BLD-Final | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | PASS |
Brandon Shaw
|
|
|
Kyle Phone #: ###-####
|
DOC - Permit Finaled | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.27
|
OVERRIDE | | | 10/25/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 9/28/2018 | 9/28/2018 | 10/25/2018 | | DONE |
Brian McGowan
|
|
|
Corrections required-
|
Inspection Record Card- Bld | | | 10/25/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/25/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/25/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/25/2018 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 9/28/2018 | 9/28/2018 | 10/24/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 9/28/2018 | | 10/24/2018 | | PASS |
Brian McGowan
|
|
|
Engineering for Drag Truss and Floor Truss repairs provided.
|
Place hold on job | 9/21/2018 | | 10/24/2018 | | DONE |
Brittany Hill
|
|
|
NO FINAL INSPECTION UNTIL ENGINEERING FOR CHANGES TO THE TRUSSES PER BRANDON AND BRIAN
|
Routing - PLAN CHECK | 9/28/2018 | | 10/5/2018 | | FAIL |
Brian McGowan
|
|
|
All the requested engineering was not provided. New sheets showing where the modifications must be provided as well.
|
Plan Reviewer's activity | | | 10/2/2018 | | |
Brian McGowan
|
|
|
emailed Brandon to find out what he required.
|
Plan Modification Accepted | | | 9/28/2018 | | DONE |
|
|
|
plan mod received thru email from Chelsea-plan mod is for floor truss repair and windwall rebuild-started plan mod for her in e plan
|
BLD-Final | 9/20/2018 | 9/21/2018 | 9/21/2018 | P | CANC |
Brandon Shaw
|
|
|
PER BRANDON NEED TO SUBMIT ENGINEERING FOR CHANGES Phone #: ###-#### >> Inspection requested via web by Kyle Seick
|
BLD-Energy code compliance | 7/2/2018 | 7/3/2018 | 7/3/2018 | A | PEND |
Brandon Shaw
|
|
|
Pending Engineering fix for cut floor truss and gusset/stiffeners being installed
|
BLD-Framing/Rough-in | 6/22/2018 | 6/25/2018 | 6/25/2018 | A | FAIL |
Brandon Shaw
|
|
|
Need revised plans and Engineering See correction notice
Ok to insulate
|
BLD-Other | 6/21/2018 | 6/21/2018 | 6/21/2018 | P | PASS |
Brandon Shaw
|
|
|
Soffit/Sheetrock Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Framing/Rough-in | 6/11/2018 | 6/12/2018 | 6/12/2018 | P | NR |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
Plan Modification Accepted | | | 5/24/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 5/24/2018 | | 5/24/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 5/22/2018 | 5/22/2018 | 5/22/2018 | A | NR |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Foundation | 4/4/2018 | 4/4/2018 | 4/4/2018 | P | PASS |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
|
BLD-Footing | 4/3/2018 | 4/3/2018 | 4/3/2018 | P | PASS |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
|
BLD-Footing | 4/2/2018 | 4/2/2018 | 4/2/2018 | A | FAIL |
Brandon Shaw
|
|
|
NR
|
OVERRIDE | | | 3/29/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 2/20/2018 | 2/20/2018 | 3/29/2018 | | DONE |
Brian McGowan
|
|
|
Failed 3-27-Failed 3-20 -Failed - 3-15 Resubmittals received-1st review complete - FAIL- 3-5 sfd L1 ePlan
|
Issue PAID IN FULL permit | | | 3/29/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/29/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/29/2018 | | 3/29/2018 | | PASS |
Brian McGowan
|
|
|
Added (2) additional hours of plan review for the amount of resubmittals.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/29/2018 | | DONE |
|
|
|
Met
|
Routing - PLAN CHECK | 3/28/2018 | | 3/28/2018 | | FAIL |
Brian McGowan
|
|
|
The requested corrections were not resolved on the structural sheets.
|
Routing - PLAN CHECK | 3/20/2018 | | 3/20/2018 | | FAIL |
Brian McGowan
|
|
|
Did not provide requested engineering at front porch. The floor plan changes they made were not accounted for in the structural pages.
|
Routing - PLAN CHECK | 3/15/2018 | | 3/15/2018 | | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 3/2/2018 | | FAIL |
Brian McGowan
|
|
|
misc. structure items
|
Routing - PLAN CHECK | 2/20/2018 | | 3/2/2018 | | FAIL |
Brian McGowan
|
|
|
misc. structure items
|
Routing - MECHANICAL | 2/20/2018 | | 2/27/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 2/20/2018 | 2/23/2018 | 2/21/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plans ACCEPTED BY PLAN TECH | | | 2/20/2018 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 2/20/2018 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/20/2018 | | DONE |
Christina Prado
|
|
|
|
Routing - PLANNING | 2/20/2018 | | 2/20/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 2/20/2018 | | 2/20/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/20/2018 | | 2/20/2018 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | | 2/16/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 16 2018 2:49PM
|