning
|
|
|
|
Route to Impact Fee Review | 2/28/2018 | 3/3/2018 | 3/1/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 2/28/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 2/22/2018 | | 2/28/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 2/22/2018 | 2/22/2018 | 2/27/2018 | | PASS |
Scott Arellano
|
|
|
Attached comments to case
|
Routing - Design Review | 2/27/2018 | | 2/27/2018 | | FAIL |
Andrea Tuning
|
|
|
A Zoning Certificate is required for teh installation of the proposed sidewalk. We will want the proposed sidewalk to tie into the existing pedestrian network.
|
Routing - PUBLIC WORKS | 2/22/2018 | | 2/23/2018 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 2/22/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - Addressing | 2/22/2018 | | 2/22/2018 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 2/21/2018 | | FAIL |
|
|
|
|
Application received | | | 2/16/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 16 2018 2:47PM
|